Old 04-29-2019, 09:58 AM   #1021
Harry Mattison
Senior Member
 
Join Date: Dec 2007
Posts: 109
Re: I-90 Interchange Improvement Project & West Station | Allston

>> Connecting most if not all cross streets is a no brainer.

MassDOT's current plan has one connection - a footbridge at Malvern St that maybe someday could be widened to allow vehicular traffic

For those of you thinking that MassDOT is sandbagging their estimates for how long this will take, they are proposing to relocate some big utility pipes before the highway & rail work even starts. More info at
https://drive.google.com/open?id=1zh...jhz-woExd3RlQt
Harry Mattison is offline   Reply With Quote
Old 04-29-2019, 01:11 PM   #1022
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,700
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by Harry Mattison View Post
>> Connecting most if not all cross streets is a no brainer.

MassDOT's current plan has one connection - a footbridge at Malvern St that maybe someday could be widened to allow vehicular traffic

For those of you thinking that MassDOT is sandbagging their estimates for how long this will take, they are proposing to relocate some big utility pipes before the highway & rail work even starts. More info at
https://drive.google.com/open?id=1zh...jhz-woExd3RlQt
This has been discussed in some geometric detail here before, grading all of the streets on the BU side to clear the Turnpike would be difficult and expensive.
Equilibria is offline   Reply With Quote
Old 05-20-2019, 02:44 PM   #1023
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,700
Re: I-90 Interchange Improvement Project & West Station | Allston

Very big update for the FMCB and MassDOT Board on this today. MassDOT, Harvard, the City, and other folks have been working on Harvard's "flip" proposal for West Station. MassDOT has modified Harvard's initial concept but is still working on it - one major potentially-related change is the addition of a Malvern St. transitway bridge to link West Station to the south.

The core of the "flip" is to move the straightaway Worcester Main Line to curve to the north and hug the new highway alignment, allowing the platforms to be closer to Harvard's land. MassDOT essentially rejected the idea of moving all WML service north, but accepted the idea of moving the platforms, with a track maintained on the current straightaway (presumably for express trains and Amtrak) to keep that track at 79mph. The "flip" also presupposes Grand Junction service.

Will post slides when they're up.
Equilibria is offline   Reply With Quote
Old 05-24-2019, 08:40 AM   #1024
Semass
Senior Member
 
Join Date: Feb 2012
Posts: 671
Re: I-90 Interchange Improvement Project & West Station | Allston

So the slides are up and it appears that the Harvard "Flip" puts more emphasis on the Grand Junction than previous iterations.
What would this do to prospects for the Urban Ring?
https://www.mass.gov/files/documents...MCB_052019.pdf
Semass is offline   Reply With Quote
Old 05-24-2019, 09:32 AM   #1025
mass88
Senior Member
 
Join Date: Jan 2008
Posts: 1,962
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by Semass View Post
So the slides are up and it appears that the Harvard "Flip" puts more emphasis on the Grand Junction than previous iterations.
What would this do to prospects for the Urban Ring?
https://www.mass.gov/files/documents...MCB_052019.pdf
Some nice visualizations of how things might look.

It's still insane that from concept to completion may very well take 13 plus years.
mass88 is offline   Reply With Quote
Old 05-24-2019, 01:04 PM   #1026
Tallguy
Member
 
Join Date: May 2018
Posts: 45
Re: I-90 Interchange Improvement Project & West Station | Allston

Unclear how GL to Harvard Sq gets over/under?
Tallguy is offline   Reply With Quote
Old 05-24-2019, 01:20 PM   #1027
jklo
Senior Member
 
Join Date: Feb 2015
Posts: 341
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by Semass View Post
So the slides are up and it appears that the Harvard "Flip" puts more emphasis on the Grand Junction than previous iterations.
What would this do to prospects for the Urban Ring?
Ooh nice. If Harvard wants Grand Junction it might actually happen, but we're talking 10+ years from now. Probably doesn't mean much for Urban Ring other than GJ itself.
jklo is offline   Reply With Quote
Old 05-24-2019, 03:08 PM   #1028
whittle
Senior Member
 
Join Date: Feb 2017
Posts: 200
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by Tallguy View Post
Unclear how GL to Harvard Sq gets over/under?
F-Line has a post on this.
whittle is offline   Reply With Quote
Old 05-24-2019, 04:10 PM   #1029
Tallguy
Member
 
Join Date: May 2018
Posts: 45
Re: I-90 Interchange Improvement Project & West Station | Allston

Yes, but there isn't going to be a viaduct to go under any more.....Or the Harvard line WON'T go to West Station?!?!
His render puts West Station further east than the "modified flip"
Tallguy is offline   Reply With Quote
Old 05-24-2019, 04:18 PM   #1030
Tallguy
Member
 
Join Date: May 2018
Posts: 45
Re: I-90 Interchange Improvement Project & West Station | Allston

I'm just very surprised that there are no apparent plans for future -proofing.
Tallguy is offline   Reply With Quote
Old 05-24-2019, 05:12 PM   #1031
whittle
Senior Member
 
Join Date: Feb 2017
Posts: 200
Re: I-90 Interchange Improvement Project & West Station | Allston

Eh, you could still turn north from this location, it just won't as direct a route. And at the moment GJR being used for Commuter Rail looks much more likely than LRV, so that's what MassDOT should have as their first consideration.
whittle is offline   Reply With Quote
Old 05-24-2019, 06:38 PM   #1032
jklo
Senior Member
 
Join Date: Feb 2015
Posts: 341
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by whittle View Post
And at the moment GJR being used for Commuter Rail looks much more likely than LRV, so that's what MassDOT should have as their first consideration.
Commuter Rail would be easier for sure... but I'm starting to think that the Worcester Line doesn't have any schedule room to really increase CR service beyond what's there now without something like electrification. Especially given how delay filled it is.
jklo is offline   Reply With Quote
Old 05-25-2019, 04:20 AM   #1033
Tallguy
Member
 
Join Date: May 2018
Posts: 45
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by whittle View Post
Eh, you could still turn north from this location, it just won't as direct a route. And at the moment GJR being used for Commuter Rail looks much more likely than LRV, so that's what MassDOT should have as their first consideration.
There is no way GJ will ever see anything other than LRT. No how. No way. There are insurmountable technical issues with anything besides LRT or BRT, as discussed here at length by F Line and others. The western end of West Station in the renders is nearly 1000ft west of Cattle Dr, which is still 300 ft west of the
easiest place to put the Harvard Line under Cambridge St., where the existing Pike ramps go under it. The easternmost possible track(assuming you dont want to destroy the existing neighborhood on Seattle and Windom Sts) is still 800+ft and would greatly increase expense and disruption. And you still need to go another 400ft west of the station to get either over or under the Pike to get to Harvard. Or every LRT that enters West goes back out the way it came.That would be a nightmare. The GJ provisions must be further east to make a Harvard Green Line extension fit, unless you go under everything from the south, as Van had posited, but that has a new set of cost and logistical issues of it's own.
Tallguy is offline   Reply With Quote
Old 05-25-2019, 07:38 AM   #1034
jklo
Senior Member
 
Join Date: Feb 2015
Posts: 341
Re: I-90 Interchange Improvement Project & West Station | Allston

Looking at the render again, it sure looks like the intention is for the platform to be used by Worcester Line trains that will stop there. Don't think that would work with Green at all... maybe Indigo.
jklo is offline   Reply With Quote
Old 05-25-2019, 07:58 AM   #1035
whittle
Senior Member
 
Join Date: Feb 2017
Posts: 200
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by Tallguy View Post
There is no way GJ will ever see anything other than LRT. No how. No way.
Someone should tell that to the MBTA and MassDOT.
whittle is offline   Reply With Quote
Old 05-25-2019, 08:02 AM   #1036
Tallguy
Member
 
Join Date: May 2018
Posts: 45
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by whittle View Post
Someone should tell that to the MBTA and MassDOT.
Cambridge has. Repeatedly.
Tallguy is offline   Reply With Quote
Old 05-25-2019, 08:17 AM   #1037
Tallguy
Member
 
Join Date: May 2018
Posts: 45
Re: I-90 Interchange Improvement Project & West Station | Allston

The station location MIGHT work for Harvard Line if the bus loop was flipped from west to east of Seattle St, the WML platform was moved east about 100ft, and the GJ platform was moved so that it stretched east of Cambridge St bypass, with the stairs+ elevator at the western end coming up just west of the bypass. If the platform was depressed 20 ft, you could immediately turn north under the highway and come out just east of Windom. The bypass will still be a viaduct at that point so it should be easy enough to get under (that curve under the Pike will be a speed killer though) then another underpass to get under Cattle Dr. Then a split off the GJ near the BU bridge and connect to the B Line. Straight through shot for Harvard LRT, but UR will have to do a turnaround each time.
Tallguy is offline   Reply With Quote
Old 05-25-2019, 11:00 AM   #1038
Charlie_mta
Senior Member
 
Charlie_mta's Avatar
 
Join Date: Jul 2006
Posts: 1,372
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by Tallguy View Post
he western end of West Station in the renders is nearly 1000ft west of Cattle Dr, which is still 300 ft west of the
easiest place to put the Harvard Line under Cambridge St., where the existing Pike ramps go under it.
.
The ramps under Cambridge Street and the bridge will disappear when the new street grid is built
Charlie_mta is offline   Reply With Quote
Old 05-25-2019, 02:38 PM   #1039
Tallguy
Member
 
Join Date: May 2018
Posts: 45
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by Charlie_mta View Post
.
The ramps under Cambridge Street and the bridge will disappear when the new street grid is built
Okay, that brings a potential path 300ft closer...just west of Cattle Dr....still quite a feat from the western end of the proposed GJ platform
Tallguy is offline   Reply With Quote
Old 05-25-2019, 03:21 PM   #1040
George_Apley
Senior Member
 
George_Apley's Avatar
 
Join Date: Jan 2012
Location: Union Sq, Somerville
Posts: 3,523
Re: I-90 Interchange Improvement Project & West Station | Allston

If/When GLX-Harvard is ever designed and built, it probably won't have a cross-platform transfer with the Worcester Line. It will be a fare transfer with a stroll of 300'-600'. I don't think we can expect any better than that. It will be better than the Kendall transfer between GLX-UR and Red, which will also require a walk to transfer.
George_Apley is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Commonwealth Avenue Improvement Project statler Transit and Infrastructure 683 03-19-2019 07:22 AM
Avalon North Station | Nashua Street Residences | West End castevens Development Projects 1479 11-25-2018 03:58 PM
Fitchburg Line Improvement Project matredsoxfan Transit and Infrastructure 79 07-14-2016 10:58 AM
North Station Expansion Project Ron Newman Transit and Infrastructure 40 08-25-2008 08:01 PM
Nonantum Road Improvement Project - Public Meeting Ron Newman Boston Architecture/Urbanism Related Events 0 06-11-2008 09:53 PM