Does anyone know if the 47/CT2 stop by BU Academy is getting eliminated? It doesn't look like it will meld well with the bike lanes.
whittle is offline   Reply With Quote
Old 06-01-2017, 01:29 PM   #42
tysmith95
Senior Member
 
Join Date: Feb 2016
Location: North Shore
Posts: 2,094
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by Digital_Islandboy View Post
I don't see how anything would get better unless somethings were pushed underground or you create an 'El'. The Boston College "B" line runs down the center of Comm. Ave. That alone plus the lanes on the either side make it feel like you're crossing a HUGE expense of roadway (punctuated by rails in the middle).

This location is multi-level. the Mass Pike is under there and the Mass Pike leads onto an overpass at that same relative spot above the Grand Junction railroad tracks.
So you have Comm. Ave, above the Mass. Pike+Storrow Drive, and also above the Grand Junction rail yard / Commuter Rail. 10 lanes it-is, unless you have a plan to get some elements out of that junction. With all of these things converging there it means you have to start further away to begin to move things on different grading and that increases costs.

It appears that a few different designs have been thrown around. But there's a few light cycles that have to be implemented there as well.
--
Commonwealth Avenue Bridge (Boston, MA) - VISSIM Simulation
That simulation is so inaccurate. Pedestrians are acutally stopping at the do not walk sign. That doesn't happen in Boston.
tysmith95 is offline   Reply With Quote
Old 06-02-2017, 09:49 AM   #43
sm89
Senior Member
 
Join Date: Apr 2014
Location: Somerville
Posts: 702
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by tysmith95 View Post
That simulation is so inaccurate. Pedestrians are acutally stopping at the do not walk sign. That doesn't happen in Boston.
I think someone mentioned it in a different thread, but people don't follow walk signals because most engineers don't time signals "properly". They are timed to provide flexibility and efficiency for vehicular traffic, while pedestrians are given the bare minimum. This sort of makes sense because cars cause gridlock, but no one really notices a huge queue of bikes or peds. It doesn't create widespread access issues.

Anyway, for example, 7 seconds is the min walk time, so typically they will always get that, and just that. The sooner the signal goes to don't walk, the more "flex time" they have available to have the vehicular signals respond to the current traffic volumes. This usually means people are waiting to cross the street when it is perfectly safe to walk.... so why not cross "illegally"?
sm89 is offline   Reply With Quote
Old 06-02-2017, 01:38 PM   #44
North Shore
Member
 
Join Date: Aug 2014
Posts: 57
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by sm89 View Post
I think someone mentioned it in a different thread, but people don't follow walk signals because most engineers don't time signals "properly". They are timed to provide flexibility and efficiency for vehicular traffic, while pedestrians are given the bare minimum. This sort of makes sense because cars cause gridlock, but no one really notices a huge queue of bikes or peds. It doesn't create widespread access issues.

Anyway, for example, 7 seconds is the min walk time, so typically they will always get that, and just that. The sooner the signal goes to don't walk, the more "flex time" they have available to have the vehicular signals respond to the current traffic volumes. This usually means people are waiting to cross the street when it is perfectly safe to walk.... so why not cross "illegally"?
As someone who designs these for a living, this is false.

The walk interval (solid white pedestrian indication shown) is an absolute minimum of 7 seconds. To that, we add a calculated pedestrian clearance time which assumes a pedestrian is about to enter the crosswalk and grants sufficient time for them to make it through (the flashing orange hand phase) before the hand indication turns to a steady orange. And on top of that we add a 3 or 4 second buffer before the vehicle phase kicks in to ensure all pedestrians are clear.

And on top of that, the calculations are predicated on a minimum 3.5 ft/s walk speed, which can be lengthened when you consider external factors such as if the crossing is used by elderly people or if there is a high number of pedestrians concentrated there at a particular time.
North Shore is offline   Reply With Quote
Old 06-02-2017, 02:44 PM   #45
JeffDowntown
Senior Member
 
Join Date: May 2007
Location: South Cove
Posts: 2,524
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by North Shore View Post
As someone who designs these for a living, this is false.

The walk interval (solid white pedestrian indication shown) is an absolute minimum of 7 seconds. To that, we add a calculated pedestrian clearance time which assumes a pedestrian is about to enter the crosswalk and grants sufficient time for them to make it through (the flashing orange hand phase) before the hand indication turns to a steady orange. And on top of that we add a 3 or 4 second buffer before the vehicle phase kicks in to ensure all pedestrians are clear.

And on top of that, the calculations are predicated on a minimum 3.5 ft/s walk speed, which can be lengthened when you consider external factors such as if the crossing is used by elderly people or if there is a high number of pedestrians concentrated there at a particular time.
I understand your professional description. But you must not be doing this work for the City of Boston, because that is not what happens at many intersections in the city. For example, I can point to numerous intersections in my neighborhood with zero clearance time between the change to steady red hand and a green light for the traffic. ZERO. Also the count-down crossing time for 3 wide lanes of traffic plus two parking lanes is 12 seconds (roughly 50 ft. total therefore short by your calculation). And these are intersections frequented by the elderly and children.

One I am thinking of one in particular on Tremont Street that is bounded by a YMCA, an elementary school, a park with a playground and senior housing. Demographics crossing that intersection are pretty easy to estimate.
__________________
Jeff H.
Downtown, South Cove
JeffDowntown is offline   Reply With Quote
Old 06-02-2017, 02:57 PM   #46
cden4
Senior Member
 
Join Date: Sep 2007
Posts: 1,035
Re: Comm Ave Bridge Replacement.

North Shore, the issue is that the walk signals will often count down to zero long before the concurrent green turns to red. There are numerous technical reasons for this, but the end result is pedestrians are left confused and wondering why the walk signal now says don't walk even though the signal is still green for cars. So they stop trusting the walk signals and just go anyway. (It's not just a 3-4 second clearance time either, it's like 10-30 seconds depending on location.)

Other cities seem to have figured it out. The walk signals all last as long as the concurrent green, and they always come up on every cycle automatically. It's not rocket science, but Boston seems to be totally unable to figure it out.
cden4 is offline   Reply With Quote
Old 06-02-2017, 07:27 PM   #47
sm89
Senior Member
 
Join Date: Apr 2014
Location: Somerville
Posts: 702
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by North Shore View Post
As someone who designs these for a living, this is false.

The walk interval (solid white pedestrian indication shown) is an absolute minimum of 7 seconds. To that, we add a calculated pedestrian clearance time which assumes a pedestrian is about to enter the crosswalk and grants sufficient time for them to make it through (the flashing orange hand phase) before the hand indication turns to a steady orange. And on top of that we add a 3 or 4 second buffer before the vehicle phase kicks in to ensure all pedestrians are clear.

And on top of that, the calculations are predicated on a minimum 3.5 ft/s walk speed, which can be lengthened when you consider external factors such as if the crossing is used by elderly people or if there is a high number of pedestrians concentrated there at a particular time.
Exactly, but your statement doesn't prove anything false. The ped clearance (flashing don't walk) is not considered part of the "walk time" as we are discussing it. It is the time provided to finish walking. Boston likes to always set the walk time to the minimum of 7 seconds, even if its concurrent with the vehicular lanes. If you keep the walk time as short as possible, you have more freedom to adjust the green times for cars based on traffic observations. Boston has a traffic management center in City Hall that can change most signal timings. The pedestrian timings though can only be changed in the actual control box and are therefore an annoyance to managing car traffic. Sometimes an approach might have no more cars and you want it to go to red ASAP, but you can't if you then need the crosswalk to enter flashing don't walk. If the crosswalk has already finished its sequence, then you can change to yellow and red immediately. This is only possible if you keep it at its minimum walk time.
sm89 is offline   Reply With Quote
Old 06-02-2017, 07:50 PM   #48
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,424
Re: Comm Ave Bridge Replacement.

Memorial Drive will be open to traffic on Sunday for the dry run of the detours MassDOT is proposing for the Pike lane closures related to this project. The Pike this weekend will also be dropped down to the 2 lanes that will be open during this project. This weekend is a dry run/experiment of the detours.

MassDOT and DCR believe they need Memorial in addition to Storrow to handle the traffic flow. This is a pretty awful idea. It's just a Sunday. Traffic is already lighter. Storrow/SFR can handle any overflow. Memorial isn't needed & should remain open to pedestrians like all Sundays in the summer.
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL

Last edited by datadyne007; 06-02-2017 at 08:08 PM.
datadyne007 is offline   Reply With Quote
Old 07-20-2017, 12:02 PM   #49
matredsoxfan
Senior Member
 
Join Date: Apr 2013
Posts: 337
Re: Comm Ave Bridge Replacement.

The major bridge replacement work begins NEXT WEEK

7:00PM on Wednesday July 26th: Green Line B branch shutsdown

7:00PM on Thursday July 27th: Commonwealth Avenue between Packards Corner & Kenmore Square as well as Boston University Bridge close to private vehicular & truck traffic.

9:00PM on Friday July 28th: I-90 is reduced to 2 lanes in each dirrection and all traffic is diverted onto to the Westbound barrel of the pike.
matredsoxfan is offline   Reply With Quote
Old 08-01-2017, 08:50 AM   #50
CSTH
Senior Member
 
Join Date: Oct 2009
Posts: 1,560
Re: Comm Ave Bridge Replacement.

Looks like they are going to have all the new beams in place by the end of the day today.

Too soon to speculate that they might re-open the pike ahead of schedule?

https://app.oxblue.com/open/BU/bridgedeck
CSTH is offline   Reply With Quote
Old 08-01-2017, 09:10 AM   #51
bigpicture7
Senior Member
 
Join Date: May 2016
Location: Brighton, MA
Posts: 1,313
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by CSTH View Post
Looks like they are going to have all the new beams in place by the end of the day today.

Too soon to speculate that they might re-open the pike ahead of schedule?

https://app.oxblue.com/open/BU/bridgedeck
I may be mistaken, but won't they be at the 2/3rd point today rather than done with the beams?

It looks like there are 3 spans to the bridge. One is completely covered with new beams. The other is about half. The third span has not been demo'd yet.

I could be viewing this wrong.

(zoom in to see what I mean)
bigpicture7 is offline   Reply With Quote
Old 08-01-2017, 09:14 AM   #52
CSTH
Senior Member
 
Join Date: Oct 2009
Posts: 1,560
Re: Comm Ave Bridge Replacement.

Oh i see, thanks. Yes looks like they've done the rail and the EB barrels, but the WB barrel is still to come. Tx.
CSTH is offline   Reply With Quote
Old 08-02-2017, 06:27 PM   #53
AdamBC
Senior Member
 
AdamBC's Avatar
 
Join Date: Feb 2007
Location: Brookline
Posts: 568
Re: Comm Ave Bridge Replacement.

Here are some photos from this past weekend:

Approaching from Agganis - the number of people confused by this sign was astounding.



New bridge supports arriving by truck:





One big support parked on the Pike. Note that inbound traffic is down to a single lane. I also assume that the tolls were set up to either ignore the inbound traffic or to play nice with the traffic heading in the opposite direction of the 'primary' camera.





The construction zone.





AdamBC is offline   Reply With Quote
Old 08-02-2017, 07:30 PM   #54
BussesAin'tTrains
Senior Member
 
Join Date: Jan 2012
Location: Union Sq, Somerville
Posts: 3,415
Re: Comm Ave Bridge Replacement.

Does the MBTA usually use charter busses for replacement service? I've never seen that before when Red is closed north of Harvard.
BussesAin'tTrains is offline   Reply With Quote
Old 08-02-2017, 08:29 PM   #55
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,424
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by BussesAin'tTrains View Post
Does the MBTA usually use charter busses for replacement service? I've never seen that before when Red is closed north of Harvard.
Baker & his cronies are obsessed with contracting everything for the T out to private bidders because PPPs are magic. Under Baker, the T can't do anything on its own. The transit service isn't allowed to be a transit service.

Peter Pan & Paul Revere are providing bustitution services for this contract. PP is using their high level buses and PR is using some transit-style buses.
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Old 08-02-2017, 08:31 PM   #56
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 2,958
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by datadyne007 View Post
Baker & his cronies are obsessed with contracting everything for the T out to private bidders because PPPs are magic. Under Baker, the T can't do anything on its own. The transit service isn't allowed to be a transit service.

Peter Pan & Paul Revere are providing bustitution services for this contract. PP is using their high level buses and PR is using some transit-style buses.
Honestly, it's probably because the T doesn't have enough spare buses during rush hour...
Equilibria is offline   Reply With Quote
Old 08-02-2017, 08:41 PM   #57
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,424
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by Equilibria View Post
Honestly, it's probably because the T doesn't have enough spare buses during rush hour...
The T literally just finished receiving their 375 new buses in July, which are intended to be 1-for-1 replacements. They could have used plenty of the old buses that were still in fine working order to provide the bustitution.
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Old 08-03-2017, 07:42 AM   #58
dwash59
Senior Member
 
Join Date: Nov 2014
Location: Allston
Posts: 557
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by datadyne007 View Post
The T literally just finished receiving their 375 new buses in July, which are intended to be 1-for-1 replacements. They could have used plenty of the old buses that were still in fine working order to provide the bustitution.
Do they have room to store the old buses in addition to the new ones? Would they have room to store them for use next year as well (less relevant to the question of whether they could be using them right now)?
dwash59 is offline   Reply With Quote
Old 08-03-2017, 08:00 AM   #59
estyle
Senior Member
 
Join Date: Jan 2013
Posts: 189
Re: Comm Ave Bridge Replacement.

Great pictures, thanks for posting. I always find the staging/organization for projects like this fascinating. And that's an interesting shot of the new BU theater.

Quote:
Originally Posted by AdamBC View Post
Here are some photos from this past weekend:

Approaching from Agganis - the number of people confused by this sign was astounding.



New bridge supports arriving by truck:





One big support parked on the Pike. Note that inbound traffic is down to a single lane. I also assume that the tolls were set up to either ignore the inbound traffic or to play nice with the traffic heading in the opposite direction of the 'primary' camera.





The construction zone.





estyle is offline   Reply With Quote
Old 08-03-2017, 09:26 AM   #60
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 532
Re: Comm Ave Bridge Replacement.

Quote:
Originally Posted by datadyne007 View Post
The T literally just finished receiving their 375 new buses in July, which are intended to be 1-for-1 replacements. They could have used plenty of the old buses that were still in fine working order to provide the bustitution.
If they are replacements for the CNG buses, then they don't have spares. The CNG tanks have expired, so those buses are off the road in dead storage.
RandomWalk is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
What building would you nominate for replacement Boston02124 Boston Architecture & Urbanism 72 02-01-2017 07:38 PM
Bowker Overpass replacement? kz1000ps Transit and Infrastructure 432 08-08-2014 07:40 PM
Tobin Bridge Relocation/Replacement davem Design a Better Boston 17 11-13-2013 11:08 PM
Whittier Bridge Replacement AmericanFolkLegend Transit and Infrastructure 14 07-10-2013 01:02 PM
Comm Ave nico Transit and Infrastructure 0 12-09-2011 09:54 AM


All times are GMT -5. The time now is 09:00 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.