Old 05-14-2014, 06:43 AM   #1
stellarfun
Senior Member
 
Join Date: Dec 2006
Location: salem ma and washington dc
Posts: 4,038
Dredging Boston Harbor to Increase Shipping

Two stories, one from today's Globe on Federal monies.

http://www.bostonglobe.com/business/...B5H/story.html

And one from last year, on the need for deeper channels.

http://www.bostonglobe.com/opinion/e...mbK/story.html

A question I have is whether there are ways to readily offload these containers in Boston so that they can be shipped by rail?
__________________
A man gazing on the stars is at the mercy of the puddles in the road
stellarfun is offline   Reply With Quote
Old 05-14-2014, 08:35 AM   #2
BostonUrbEx
Senior Member
 
BostonUrbEx's Avatar
 
Join Date: Mar 2010
Location: North Shore
Posts: 4,237
Re: Dredging Boston Harbor to Increase Shipping

Quote:
Originally Posted by stellarfun View Post
A question I have is whether there are ways to readily offload these containers in Boston so that they can be shipped by rail?

There are three ports within Boston which could do this, but none of which are immediately ready. Also, there is no rail line out of Boston capable of handling double-stacks of containers due to bridge clearance issues.

1) Moran Terminal, Charlestown: the line still exists, for the most part, but the area where it crosses under I-93 would have to be worked out. The diamond crossing over the commuter rail tracks was cut out (simple fix) and clearance under the offramp to Sullivan Sq may be too low (not so simple fix). The track bed is likely in no condition and needs upgrading. But the right-of-way is preexisting and waiting for reactivation. The terminal currently receives cars only, and road salt in the Fall/Winter.

2) Fid Kennedy Terminal, Seaport: this former Naval/Army annex area isn't quite a terminal right now, but it would be relatively simple, and the BRA and MassPORT are both ready for the possibility. There are plans to extend Track 61 from Drydock Ave and up Tide St to the Fid Kennedy area in order to enable a terminal or entice industries shipping by rail.

3) Conley Terminal, South Boston: this terminal is already receiving containers and shipping by truck. MassPORT had plans to extend Track 61 from Drydock Ave over a bridge paralleling the Summer St Bridge and then entering an expanded Conley Terminal, which would expand as far west as M St. This would be a bit costly, I'd imagine, but there were preliminary planning documents recently.
__________________
Quote:
Originally Posted by choo View Post
forget it ever happening, its too great an idea.
BostonUrbEx is offline   Reply With Quote
Old 05-14-2014, 01:04 PM   #3
stellarfun
Senior Member
 
Join Date: Dec 2006
Location: salem ma and washington dc
Posts: 4,038
Re: Dredging Boston Harbor to Increase Shipping

Thanks BostonUrbEx. I'm glad that its with the realm of possibilities.
__________________
A man gazing on the stars is at the mercy of the puddles in the road
stellarfun is offline   Reply With Quote
Old 05-14-2014, 01:19 PM   #4
davem
Senior Member
 
Join Date: Sep 2011
Location: Assembly Square
Posts: 2,262
Re: Dredging Boston Harbor to Increase Shipping

It looks like the line to Moran had some ballast dumped on it when I rode by the other day. However there are jersey barriers blocking where it crosses 99, so it may have just been "landscaping" to keep down weeds.

The old rail line to Conley used to street-run down 1st, correct?
__________________
FP10 on railroad.net
Flickr Photostream
Designs
davem is offline   Reply With Quote
Old 05-14-2014, 02:59 PM   #5
BostonUrbEx
Senior Member
 
BostonUrbEx's Avatar
 
Join Date: Mar 2010
Location: North Shore
Posts: 4,237
Re: Dredging Boston Harbor to Increase Shipping

Quote:
Originally Posted by davem View Post
The old rail line to Conley used to street-run down 1st, correct?
Yes. MassPORT would rather build a new bridge than lay down street-running on E 1st again. If they eliminated parking, they could run it in a traffic-separated median, but apparently that is not [politically?] feasible.
__________________
Quote:
Originally Posted by choo View Post
forget it ever happening, its too great an idea.
BostonUrbEx is offline   Reply With Quote
Old 05-14-2014, 03:50 PM   #6
vanshnookenraggen
Moderator
 
vanshnookenraggen's Avatar
 
Join Date: May 2006
Location: New York City
Posts: 5,867
Re: Dredging Boston Harbor to Increase Shipping

Is MassPort planning on expanding Conley into those abandoned lots next door? And if they do go about expanding rail to Conley wouldn't that just be a great thing to have along side a growing community at Seaport Sq!
__________________
http://www.vanshnookenraggen.com | http://futurembta.com | http://hyperrealcartography.tumblr.com
brivx: well, my philosophy is: as designers, we make a good theater, we dont direct the play
vanshnookenraggen is offline   Reply With Quote
Old 05-14-2014, 09:16 PM   #7
BostonUrbEx
Senior Member
 
BostonUrbEx's Avatar
 
Join Date: Mar 2010
Location: North Shore
Posts: 4,237
Re: Dredging Boston Harbor to Increase Shipping

Quote:
Originally Posted by vanshnookenraggen View Post
Is MassPort planning on expanding Conley into those abandoned lots next door?
Planning, yes. Actually doing it? Not so sure.
__________________
Quote:
Originally Posted by choo View Post
forget it ever happening, its too great an idea.
BostonUrbEx is offline   Reply With Quote
Old 05-15-2014, 03:39 PM   #8
AmericanFolkLegend
Senior Member
 
Join Date: Jun 2009
Location: Boston
Posts: 2,097
Re: Dredging Boston Harbor to Increase Shipping

Massport is in the process of expanding Conley. When the legislature set aside funding for purchasing the old Coastal Oil parcels Jack Hart put a provision in the funding that said Massport couldn't expand Conley until they removed container traffic off East First Street. So they designed a new haul road that comes off the Summer St bridge, cuts across the Excelon parcel (power plant), cuts across some MBTA land and goes runs into the terminal. It will be set back a minimum of 100LF from East First St and separated from East First by a new ribbon park with vegetative screens and a soundwall.
They're phasing the new haul road project because they're still negotiating with Excelon on where (and how much $) the easement will run. The first phase (soundwall, utilities, eastern half of the road) went out to bid a couple months ago but I don't think it's been awarded yet.
More info here.
AmericanFolkLegend is offline   Reply With Quote
Old 05-16-2014, 10:14 AM   #9
Deetroyt
Senior Member
 
Join Date: Dec 2013
Posts: 353
Re: Dredging Boston Harbor to Increase Shipping

^ yeah I remember F line mentioning in one of his posts a while back about the T potentially using this new road to send Silverline vehicles to city point from Silver Line Way.

I wonder if we'll ever hear from F line again...
Deetroyt is offline   Reply With Quote
Old 05-16-2014, 02:19 PM   #10
BussesAin'tTrains
Senior Member
 
Join Date: Jan 2012
Location: Union Sq, Somerville
Posts: 3,386
Re: Dredging Boston Harbor to Increase Shipping

Quote:
Originally Posted by Deetroyt View Post
^ yeah I remember F line mentioning in one of his posts a while back about the T potentially using this new road to send Silverline vehicles to city point from Silver Line Way.

I wonder if we'll ever hear from F line again...
Yeah, he went dark back in January.
BussesAin'tTrains is offline   Reply With Quote
Old 05-16-2014, 04:12 PM   #11
Java King
Member
 
Join Date: Apr 2007
Location: Scituate, MA
Posts: 76
Re: Dredging Boston Harbor to Increase Shipping

Wasn't there some talk awhile back about the Ted Williams tunnel being so close to the Harbor Floor? If I remember, they didn't go deeper because of cost factors. How can they dredge without potentially harming the structure?
Java King is offline   Reply With Quote
Old 05-16-2014, 11:06 PM   #12
Scalziand
Senior Member
 
Join Date: Sep 2012
Location: Worcester, MA
Posts: 432
Re: Dredging Boston Harbor to Increase Shipping

^Conley is outside the tunnel, so it's not an issue for the terminal.
__________________
Shadows no longer exist. They will henceforth be known as shade.
Scalziand is offline   Reply With Quote
Old 05-24-2014, 01:42 AM   #13
GP40MC
Junior Member
 
Join Date: May 2014
Posts: 26
Re: Dredging Boston Harbor to Increase Shipping

I think Moran Terminal is a non-starter for rail since the Green Line Extension
Project will forever limit and hinder any future freight rail service.

-the MBTA doesn't really want that diamond crossing at FX restored.

-GLX is killing any long stretches of freight track in Somerville. The
remaining through track from Mystic Jct to 3rd Ave will be abandoned due
to GLX. Apparently PAR is resigned to the fact they will lose this connection,
settling for a rather untenable new track from Mystic along New Washington
Street to Innerbelt Road. However, where to you go from there without great
difficulty to even get to Salem? (Due to the Orange Line flyover, numerous
I-93 infrastructure, height restrictions)

Dave
GP40MC is offline   Reply With Quote
Old 05-24-2014, 10:19 AM   #14
BostonUrbEx
Senior Member
 
BostonUrbEx's Avatar
 
Join Date: Mar 2010
Location: North Shore
Posts: 4,237
Re: Dredging Boston Harbor to Increase Shipping

Quote:
Originally Posted by GP40MC View Post
I think Moran Terminal is a non-starter for rail since the Green Line Extension
Project will forever limit and hinder any future freight rail service.

-the MBTA doesn't really want that diamond crossing at FX restored.

-GLX is killing any long stretches of freight track in Somerville. The
remaining through track from Mystic Jct to 3rd Ave will be abandoned due
to GLX. Apparently PAR is resigned to the fact they will lose this connection,
settling for a rather untenable new track from Mystic along New Washington
Street to Innerbelt Road. However, where to you go from there without great
difficulty to even get to Salem? (Due to the Orange Line flyover, numerous
I-93 infrastructure, height restrictions)

Dave
IIRC, CSX still has rights to the Moran Terminal line, so freight would still be going out via the Grand Junction, which is entirely doable, even if the MBTA goes with the most freight-crushing alternative for the GLX facility. Likewise, it is just as easy for PanAm to go via the Fitchburgh Line, although Lowell would be preferable for height clearance. I'm not sure if the Cobble Hill Track can make a straight shot across FX to the Moran Terminal line or not (as you said, the flyover, I-93, etc).
__________________
Quote:
Originally Posted by choo View Post
forget it ever happening, its too great an idea.
BostonUrbEx is offline   Reply With Quote
Old 05-24-2014, 11:53 AM   #15
GP40MC
Junior Member
 
Join Date: May 2014
Posts: 26
Re: Dredging Boston Harbor to Increase Shipping

Since when does CSX have rights to Moran Terminal?
That was solely a B&M line. Conrail never went down
there. The only trackage rights CR ever had on the
B&M in the Boston Metro area was over the Eastern
Route to Revere to access Global on the B&M East
Boston Branch. Whether those rights passed to CSX
is unknown or simply given up when the branch went
out of service. I know CSX never went to Revere.

There plenty of height restrictions at Swift(McGrath
Highway) and elsewhere on the Grand Jct, so no racks
and you'd have to fillet any stack cars. Operationally,
you'd be severely limited time slot wise - like 1AM to
4AM. One could only imagine the hackles those folks
in the People's Republic of Cambridge would raise to
overnight freight traffic beyond what they put up with
now!

Dave
GP40MC is offline   Reply With Quote
Old 05-24-2014, 12:42 PM   #16
GP40MC
Junior Member
 
Join Date: May 2014
Posts: 26
Re: Dredging Boston Harbor to Increase Shipping

I also forgot to note that PAR & NS/PAS would
never let CSX on there, since its remains PAR
(via B&M) trackage.

Dave
GP40MC is offline   Reply With Quote
Old 11-12-2017, 10:34 PM   #17
JohnAKeith
Senior Member
 
Join Date: Dec 2008
Location: Boston, MA
Posts: 4,123
Re: Dredging Boston Harbor to Increase Shipping

Just wanted to post an update on this, three years after the most-recent.

Dredging under way in Boston Harbor
NorthEndWaterfront.com

Quote:
Dredging is underway in Boston Harbor, day and night, as part of a federally and state-funded $350 million, 3 1/2 year project aimed to bring bigger container and industrial ships through the harbor shipping channels.

The first phase is to make space for new sediment near Charlestown (shown above) and then deepen the Main and Outer Harbor shipping channels in the harbor to depths of 47-51 feet. Barges are being used to transport excavated material in and out of the harbor.

After the dredging, Conley Container Terminal will be able to handle 12,000 TEU-vessels up from 8,500 today. MassPort is working with the U.S. Army Corps of Engineers and contracted with Great Lakes Dredge and Dock.
__________________
"You must really like hearing yourself talk, because you do an awful lot of it whether or not you know anything at all about the topic at hand ..."
JohnAKeith is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Waterfront: Shipping Infrastructure rinserepeat Transit and Infrastructure 9 04-27-2012 12:07 AM
Shipping Infrastructure BostonUrbEx Design a Better Boston 2 06-23-2010 05:59 AM
BOSTON HARBOR SHIPYARD GALLERY LAUNCH - Harborarts.net GMACK24 General 5 06-16-2010 06:49 PM
Another Mass Transit Fee Increase commuter guy Transit and Infrastructure 3 10-11-2008 01:31 AM
BRA Meeting: E. Boston Municipal Harbor Plan briv Boston Architecture/Urbanism Related Events 0 06-23-2008 04:35 PM


All times are GMT -5. The time now is 10:32 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.