Re: Parcel K | Northern Avenue | Seaport

Quote:
Originally Posted by mdd View Post
Isn't Parcel K the Watermark, next to the Yotel?
No, this is Massport Parcel K, down by the end of Seaport Blvd. Intersection with Haul Rd. Can we get a name change, please?
Equilibria is offline   Reply With Quote
Old 04-28-2016, 03:53 PM   #22
vanshnookenraggen
Moderator
 
vanshnookenraggen's Avatar
 
Join Date: May 2006
Location: New York City
Posts: 6,164
Re: Parcel K | Northern Avenue | Seaport

I dig that modern courtyard.
__________________
http://www.vanshnookenraggen.com | http://futurembta.com | http://hyperrealcartography.tumblr.com
brivx: well, my philosophy is: as designers, we make a good theater, we dont direct the play
vanshnookenraggen is online now   Reply With Quote
Old 09-13-2016, 02:51 PM   #23
Deetroyt
Senior Member
 
Join Date: Dec 2013
Posts: 355
Re: Parcel K | Northern Avenue | Seaport

The B&T article is behind paywall so I can't read it but BLDUP is reporting that Lincoln Property Company will take over the project and hopes to break ground in early 2017.

http://www.bldup.com/projects/parcel-k

http://www.bankerandtradesman.com/20...arcel-seaport/
Deetroyt is online now   Reply With Quote
Old 10-03-2016, 11:15 AM   #24
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,488
Re: Parcel K | Northern Avenue | Seaport

NPC: http://www.bostonredevelopmentauthor...9-cd6950700ca6

Quote:
Summary of Project Changes
As presented in the 2013 EPNF, the Project was a mixed-use development with a
304-unit residential apartment building, a hotel building with 247 guest rooms, a
three-level underground parking garage with 640 striped spaces, public open spaces
connecting the two buildings at the ground and terrace levels, and a mix of
restaurant, retail and office spaces.
As described further below, changes to the Project are limited to: (1) an increase in
the number of hotel rooms (from 247 to 293); (2) a decrease in the number of
underground parking levels (from three to one) and parking spaces as described
herein; (3) certain design changes within the previously approved building
envelopes as described herein; and (4) possible revisions to the affordable housing
program for the Project to ensure the Projectís financial feasibility.

Hotel Room Change.

The number of hotel rooms will be increased by 46 within the
previously approved building envelope to a total of 293 guest rooms. The
Proponent, working with the proposed hotel operator, determined that a modest
increase in the room count is a desirable alteration to the Project. The increase in
room count has been accommodated within the previously approved building
envelope by using smaller guest room dimensions and through the repurposing of
interior spaces.

Parking Change.

The underground garage has been redesigned to reduce the
parking from 640 striped parking spaces on three levels, to a maximum of 420
parking spaces on one level. An initial 197 striped parking spaces will be provided
on the single parking level, with the Proponent having the ability, at its sole
election, to increase the capacity of the garage to a maximum of 420 parking spaces
through the installation of mechanical car-stacking machinery and/or through
managed valet operations upon the Proponentís determination that an increase is
necessary to accommodate the needs of the Project or the CFDA. The Projectís
Traffic Engineer has evaluated the current and proposed parking, and determined
that the reduced parking is sufficient for the Project.
Additional parking for the CFDA is being created through Massportís South Boston
Waterfront Transportation Center.

Design Change.

When the 2013 EPNF was submitted, both buildings were designed
with eleven occupiable floors, with the twelfth floor of each devoted primarily to a
mechanical penthouse, housing the cooling towers, mechanical and electrical
equipment, generators and energy recovery units. At the hotel, this twelfth floor
had a small amenity space for the hotel, labeled as a "Hotel Sky Bar", while the
twelfth floor of the residential was not counted as an occupiable floor. The office
component included approximately 14,400 square feet of office space located
between the hotel and residential uses on the ground level of the Project. Retail
spaces included approximately 17,900 square feet of retail and restaurant located at
the street and terrace levels.
As a result of the modifications to the Project, the interior layout of both buildings
has evolved to make the twelfth floor of both buildings occupiable. At the hotel, the
area devoted to amenity spaces has been increased to add a small fitness room and
pool, with the area devoted to mechanical equipment reduced. At the residential
building, the mechanical penthouse on the twelfth floor has been reduced and
shifted away from Northern Avenue, allowing an amenity space with a pool,
clubroom, and outdoor roof deck overlooking the corner of Congress Street and
Northern Avenue. These modifications do not alter the overall building massing as
previously approved.
Affordable Housing. The Proponent also seeks modifications to the on-site
affordable housing1 to be provided as required in order to insure the Projectís
financial feasibility while in compliance with the Mayorís Inclusionary
Development Policy.

Adjustments to the Project Schedule

The schedule for the Project as presented in the 2013 EPNF was for the completion
of permitting in the third quarter of 2014, with construction following shortly
thereafter. Construction was anticipated to be completed within eighteen to twentyfour
months. However, due to complications in identifying an appropriate hotel
operator and the financial feasibility of the Project as described in the 2013 EPNF,
permitting and development has been delayed.
Given the above, the current schedule for the commencement of construction is
March of 2017, with an estimated completion date of July 2019.














__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL

Last edited by datadyne007; 10-03-2016 at 11:30 AM.
datadyne007 is online now   Reply With Quote
Old 10-03-2016, 11:49 AM   #25
palindrome
Senior Member
 
palindrome's Avatar
 
Join Date: Jun 2006
Location: Boston
Posts: 2,188
Re: Parcel K | Northern Avenue | Seaport

Nice--another rooftop bar.
palindrome is offline   Reply With Quote
Old 10-03-2016, 12:30 PM   #26
stick n move
Senior Member
 
Join Date: Oct 2009
Location: Dorchester
Posts: 4,448
Re: Parcel K | Northern Avenue | Seaport

^ Roof top bars add so much to the night life of a city, theres going to be one down next to the cruise ship terminal also. That means envoy, watermark, yotel, parcel K, the building by the terminal, and possibly more. This along with the extensive bar selection going in on the harborwalk is going to make this an incredible are for night life. Its only going to improve over time as well as fort point fills in along with the rest of the seaport.
stick n move is offline   Reply With Quote
Old 10-03-2016, 03:42 PM   #27
sm89
Senior Member
 
Join Date: Apr 2014
Location: Somerville
Posts: 736
Re: Parcel K | Northern Avenue | Seaport

Anyone else blown away by the change in parking? That's incredible. Never thought I'd see the day.
sm89 is offline   Reply With Quote
Old 10-03-2016, 04:19 PM   #28
fattony
Senior Member
 
Join Date: Jan 2013
Location: Davis/Ball Sq.
Posts: 1,619
Re: Parcel K | Northern Avenue | Seaport

Quote:
Originally Posted by sm89 View Post
Anyone else blown away by the change in parking? That's incredible. Never thought I'd see the day.
No kidding. I'd love to see an analysis of how that change affects the price of homes in this building.
fattony is offline   Reply With Quote
Old 10-04-2016, 12:55 AM   #29
whighlander
Senior Member
 
Join Date: Aug 2006
Location: Lexington
Posts: 6,519
Re: Parcel K | Northern Avenue | Seaport

Quote:
Originally Posted by datadyne007 View Post
Datadyne -- I think that the last few of your images [5 counting up] were from the old plan [in particular the Northern Ave. view no longer has the Baseball Cap Brim and the 11th floor is now essentially like the 10th -- the 12th is partially mechanical and partially residences
whighlander is offline   Reply With Quote
Old 10-04-2016, 01:10 AM   #30
whighlander
Senior Member
 
Join Date: Aug 2006
Location: Lexington
Posts: 6,519
Re: Parcel K | Northern Avenue | Seaport

Quote:
Originally Posted by Equilibria View Post
No, this is Massport Parcel K, down by the end of Seaport Blvd. Intersection with Haul Rd. Can we get a name change, please?
Equilibria -- it is a confusing - typical Boston matter as there is Boston and Massport with their own systems of numbering or lettering

Here's the map courtesy of the NPC document quoted by Data



Follow the arrow across the project site and you come to the Silver Line Way T stop where the buses get or un-get electrified

That arrow is pointing to the next big developmen opportunity -- air rights over an underground Silver Line Way T Station after or during the crossing under of D street

That future change in the Silver Line is the key to the T in the seaport / Innovation / GE District. It enables complete electrified service with close headway shuttling to/fro South Station [since there is no surface traffic involved]. Ultimately Silver Line Way could become a major underground bus terminal [combining all electric -- south station shuttle, transforming to the airport, and all diesel-- to serve the rest of the district] -- a la Harvard Sq. T bus station
whighlander is offline   Reply With Quote
Old 10-04-2016, 06:07 AM   #31
inglec62
Junior Member
 
Join Date: Dec 2015
Posts: 26
Re: Parcel K | Northern Avenue | Seaport

First render is accurate to the current design..

inglec62 is offline   Reply With Quote
Old 10-04-2016, 06:18 AM   #32
JeffDowntown
Senior Member
 
Join Date: May 2007
Location: South Cove
Posts: 2,574
Re: Parcel K | Northern Avenue | Seaport

Quote:
Originally Posted by whighlander View Post
Datadyne -- I think that the last few of your images [5 counting up] were from the old plan [in particular the Northern Ave. view no longer has the Baseball Cap Brim and the 11th floor is now essentially like the 10th -- the 12th is partially mechanical and partially residences
And you can tell they are the old version because of the parking -- changed from three levels to one deep level that will be single layer at first, but could accommodate stackers if needed in the future. (That is the big parking hedge, although even with stacker still only 2/3 the original count.)
__________________
Jeff H.
Downtown, South Cove
JeffDowntown is offline   Reply With Quote
Old 12-08-2016, 07:12 PM   #33
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,206
Re: Parcel K | Northern Avenue | Seaport

Busy soil drilling on the east side of the site today.

BeeLine is offline   Reply With Quote
Old 12-09-2016, 09:40 AM   #34
BKNA
Senior Member
 
Join Date: Jun 2016
Posts: 151
Re: Parcel K | Northern Avenue | Seaport

Quote:
Originally Posted by fattony View Post
No kidding. I'd love to see an analysis of how that change affects the price of homes in this building.
and they will never need more than 350 spaces (unless the hotel has a large event space).

The City has been asking for full depth vertical clearance on the 1st level of parking garages so that the space can be converted into a different use when/if parking numbers continue to go down or the space needed to park a vehicle is reduced (doors are not opening/closing).
BKNA is offline   Reply With Quote
Old 12-15-2016, 10:38 PM   #35
tysmith95
Senior Member
 
Join Date: Feb 2016
Location: North Shore
Posts: 2,119
Re: Parcel K | Northern Avenue | Seaport

APPROVED
tysmith95 is offline   Reply With Quote
Old 11-17-2017, 06:54 PM   #36
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,206
Re: Parcel K | Northern Avenue | Seaport

Massport has approved the ground lease for this project. According to bldup.com and the Boston Globe the project will go forward and costruction should start next month.

http://www.bldup.com/projects/parcel-k
BeeLine is offline   Reply With Quote
Old 11-17-2017, 11:22 PM   #37
Smartiro
Senior Member
 
Join Date: Apr 2012
Location: Winchester
Posts: 371
Re: Parcel K | Northern Avenue | Seaport

Same story in the Globe:
http://www.bostonglobe.com/business/...yXN/story.html
Smartiro is offline   Reply With Quote
Old 11-19-2017, 10:01 PM   #38
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,206
Re: Parcel K | Northern Avenue | Seaport

Site yesterday.



BeeLine is offline   Reply With Quote
Old 11-20-2017, 10:00 AM   #39
BostonDrew
Senior Member
 
Join Date: Mar 2014
Posts: 478
Re: Parcel K | Northern Avenue | Seaport

Highlights from the Globe Story:
  • Hotel: Hyatt-Place Hotel (dropped plans for an extended-stay version)
  • Construction to start by end of year (2017)
  • Construction expected to take about 2 years
  • Project has been in the works for 7+ years

Latest Rendering with Hyatt signage and a couple minor modifications:




http://www.bostonglobe.com/business/...yXN/story.html
BostonDrew is offline   Reply With Quote
Old 12-01-2017, 08:41 PM   #40
stick n move
Senior Member
 
Join Date: Oct 2009
Location: Dorchester
Posts: 4,448
Re: Parcel K | Northern Avenue | Seaport

Some new renders:













-Arrowstreet
stick n move is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Seaport Memorial Park | Parcel F@Seaport Sq. | Seaport xec Development Projects 167 08-21-2018 06:55 AM
Goodwin Procter HQ @ Fan Pier | 90 - 110 Northern Ave - Parcel I | Seaport Batterymarch Development Projects 302 04-30-2018 10:20 PM
88 Seaport Blvd | Seaport Square Parcel D | Seaport FitchburgLine Development Projects 64 03-30-2018 06:35 PM
Our Lady of Good Voyage | Seaport Sq Parcel H | 55 - 57 Seaport Blvd | Seaport brucepf Development Projects 367 11-30-2017 10:56 AM
100 Pier 4 | 136-146 Northern Avenue | Seaport stellarfun Development Projects 718 11-22-2017 09:55 PM


All times are GMT -5. The time now is 04:04 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.