Old 08-26-2017, 12:50 PM   #1
Mongo
Senior Member
 
Join Date: Oct 2013
Posts: 347
Summer St. Gondola

Surprised nobody posted this yet, Millennium Partners is proposing a gondola system between south station and the marine park down summer st.

Globe article here.

Quote:
A Millennium subsidiary, Cargo Ventures, controls land in the Raymond L. Flynn Marine Park. The company believes a gondola system, running in a line along Summer Street between Marine Park and South Station, could move 15,000 commuters a day.
As to where the money is coming from:

Quote:
Cargo Ventures controls about 12 acres between Northern and Drydock avenues, where the Boston Planning and Development Agency envisions sizable new development. Vaughan said the site has the potential to host thousands of new jobs and he expects Cargo Ventures to release specifics on its building proposal once a new city master plan is approved by the state.

The company’s agreement with the city stipulates Cargo Ventures spend up to $100 million toward transportation to offset the increase in traffic in the area.
Mongo is offline   Reply With Quote
Old 08-26-2017, 01:32 PM   #2
stefalarchitect
Senior Member
 
Join Date: Jan 2015
Posts: 312
Re: Summer St. Gondola

ugh.

I appreciate the investment, but in a gondola??
stefalarchitect is offline   Reply With Quote
Old 08-26-2017, 01:44 PM   #3
Charlie_mta
Senior Member
 
Charlie_mta's Avatar
 
Join Date: Jul 2006
Posts: 1,082
Re: Summer St. Gondola

Why not run a bus through the Silver Line bus tunnel to Drydock Ave?
Charlie_mta is offline   Reply With Quote
Old 08-26-2017, 01:53 PM   #4
JeffDowntown
Senior Member
 
Join Date: May 2007
Location: South Cove
Posts: 2,444
Re: Summer St. Gondola

Quote:
Originally Posted by Charlie_mta View Post
Why not run a bus through the Silver Line bus tunnel to Drydock Ave?
Or spend the money to extend the Silver Line Tunnel under D Street; and buy some more buses.
__________________
Jeff H.
Downtown, South Cove
JeffDowntown is offline   Reply With Quote
Old 08-26-2017, 02:32 PM   #5
tysmith95
Senior Member
 
Join Date: Feb 2016
Location: North Shore
Posts: 1,977
Re: Summer St. Gondola

Or convert the silver line to light rail and extend the tunnel to the airport.
tysmith95 is online now   Reply With Quote
Old 08-26-2017, 05:19 PM   #6
Mongo
Senior Member
 
Join Date: Oct 2013
Posts: 347
Re: Summer St. Gondola

Quote:
Originally Posted by Charlie_mta View Post
Why not run a bus through the Silver Line bus tunnel to Drydock Ave?
They already do, according to google maps it's like a 10 minute ride from south station, and it's a 25 minute walk.

I think the idea is to add more capacity to the point to point route, because they see 15,000 (that seems high) people using it a day, and that would be more than you could add in SL capacity.

It's kind of an indictment of the traffic in the area that they see going over it as the most viable option.
Mongo is offline   Reply With Quote
Old 08-26-2017, 05:43 PM   #7
Proposition Joe
Senior Member
 
Join Date: Oct 2012
Posts: 294
Re: Summer St. Gondola

Put some dedicated bus lane on Summer Street. But that would require taking space away from cars so i guess that is not a realistic solution while spending large amounts of money on gondola infrastructure and operation is serious.
Proposition Joe is offline   Reply With Quote
Old 08-26-2017, 05:51 PM   #8
Shepard
Senior Member
 
Shepard's Avatar
 
Join Date: Mar 2009
Posts: 3,304
Re: Summer St. Gondola

I'm pretty much mode-agnostic at this point, but the one thing that makes anything like this a no-go in my mind is the continuing mentality that South Station is the be-all-end-all access point to the Seaport. What's needed is connectivity. Connect this to North Station, that's one level of good. Connect this to the Back Bay and now you've got a useful transit line.
Shepard is offline   Reply With Quote
Old 08-26-2017, 06:14 PM   #9
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,229
Re: Summer St. Gondola

Quote:
Originally Posted by Proposition Joe View Post
Put some dedicated bus lane on Summer Street. But that would require taking space away from cars so i guess that is not a realistic solution while spending large amounts of money on gondola infrastructure and operation is serious.
This. The answer is BRT on Summer St all the way to Design Center (Reebok HQ) & a branch to Southie/Exelon Plant Redevelopment.

This was a proposal that Jim Aloisi developed & I did the graphics for, on behalf of TransitMatters' proposal for the BostonBRT competition. We were rejected on a technicality because we had no resources to operate the route (something that wasn't made clear in the release), but they really liked the proposal.



Full size: http://i.imgur.com/dp35VVy.png
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL

Last edited by datadyne007; 08-26-2017 at 06:40 PM.
datadyne007 is offline   Reply With Quote
Old 08-27-2017, 01:23 AM   #10
millerm277
Senior Member
 
Join Date: Jun 2013
Posts: 132
Re: Summer St. Gondola

Trying to analyze the idea a little rather than immediately dismissing it (even though I'm very skeptical overall):

Some pros:

- The highest capacity gondola lift in the world that I can find moves about 4,500 passengers per hour (each way). More typical ones are around 2,500-3,500 passengers. Rope speed is typically 1000-1200 feet per minute, or around 11-13mph. While not expandable, this is a pretty significant number of people moved and at a good pace.

- Operational costs are certainly lower per hour than what it would cost to run 25-45 Silver Line round trips to be able to move the same number of people. You need a couple minimum wage people with minimal training and maybe an on-call lift mechanic to run the thing, and it's just a single 500-1000HP electric motor. (with a diesel backup).

- The lift provides fantastic frequency, there's another cabin to board every few seconds.

- Quiet compared to virtually anything else.

- Construction time. You could easily have it up within a year of writing the check for it, with only a month or two of actual construction time.

Some cons:

- If it's broken, it's broken and 100% not running. Sometimes ski lifts break in ways that can make them go down for repairs for at least a full day, occasionally longer.

- It's mostly going to look ugly, not attractive. Tower placement may be an issue as well (especially to run it down a street), you can't have the risk of some truck knocking it over with hundreds of people on it.

- Every additional stop adds expense (including ongoing staffing needs) and complexity/points of failure to the system. You can certainly have 3-4 stops (end terminals and a midstation or two) but a large number is not practical.
millerm277 is offline   Reply With Quote
Old 08-27-2017, 08:22 AM   #11
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,229
Re: Summer St. Gondola

Quote:
Originally Posted by millerm277 View Post
Trying to analyze the idea a little rather than immediately dismissing it (even though I'm very skeptical overall):

Some pros:

- The highest capacity gondola lift in the world that I can find moves about 4,500 passengers per hour (each way). More typical ones are around 2,500-3,500 passengers. Rope speed is typically 1000-1200 feet per minute, or around 11-13mph. While not expandable, this is a pretty significant number of people moved and at a good pace.

- Operational costs are certainly lower per hour than what it would cost to run 25-45 Silver Line round trips to be able to move the same number of people. You need a couple minimum wage people with minimal training and maybe an on-call lift mechanic to run the thing, and it's just a single 500-1000HP electric motor. (with a diesel backup).

- The lift provides fantastic frequency, there's another cabin to board every few seconds.

- Quiet compared to virtually anything else.

- Construction time. You could easily have it up within a year of writing the check for it, with only a month or two of actual construction time.

Some cons:

- If it's broken, it's broken and 100% not running. Sometimes ski lifts break in ways that can make them go down for repairs for at least a full day, occasionally longer.

- It's mostly going to look ugly, not attractive. Tower placement may be an issue as well (especially to run it down a street), you can't have the risk of some truck knocking it over with hundreds of people on it.

- Every additional stop adds expense (including ongoing staffing needs) and complexity/points of failure to the system. You can certainly have 3-4 stops (end terminals and a midstation or two) but a large number is not practical.
More cons, specifically the ones that make this a pointless no-go:
- Can't operate in variety of harsh New England weather conditions (Heavy rain, snow, high wind)
- Intermediate elevated stations would require elevator access to access the platform
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Old 08-27-2017, 08:45 AM   #12
JeffDowntown
Senior Member
 
Join Date: May 2007
Location: South Cove
Posts: 2,444
Re: Summer St. Gondola

Quote:
Originally Posted by datadyne007 View Post
More cons, specifically the ones that make this a pointless no-go:
- Can't operate in variety of harsh New England weather conditions (Heavy rain, snow, high wind)
- Intermediate elevated stations would require elevator access to access the platform
Actually the big gondolas operate in harsh weather all the time. They use them to cross glaciers in the Swiss Alps at serious altitude with whipping wind and blowing snow.

Elevator access to the intermediate platforms (that should be almost completely enclosed) is expensive, though.
__________________
Jeff H.
Downtown, South Cove
JeffDowntown is offline   Reply With Quote
Old 08-27-2017, 08:52 AM   #13
jklo
Senior Member
 
Join Date: Feb 2015
Posts: 116
Re: Summer St. Gondola

I would think anyway there would only be one stop unless it extends past the park. It's only a mile.
jklo is offline   Reply With Quote
Old 08-27-2017, 09:19 AM   #14
bigpicture7
Senior Member
 
Join Date: May 2016
Location: Brighton, MA
Posts: 1,268
Re: Summer St. Gondola

Gondolas are a less than optional solution if there's no height differential. Without a height differential, they are an inferior option.
bigpicture7 is offline   Reply With Quote
Old 08-27-2017, 10:15 AM   #15
DominusNovus
Senior Member
 
Join Date: Jun 2010
Posts: 581
Re: Summer St. Gondola

I like it, mainly because it sounds gimmicky and the company that wants to do it sounds like they're willing to foot the bill (I have to laugh at Lynch complaining that they might charge too much).

That said, to me, if they're going to do something like this, it would make much more sense to do it over the harbor, since thats where these sorts of things are most useful.
__________________
The Goal of Mass Transit should be to get you from Bed to Boss to Bar and back again.
DominusNovus is offline   Reply With Quote
Old 08-28-2017, 05:36 AM   #16
JeffDowntown
Senior Member
 
Join Date: May 2007
Location: South Cove
Posts: 2,444
Re: Summer St. Gondola

Quote:
Originally Posted by datadyne007 View Post
Yeah but the system they're proposing here, to travel a measly mile, is going to be your flimsy amusement park variety, not a robust system like ones they'd have in the Alps.
I thought I read large 40 person gondolas. That is not amusement park grade. That is likely stabilized on twin cables, etc.
__________________
Jeff H.
Downtown, South Cove
JeffDowntown is offline   Reply With Quote
Old 08-28-2017, 08:11 AM   #17
shmessy
Senior Member
 
Join Date: Apr 2010
Posts: 1,028
Re: Summer St. Gondola

Quote:
Originally Posted by Mongo View Post
They already do, according to google maps it's like a 10 minute ride from south station, and it's a 25 minute walk.

I think the idea is to add more capacity to the point to point route, because they see 15,000 (that seems high) people using it a day, and that would be more than you could add in SL capacity.

It's kind of an indictment of the traffic in the area that they see going over it as the most viable option.
But what about the FAA?????
(somebody had to say it )

https://i.pinimg.com/236x/4d/ec/ae/4...ce916f4c9c.jpg
shmessy is offline   Reply With Quote
Old 08-28-2017, 10:52 AM   #18
bakgwailo
Senior Member
 
Join Date: Apr 2016
Posts: 573
Re: Summer St. Gondola

Quote:
Originally Posted by datadyne007 View Post
Yeah but the system they're proposing here, to travel a measly mile, is going to be your flimsy amusement park variety, not a robust system like ones they'd have in the Alps.
I would imagine it would be like the Roosevelt Island one. In my 2+ years on the island it only got shut down twice for high winds - one of which was Sandy (and it stayed open pretty long). Basically anything over either 50 or 70mph winds they shutdown. Snow/etc had no effect. It actually worked really well - but, then again, there was always an actual Subway stop their, too, so it wasn't a one trick pony (as it was apt to go down for repairs, or they would run only one line).
bakgwailo is offline   Reply With Quote
Old 08-28-2017, 11:27 AM   #19
ceo
Member
 
Join Date: May 2009
Posts: 92
Re: Summer St. Gondola

Quote:
Originally Posted by datadyne007 View Post
Yeah but the system they're proposing here, to travel a measly mile, is going to be your flimsy amusement park variety, not a robust system like ones they'd have in the Alps.
Nope. A lot of cities have installed these, particularly in Latin America, and they're the same systems that run in all kinds of harsh weather at ski resorts worldwide.
ceo is offline   Reply With Quote
Old 08-28-2017, 11:39 AM   #20
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,229
Re: Summer St. Gondola

Quote:
Originally Posted by JeffDowntown View Post
I thought I read large 40 person gondolas. That is not amusement park grade. That is likely stabilized on twin cables, etc.
Quote:
Originally Posted by bakgwailo View Post
I would imagine it would be like the Roosevelt Island one. In my 2+ years on the island it only got shut down twice for high winds - one of which was Sandy (and it stayed open pretty long). Basically anything over either 50 or 70mph winds they shutdown. Snow/etc had no effect. It actually worked really well - but, then again, there was always an actual Subway stop their, too, so it wasn't a one trick pony (as it was apt to go down for repairs, or they would run only one line).
Quote:
Originally Posted by ceo View Post
Nope. A lot of cities have installed these, particularly in Latin America, and they're the same systems that run in all kinds of harsh weather at ski resorts worldwide.
Apologies. The article I had read about this news didn't mention the type. I stand corrected & will edit the original post. In Latin America (and ski resorts) they tend to climb slopes too. (It's a good way to climb a slope)

The fact this is even being discussed is just colossally stupid and serves as yet another distraction to stand in the way of fixing our existing transit system.
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Omni Hotel @ BCEC | Summer St | Seaport 12345 Development Projects 140 04-06-2018 10:43 AM
Dorms become hotel during summer? BostonUrbEx Design a Better Boston 15 11-28-2012 05:48 PM
2028 Summer Olympic Bid Game! LordStanleyCup2011 General 11 05-14-2012 10:44 PM
Green Line D branch: complete summer shutdown czsz Transit and Infrastructure 26 11-13-2007 08:47 AM
Portland - Summer 2006 - Round #2 Corey Greater New England 6 09-23-2006 09:07 AM


All times are GMT -5. The time now is 12:26 PM.