archBOSTON.org

Go Back   archBOSTON.org > Boston's Built Environment > Transit and Infrastructure

Transit and Infrastructure All things T or civilly engineered within Boston Metro.

Reply
 
Thread Tools Search this Thread
Old 04-03-2019, 09:36 AM   #241
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 9,360
Re: North Washington St Bridge







BeeLine is offline   Reply With Quote
Old 04-03-2019, 10:06 AM   #242
stevebikes
Senior Member
 
Join Date: May 2013
Posts: 235
Re: North Washington St Bridge

Quote:
Originally Posted by sm89 View Post
I guess that's for the construction team to brainstorm. They're building a temporary bridge; they can and should also consider how to accommodate peds and bikes.

Right. "Is the design of the CHB between the skating rink and the Garden terrible?" is a separate discussion from "has the contractor/city/state done any temporary mitigation for CHB users?" The answers are very much yes and no. There's no warning that the underpass is gone until you get to it. There should, at the very least, be signs here and here warning people not to bother trying to go around Lovejoy.
stevebikes is offline   Reply With Quote
Old 06-08-2019, 09:27 PM   #243
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 9,360
Re: North Washington St Bridge









BeeLine is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
North Bank Bridge Pedestrian Walkway EdMc Transit and Infrastructure 277 12-30-2015 11:21 AM
Barletta Builds The North Bank Bridge **video** EarthRockHill Transit and Infrastructure 3 10-08-2011 09:28 PM
Washington DC jass General 70 02-19-2010 04:39 PM
The day I took a tour of the George Washington Bridge vanshnookenraggen General 12 08-25-2008 11:17 AM
30 North Margin Street - North End caravaggiste Development Projects 86 07-28-2008 07:56 PM


All times are GMT -5. The time now is 10:04 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.