Old 12-06-2017, 08:58 AM   #101
jass
Senior Member
 
Join Date: Jul 2006
Posts: 3,987
Re: Summer St. Gondola

Quote:
Originally Posted by JeffDowntown View Post
I've lived here for 40 years and never made that connection, because it is too low frequency. It is NOT rapid transit.

If you HAPPEN to be at South Station at the magical witching hour when it works, great, otherwise the triple connection is faster and more reliable.
https://d3044s2alrsxog.cloudfront.ne...B%20052316.pdf

8:00
8:01
8:04
8:10
8:12
8:14

If this is a problem for you, I dont think public transit is for you.

And that "magical witching hour" is commonly referred to as "peak demand hour".

After 10pm? Yeah, take the subways. But thats not when most people are moving between the stations is it?
jass is offline   Reply With Quote
Old 12-06-2017, 09:40 AM   #102
JeffDowntown
Senior Member
 
Join Date: May 2007
Location: South Cove
Posts: 2,524
Re: Summer St. Gondola

Quote:
Originally Posted by jass View Post
https://d3044s2alrsxog.cloudfront.ne...B%20052316.pdf

8:00
8:01
8:04
8:10
8:12
8:14

If this is a problem for you, I dont think public transit is for you.

And that "magical witching hour" is commonly referred to as "peak demand hour".

After 10pm? Yeah, take the subways. But thats not when most people are moving between the stations is it?
Actually a lot of us move between stations throughout the day.
__________________
Jeff H.
Downtown, South Cove
JeffDowntown is offline   Reply With Quote
Old 12-06-2017, 09:47 AM   #103
JumboBuc
Senior Member
 
Join Date: Jun 2013
Location: The Fenway
Posts: 1,605
Re: Summer St. Gondola

Quote:
Originally Posted by jass View Post
https://d3044s2alrsxog.cloudfront.ne...B%20052316.pdf

8:00
8:01
8:04
8:10
8:12
8:14

If this is a problem for you, I dont think public transit is for you.

And that "magical witching hour" is commonly referred to as "peak demand hour".

After 10pm? Yeah, take the subways. But thats not when most people are moving between the stations is it?
I responded to this over in the General MBTA Discussion Thread
JumboBuc is offline   Reply With Quote
Old 12-06-2017, 11:55 AM   #104
cybah
Senior Member
 
cybah's Avatar
 
Join Date: Feb 2012
Posts: 278
Re: Summer St. Gondola

Quote:
Originally Posted by datadyne007 View Post
See page 1 for Summer St BRT, btw. ;-)
Thank you. I knew there was a map somewhere of it.. needed it for an argument on Uhub
cybah is offline   Reply With Quote
Old 12-06-2017, 01:26 PM   #105
HenryAlan
Senior Member
 
Join Date: Dec 2009
Location: Rozzie Square
Posts: 1,699
Re: Summer St. Gondola

Quote:
Originally Posted by jass View Post
If this is a daily activity, you will have the trains memorized.

If it isnt, you will use CityMapper.

There is no point in spending money to facilitate a trip that currently works just fine. There are many more pressing issues.
You are fixating on a very specific trip, which I agree is only one transfer. That said, what about somebody going to Kenmore? North Station? Almost anywhere on the Green or Orange requires a second transfer, so the issue is actually more relevant than you seem to think. If the Silver Line could make it as far as Boylston, then it would have that connectivity and become significantly more useful to all OL/GL riders, not just those who happen to have Back Bay/Copley as one of their end points.
HenryAlan is offline   Reply With Quote
Old 12-06-2017, 08:48 PM   #106
JohnAKeith
Senior Member
 
Join Date: Dec 2008
Location: Boston, MA
Posts: 4,147
Re: Summer St. Gondola

You have the BRT using the State Police ramp to get into the Ted Williams Tunnel but the regular SL continues to use the same convoluted route; why?

Quote:
Originally Posted by datadyne007 View Post
See page 1 for Summer St BRT, btw. ;-)
__________________
"You must really like hearing yourself talk, because you do an awful lot of it whether or not you know anything at all about the topic at hand ..."
JohnAKeith is offline   Reply With Quote
Old 12-06-2017, 09:01 PM   #107
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,424
Re: Summer St. Gondola

Quote:
Originally Posted by JohnAKeith View Post
You have the BRT using the State Police ramp to get into the Ted Williams Tunnel but the regular SL continues to use the same convoluted route; why?
The purpose of the diagram was to contrast the BRT proposal vs the current SL in order to sell it for the competition. Presumably, if the MSP caved and let transit vehicles use the ramp, the SL would get to use it as well.
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Old 02-27-2018, 08:38 PM   #108
JumboBuc
Senior Member
 
Join Date: Jun 2013
Location: The Fenway
Posts: 1,605
Re: Summer St. Gondola

Work continues on this:

Globe: Could a gondola system be coming to Boston’s Seaport District?

Quote:
Originally Posted by Jon Chesto, Boston Globe
[T]he dreamers behind the novel idea are dead serious about building a gondola and are slowly trying to bring it closer to reality, including gathering support from the developers of a high-profile Seaport hotel project that was directly in the path of the proposed route.

Millennium Partners and Cargo Ventures envision a one-mile gondola system running above Summer Street to provide transportation between South Station and 12 acres they plan to develop in the city’s marine industrial park. The cable cars would run anywhere from 30 to 50 feet above ground.

Developers of the 1,054-room Omni hotel to be built across from the Boston Convention & Exhibition Center seem more enthusiastic about the idea since Millennium and Cargo Ventures agreed to alter the proposed gondola path slightly. Part of the route would be lowered so the cable cars wouldn’t pass directly in front of guest rooms.

[...]

Meanwhile, the congressman who represents the area, Democratic Representative Stephen Lynch, said he met earlier in February with Mayor Martin J. Walsh and other local elected officials to promote the gondola project.

“The mayor has a solid understanding of the transportation issues,” Lynch said in an e-mail. “This gondola system would carry the equivalent of 40 buses per hour, while reducing vehicular traffic and eliminating carbon emissions. While the route of the gondola may change, I am totally committed to working with Mayor Walsh to move this process forward.”

[...]

The revised route would still be anchored at one end by South Station, with the main trunk running above Summer Street, but ending at the entrance to the marine industrial park instead of within Millennium’s development in the park. Millennium, which has already developed several luxury residential towers in Boston, said it would pay the roughly $100 million construction cost.

The project still faces several hurdles, as neither the City of Boston nor the Massachusetts Port Authority, a major landowner in the neighborhood, have expressed support for it.

[...]
Just imagine what $100 million could do for the Silver Line...
JumboBuc is offline   Reply With Quote
Old 02-27-2018, 10:28 PM   #109
tysmith95
Senior Member
 
Join Date: Feb 2016
Location: North Shore
Posts: 2,094
Re: Summer St. Gondola

Quote:
Originally Posted by JumboBuc View Post
Work continues on this:

Globe: Could a gondola system be coming to Boston’s Seaport District?



Just imagine what $100 million could do for the Silver Line...
Convert the silver line to light rail and guided busway and it would do a much better job.
tysmith95 is online now   Reply With Quote
Old 02-28-2018, 12:23 AM   #110
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 532
Re: Summer St. Gondola

Where’s Marge when you need her?
RandomWalk is offline   Reply With Quote
Old 02-28-2018, 09:02 AM   #111
jass
Senior Member
 
Join Date: Jul 2006
Posts: 3,987
Re: Summer St. Gondola

I recently learned that Philadelphia spent $11 million building an aerial gondola to Camden.

The project was cancelled after only one support pier was built
jass is offline   Reply With Quote
Old 02-28-2018, 03:15 PM   #112
BosDevelop
Senior Member
 
Join Date: Jul 2006
Posts: 1,061
Re: Summer St. Gondola

Quote:
Originally Posted by jass View Post
I recently learned that Philadelphia spent $11 million building an aerial gondola to Camden.

The project was cancelled after only one support pier was built

So that project lacked support? :-)
BosDevelop is offline   Reply With Quote
Old 03-01-2018, 09:36 AM   #113
Justin7
Senior Member
 
Join Date: Dec 2008
Posts: 1,416
Re: Summer St. Gondola

On the other hand, it does make one hell of a sign post. https://goo.gl/maps/pcbDKwUGh8v
__________________
"You cannot take in a whole Boston street with a single glance of the eye and then lose your interest because you have thus taken the edge off future discovery; on the contrary, every step reveals some portion of a building which you could not see before, some change in your vista, and some suggestion of pleasant variety yet to come, which not only keeps your interest alive but heightens it and persuades you to go on."
Justin7 is offline   Reply With Quote
Old 03-01-2018, 09:43 AM   #114
jass
Senior Member
 
Join Date: Jul 2006
Posts: 3,987
Re: Summer St. Gondola

Quote:
Originally Posted by Justin7 View Post
On the other hand, it does make one hell of a sign post. https://goo.gl/maps/pcbDKwUGh8v
Ive been there a bunch and never noticed. It seems way too low to make it across the river. Big ships go by.

Incidentally, the ramp system behind that streetview location is being demolished.
jass is offline   Reply With Quote
Old 03-01-2018, 02:34 PM   #115
reverend_paco
Senior Member
 
reverend_paco's Avatar
 
Join Date: Oct 2012
Posts: 265
Re: Summer St. Gondola

Boston globe has some renderings of what the gondola stations could look like:








There are more in the article:
https://www.bostonglobe.com/metro/20...ofL/story.html
reverend_paco is offline   Reply With Quote
Old 03-01-2018, 04:04 PM   #116
ceo
Senior Member
 
Join Date: May 2009
Posts: 111
Re: Summer St. Gondola

Quote:
Originally Posted by jass View Post
Ive been there a bunch and never noticed. It seems way too low to make it across the river. Big ships go by.
That looks like the base of a tower, not the entire thing. The actual tower would be much taller and T-shaped.
ceo is offline   Reply With Quote
Old 03-01-2018, 08:42 PM   #117
Charlie_mta
Senior Member
 
Charlie_mta's Avatar
 
Join Date: Jul 2006
Posts: 1,165
Re: Summer St. Gondola

This looks a hell of a lot like an elevated rail system, especially at the stations. I thought Boston hated elevated transit, and I can't believe this will ever fly (no pun intended).
Charlie_mta is offline   Reply With Quote
Old 03-01-2018, 09:05 PM   #118
stellarfun
Senior Member
 
Join Date: Dec 2006
Location: salem ma and washington dc
Posts: 4,324
Re: Summer St. Gondola

That hardly looks efficient or speedy. Much cheaper and probably faster to simply run a bus every five minutes.

And every day there's a winf over a certain speed, the gondola doesn't operate?

And it doesn't look to be ADA compliant.
__________________
A man gazing on the stars is at the mercy of the puddles in the road
stellarfun is offline   Reply With Quote
Old 03-01-2018, 11:34 PM   #119
vanshnookenraggen
Moderator
 
vanshnookenraggen's Avatar
 
Join Date: May 2006
Location: New York City
Posts: 6,135
Re: Summer St. Gondola

Tech bro's overly complex solution to a very simple problem. Like the Chinese bus that would drive OVER traffic this is all hype.
__________________
http://www.vanshnookenraggen.com | http://futurembta.com | http://hyperrealcartography.tumblr.com
brivx: well, my philosophy is: as designers, we make a good theater, we dont direct the play
vanshnookenraggen is offline   Reply With Quote
Old 03-01-2018, 11:53 PM   #120
bolehboleh
Senior Member
 
Join Date: Nov 2011
Location: Petaling Jaya, Malaysia
Posts: 382
Re: Summer St. Gondola

I'm all for it. Sure I'd love more busses or even a trolley system there, but this project will do more than just transport people. It will create a certain unique neighbourhood character.
bolehboleh is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Omni Hotel @ BCEC | Summer St | Seaport 12345 Development Projects 184 08-16-2018 01:06 AM
Dorms become hotel during summer? BostonUrbEx Design a Better Boston 15 11-28-2012 05:48 PM
2028 Summer Olympic Bid Game! LordStanleyCup2011 General 11 05-14-2012 10:44 PM
Green Line D branch: complete summer shutdown czsz Transit and Infrastructure 26 11-13-2007 08:47 AM
Portland - Summer 2006 - Round #2 Corey Greater New England 6 09-23-2006 09:07 AM


All times are GMT -5. The time now is 06:06 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.