Re: State Street HQ | One Congress | Bulfinch Crossing | West End









Entrance to the garage (above ) is still open and in use.
The entrance to the top two office floors (below) is closed, locked, and the reception desk is not staffed. Funny no CLOSED signage any where.

BeeLine is offline   Reply With Quote
Old 08-01-2019, 11:18 AM   #282
Semass
Senior Member
 
Join Date: Feb 2012
Posts: 679
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Brick elevator tower entrance is now closed off with fencing.
Semass is offline   Reply With Quote
Old 08-01-2019, 11:33 AM   #283
stick n move
Senior Member
 
Join Date: Oct 2009
Location: Dorchester
Posts: 6,002
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by tangent View Post
Once One Congress is up there will be a lot of economic and political pressure to redevelop that surface parking lot and bring more ground level activity and restaurants to the square.
Also that lot is in the exact spot needed to fill out the last gap in the skyline over here too. Nothing crazy needs to go in there, but something thats juust enough to fill in that last spot would be nice. Then the flow of the skyline will finally be uninterrupted as it rounds the corner and heads toward north station and the west end from downtown.
stick n move is offline   Reply With Quote
Old 08-01-2019, 11:37 AM   #284
tangent
Senior Member
 
Join Date: May 2012
Posts: 1,709
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

The phasing of this project has been very interesting to follow. Maximizing the income from parking and office space for as long as possible until you absolutely have to close the section of space to make way for the next phase.

Compared with other past projects that have taken a knock down and then figure out the finances later approach which can leave spaces empty and blighted for years and years.
tangent is offline   Reply With Quote
Old 08-01-2019, 01:51 PM   #285
Lrfox
Senior Member
 
Lrfox's Avatar
 
Join Date: Nov 2006
Posts: 2,486
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by BeeLine View Post
Entrance to the garage (above ) is still open and in use.
The entrance to the top two office floors (below) is closed, locked, and the reception desk is not staffed. Funny no CLOSED signage any where.
Quote:
Originally Posted by Semass View Post
Brick elevator tower entrance is now closed off with fencing.
Hopefully this means we'll see the section of the garage over the street start to come down in the coming months.
Lrfox is offline   Reply With Quote
Old 08-01-2019, 10:43 PM   #286
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 330
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by Lrfox View Post
Hopefully this means we'll see the section of the garage over the street start to come down in the coming months.
Can't wait ... but I thought that (over) Congress Street demolition wasn't anticipated until after the completion of 1 Congress.
ivyhedge is offline   Reply With Quote
Old 08-02-2019, 01:50 AM   #287
stick n move
Senior Member
 
Join Date: Oct 2009
Location: Dorchester
Posts: 6,002
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by ivyhedge View Post
Can't wait ... but I thought that (over) Congress Street demolition wasn't anticipated until after the completion of 1 Congress.
Na the garage is supposed to come down next, before 1 Congress goes up. It can always change I guess, but they have a phased plan that theyre following that is specific to different significant parts of the build out. Phase 1 of construction is getting close to wrapping up soon, then phase 2 is next with garage demo coming at 2A and the tower wrapping up to close out 2B. The phases obviously have some overlap, but the garage comes down before completion of the office tower with 2B.
Heres the approved phasing plan:
http://www.archboston.org/community/...&postcount=214

Also making up for some of what is being demolished, is 5 floors of parking within the office tower levels itself. I count 22 new spaces per floor, so that should be about 110 spaces coming back on line. Anyone know how many are being lost with demolition?
http://www.archboston.org/community/...&postcount=165

Last edited by stick n move; 08-02-2019 at 02:27 AM.
stick n move is offline   Reply With Quote
Old 08-02-2019, 01:06 PM   #288
Rhino
Junior Member
 
Join Date: May 2018
Posts: 17
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Original plans called for 1,100 spaces down from the existing 2,300 so a net loss of 1,200 spaces. A welcomed reduction (IMO) as we try to limit Boston's car dependency.

Quote:
Originally Posted by stick n move View Post
Also making up for some of what is being demolished, is 5 floors of parking within the office tower levels itself. I count 22 new spaces per floor, so that should be about 110 spaces coming back on line. Anyone know how many are being lost with demolition?
http://www.archboston.org/community/...&postcount=165
Rhino is offline   Reply With Quote
Old 08-02-2019, 01:19 PM   #289
DowntownDave
Senior Member
 
Join Date: May 2006
Posts: 302
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

From an 2015 Globe article:

Quote:
Downtown, the parking freeze dates to 1978, in response to the federal Clean Air Act. There are 35,556 public spaces allowed in commercial facilities downtown, although an exclusion allows builders to add private spots for tenants.

Without that exemption, Dimino said, “the whole system would have fallen apart.”

There are 1,260 unused spots remaining in the South Boston-Seaport area in a “parking bank,’’ spaces that can be created by developers who apply for them. Once those spots are taken, it would be difficult to add more. Downtown, there are no spots left in the bank.
Wouldn't reducing the spot count here just permit other commercial projects to add 1100 spaces?
DowntownDave is offline   Reply With Quote
Old 08-05-2019, 12:15 PM   #290
Semass
Senior Member
 
Join Date: Feb 2012
Posts: 679
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Falling debris protection now up above sidewalk around the brick elevator tower. I would expect demo here to begin fairly soon.
Semass is offline   Reply With Quote
Old 08-05-2019, 06:16 PM   #291
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 330
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by stick n move View Post
Na the garage is supposed to come down next, before 1 Congress goes up. It can always change I guess, but they have a phased plan that theyre following that is specific to different significant parts of the build out. Phase 1 of construction is getting close to wrapping up soon, then phase 2 is next with garage demo coming at 2A and the tower wrapping up to close out 2B. The phases obviously have some overlap, but the garage comes down before completion of the office tower with 2B.
Heres the approved phasing plan:
http://www.archboston.org/community/...&postcount=214

Also making up for some of what is being demolished, is 5 floors of parking within the office tower levels itself. I count 22 new spaces per floor, so that should be about 110 spaces coming back on line. Anyone know how many are being lost with demolition?
http://www.archboston.org/community/...&postcount=165
Fabulous! Thanks for the clarification, Stick!
ivyhedge is offline   Reply With Quote
Old 08-05-2019, 06:18 PM   #292
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 330
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by Semass View Post
Falling debris protection now up above sidewalk around the brick elevator tower. I would expect demo here to begin fairly soon.
There was actually some messiness (read: offal) in the intersection this morning (~0855) ... Hopefully they'll be more careful as demo progresses...
ivyhedge is offline   Reply With Quote
Old 08-05-2019, 06:51 PM   #293
stellarfun
Senior Member
 
Join Date: Dec 2006
Location: salem ma and washington dc
Posts: 4,688
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by DowntownDave View Post
From an 2015 Globe article:

Wouldn't reducing the spot count here just permit other commercial projects to add 1100 spaces?
Yes. I believe these spaces return to the pool, and developers of future projects can request them.

https://www.boston.gov/departments/e...parking-freeze
__________________
A man gazing on the stars is at the mercy of the puddles in the road
stellarfun is offline   Reply With Quote
Old 08-14-2019, 11:15 AM   #294
Semass
Senior Member
 
Join Date: Feb 2012
Posts: 679
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

A number of large, vertical tanks are now assembled on site. For concrete? Remediating contaminated groundwater?

Also scaffolding erected at brick elevator tower.
Semass is offline   Reply With Quote
Old 08-15-2019, 10:53 AM   #295
odurandina
Senior Member
 
odurandina's Avatar
 
Join Date: Dec 2015
Posts: 4,730
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by Lrfox View Post
Hopefully this means we'll see the section of the garage over the street start to come down in the coming months.
Well, HYM's move not to attempt to own everything outright was brilliant, imo.

Things should move faster and more smoothly to the latter phases!

Quote:
Originally Posted by BISNOW
Carr Properties is partnering with National Real Estate Advisors in acquiring One Congress, the planned 1M SF, 43-story office tower at HYM Investment Group’s Bulfinch Crossing mixed-use development in downtown Boston. HYM will develop the tower, and the Carr-NREA JV will own it, the Washington Business Journal reports.

One Congress will be the only property in Carr’s portfolio outside Greater Washington. The company has developed millions of square feet of trophy office properties in recent years in D.C., Maryland and Virginia.
Read more at: https://www.bisnow.com/boston/news/o...medium=Browser
odurandina is offline   Reply With Quote
Old 08-15-2019, 02:27 PM   #296
stoweker
Member
 
Join Date: Aug 2017
Posts: 34
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

Quote:
Originally Posted by odurandina View Post
Well, HYM's move not to attempt to own everything outright was brilliant, imo.

Things should move faster and more smoothly to the latter phases!

What are you talking about "brilliant", that's how financing works very very few funds own the entire equity capital stack, especially developers who are generally structured as GP in a GP/LP structure. That is how commercial real estate works, dawg, nothing "brilliant" about it.
stoweker is offline   Reply With Quote
Old 08-16-2019, 09:49 AM   #297
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 9,925
Re: State Street HQ | One Congress | Bulfinch Crossing | West End





BeeLine is offline   Reply With Quote
Old 08-16-2019, 03:25 PM   #298
DowntownDave
Senior Member
 
Join Date: May 2006
Posts: 302
Re: State Street HQ | One Congress | Bulfinch Crossing | West End

The dark colored stuff hanging on the corridor from the lifts to the old offices hangs way down to the street, which makes me wonder how they intend to demolish it:

DowntownDave is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Bulfinch Crossing Residential Tower (GCG Phase I) | 50 Sudbury St | Gov't Center BeeLine Development Projects 668 Today 09:12 AM
Bulfinch Crossing | Congress Street Garage | West End statler Development Projects 2448 03-10-2019 09:36 AM
The Beverly (née Merano) (Parcels 1B & 1C) | Bulfinch Triangle | West End kz1000ps Development Projects 578 09-02-2018 07:08 PM
Boutique Hotel at 88 North Washington St | Bulfinch Triangle | West End datadyne007 Development Projects 42 01-23-2018 10:38 AM
Charles Bulfinch and the West End joesly Boston Architecture & Urbanism 2 05-23-2013 01:31 PM


All times are GMT -5. The time now is 09:51 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.