Old 06-06-2019, 01:30 PM   #721
HelloBostonHi
Senior Member
 
Join Date: Apr 2018
Posts: 246
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by FK4 View Post
Is there a ramp onto that bridge, tho? All I see on the Huntington side is a staircase.
There's a glass walled elevator just to the left in the photos. Less convenient than a ramp but understandably difficult to fit a ramp with ADA compliant grades in this limited space.
HelloBostonHi is offline   Reply With Quote
Old 06-06-2019, 01:31 PM   #722
reverend_paco
Senior Member
 
reverend_paco's Avatar
 
Join Date: Oct 2012
Posts: 331
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by FK4 View Post
Is there a ramp onto that bridge, tho? All I see on the Huntington side is a staircase.
No. No ramp. They didn't want me biking through.
reverend_paco is offline   Reply With Quote
Old 06-06-2019, 01:38 PM   #723
FK4
Senior Member
 
Join Date: Nov 2012
Posts: 2,270
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by reverend_paco View Post
No. No ramp. They didn't want me biking through.
1. That’s incredibly shitty and I don’t understand why they would leave that out and

2. How is this possibly ADA compliant? It looks like there may be a way into the adjacent building from above, but that still seems noncompliant to me.
FK4 is offline   Reply With Quote
Old 06-06-2019, 01:52 PM   #724
HenryAlan
Senior Member
 
Join Date: Dec 2009
Location: Rozzie Square
Posts: 1,969
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by FK4 View Post
1. That’s incredibly shitty and I don’t understand why they would leave that out and
Agreed, that would have been a good spot to cut from Columbus/Tremont corridor over to Huntington. However, Northeastern might legitimately have an interest in preventing a bike highway through campus. I certainly would have used it, though Ruggles St. is going to get a bike route in the near future.
Quote:
2. How is this possibly ADA compliant? It looks like there may be a way into the adjacent building from above, but that still seems noncompliant to me.
There is an elevator for ADA compliance purposes. This makes me think that space limitations were an issue with ramping at the correct grade, as an elevator would certainly be far more expensive.
HenryAlan is offline   Reply With Quote
Old 06-06-2019, 02:18 PM   #725
reverend_paco
Senior Member
 
reverend_paco's Avatar
 
Join Date: Oct 2012
Posts: 331
Re: Northeastern University - Institutional Master Plan

I honestly don't think they had the room to bring it down.

I have not done the trigonometry nor am I an engineer, but considering its width and the height it needed to clear the service road, it would have had to stretch another 30 feet (at least) to make it to ground level. The paths there by the Snell library are not that wide to have made it feasible (in my opinion).
reverend_paco is offline   Reply With Quote
Old 06-06-2019, 02:45 PM   #726
TomOfBoston
Senior Member
 
Join Date: Mar 2007
Location: Harrisburg, PA
Posts: 775
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by FK4 View Post
1. That’s incredibly shitty and I don’t understand why they would leave that out and

2. How is this possibly ADA compliant? It looks like there may be a way into the adjacent building from above, but that still seems noncompliant to me.
It seems that you have never been at this part of the Northeastern campus. The elevator structure is separate from but adjacent to the library. People using the elevator do not enter the library.
TomOfBoston is offline   Reply With Quote
Old 06-06-2019, 03:35 PM   #727
found5dollar
Senior Member
 
Join Date: Aug 2007
Location: Brooklyn, NY
Posts: 964
Re: Northeastern University - Institutional Master Plan

While ADA is an amazing thing, it can be incredibly hard to fit ramps in sometimes. I am designing a site specific play in NYC right now and the room has a lading with 4 steps down to the main area of the space. To comply with ADA to get handicapped people to the lower portion of the room the ramp has to be 40' long at minimum. We then need to add a 5' landing since the ramp is over 30' long, and the room isn't 40' long so we also would need to add platforms to turn the ramp which must be a minimum of 5'x5'. In total we were going to have to use over half of the room for ramps. Instead we are just having the ADA seating on the top landing.
found5dollar is offline   Reply With Quote
Old 06-06-2019, 03:42 PM   #728
HelloBostonHi
Senior Member
 
Join Date: Apr 2018
Posts: 246
Re: Northeastern University - Institutional Master Plan

There is an elevator exclusively for serving this bridge on this end. It was designed this way because there was not space to fit the length of an ADA ramp in this area.





HelloBostonHi is offline   Reply With Quote
Old 06-06-2019, 04:15 PM   #729
dshoost88
Senior Member
 
Join Date: Apr 2008
Location: Boston, MA
Posts: 1,538
Re: Northeastern University - Institutional Master Plan

No different than at Ruggles. Debatably easier actually.

If the permitting hadn’t become the hassle that it was (City, MBTA, Amtrak, etc.), Northeastern’s original/preferred concept for the full arc bridge would’ve included a ‘second’ bridge crossing over to the Science quad. There would have been sufficient clearance at that site to fit an ADA compliant ramp from the main campus over to ISEC.
dshoost88 is online now   Reply With Quote
Old 06-06-2019, 05:30 PM   #730
TomOfBoston
Senior Member
 
Join Date: Mar 2007
Location: Harrisburg, PA
Posts: 775
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by dshoost88 View Post
No different than at Ruggles. Debatably easier actually.

If the permitting hadn’t become the hassle that it was (City, MBTA, Amtrak, etc.), Northeastern’s original/preferred concept for the full arc bridge would’ve included a ‘second’ bridge crossing over to the Science quad. There would have been sufficient clearance at that site to fit an ADA compliant ramp from the main campus over to ISEC.
Is it possible that the other half of the ARC may be built at a future date? I heard that the MBTA/Amtrak said never.
TomOfBoston is offline   Reply With Quote
Old 06-06-2019, 07:07 PM   #731
HelloBostonHi
Senior Member
 
Join Date: Apr 2018
Posts: 246
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by TomOfBoston View Post
Is it possible that the other half of the ARC may be built at a future date? I heard that the MBTA/Amtrak said never.
Unlikely, it provides minimal benefits at high cost to Northeastern and duplicates an existing bridge... Also no good construction staging area, this time they had a great square of land to fully pre-construct the bridge then lift it into place, without trashing the new carter playground they wouldn't have that next time. I think they've decided their time and money is better spent elsewhere, their last community meeting they identified ISEC2/EXP, Renaissance Parking Lot and Ryder Parking as their priority areas for new development, along with some minor renovations around punters pub area I believe.

As for the ramp conversation, it provides fully level access from the Columbus Ave side which is better than any existing bridge in the campus area.
HelloBostonHi is offline   Reply With Quote
Old 06-10-2019, 05:01 PM   #732
HelloBostonHi
Senior Member
 
Join Date: Apr 2018
Posts: 246
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by TomOfBoston View Post
This makes me wish that the MBTA had allowed Northeastern to build the other half of the ARC.

Seeing the wooden handrails in detail confirms for me that they are long term temporary barriers. They will likely stay in place until ISEC II/EXP is completed.
Looks like some of the wooden handrails are being replaced already with more permanent metal ones, must have been some pressure from the powers that be to get open for them to have bothered with the temp wooden ones...


HelloBostonHi is offline   Reply With Quote
Old 06-11-2019, 09:37 AM   #733
TomOfBoston
Senior Member
 
Join Date: Mar 2007
Location: Harrisburg, PA
Posts: 775
Re: Northeastern University - Institutional Master Plan

First posting of the EXP project on the Northeastern website:
https://news.northeastern.edu/2019/0...bots-and-more/
"High ceilings on the first story of EXP will accommodate the robotics program, said Kathy Spiegelman, vice president and chief of campus planning and development at Northeastern. The makerspace—where students can work on projects while sharing ideas, equipment, and knowledge—will be located on the second floor. The third, fourth, fifth, sixth, and seventh floors will be dedicated to research and teaching labs and classrooms while the eighth floor will hold executive offices, the faculty club, and a boardroom."
TomOfBoston is offline   Reply With Quote
Old 06-11-2019, 09:49 AM   #734
FK4
Senior Member
 
Join Date: Nov 2012
Posts: 2,270
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by HelloBostonHi View Post
There is an elevator exclusively for serving this bridge on this end. It was designed this way because there was not space to fit the length of an ADA ramp in this area.
I'd rather have seen them keep the elevator and just build a non-ADA (ie, steeper) ramp.
FK4 is offline   Reply With Quote
Old 06-11-2019, 10:58 AM   #735
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 9,360
Re: Northeastern University - Institutional Master Plan



BeeLine is offline   Reply With Quote
Old 06-11-2019, 12:08 PM   #736
JeffDowntown
Senior Member
 
Join Date: May 2007
Location: South Cove
Posts: 2,755
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by FK4 View Post
I'd rather have seen them keep the elevator and just build a non-ADA (ie, steeper) ramp.
I would assume that there is a liability issue if you provide an non-ADA compliant ramp, and someone gets hurt using it.
__________________
Jeff H.
Downtown, South Cove
JeffDowntown is offline   Reply With Quote
Old 06-11-2019, 12:36 PM   #737
atlantaden
Senior Member
 
Join Date: May 2006
Location: atlanta
Posts: 1,945
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by FK4 View Post
I'd rather have seen them keep the elevator and just build a non-ADA (ie, steeper) ramp.
I'm curious, what's your thinking behind this statement?
atlantaden is offline   Reply With Quote
Old 06-11-2019, 12:36 PM   #738
HelloBostonHi
Senior Member
 
Join Date: Apr 2018
Posts: 246
Re: Northeastern University - Institutional Master Plan

Quote:
Originally Posted by BeeLine View Post


I see Ruggles platform chugging along quietly... Does anyone know if they plan on returning the old columbus parking overpass pedestrian crossing to the bus ramp? Or does the new platform make that impossible...
HelloBostonHi is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Boston College Master Plan palindrome Development Projects 617 04-07-2019 07:19 PM
Suffolk University Master Plan BostonUrbEx Development Projects 3 12-03-2017 09:24 AM
New Master Plan for North Allston briv Development Projects 52 08-11-2010 04:56 PM
AMTRAK's INFRASTRUCTURE MASTER PLAN stellarfun Transit and Infrastructure 9 05-21-2010 03:35 PM
Final Draft of the Thoreau Path Master Plan briv Boston Architecture/Urbanism Related Events 0 01-26-2008 01:30 PM