Old 08-13-2019, 03:22 PM   #3041
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,487
Re: Green Line Extension to Medford & Union Sq

Nice pics of the construction progress!!
Jahvon09 is offline   Reply With Quote
Old 08-14-2019, 06:09 AM   #3042
F-Line to Dudley
Senior Member
 
Join Date: Nov 2010
Posts: 5,203
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by bigpicture7 View Post
Sorry if this is a stupid question or has already been recently addressed (it's just impossible to keep up with everything)...

Does anyone know if repair/restoration to the old parts of the Lechmere viaduct are part of this project, or entirely separate?
By design it's got to be semi-separate because half of it is concrete arch, half of it is a steel El...and half of the steel El is going to get lopped off for the new alignment. Conditions vary across the length of it. The concrete needs more intensive work. Even since '04 there's been little bits of flaking on it, including some exposed rebar by the Land Blvd. light. Auto emissions haven't been kind to it there, while the arches over the Charles are in much better shape. The steel portion is the most weight-restricted, so they'll be doing some GLT forward-compatible enhancements to the preserved segment of it. But it is in pretty good shape overall, not even flaking off all that much paint today (last paint job was definitely way before '04).
F-Line to Dudley is offline   Reply With Quote
Old 08-14-2019, 09:16 AM   #3043
Arlington
Senior Member
 
Join Date: Dec 2011
Location: West Medford, MA
Posts: 3,700
Re: Green Line Extension to Medford & Union Sq

I'm hoping that if they have to close the concrete viaduct for upgrades (and any steel bits they're keeping) that they'd do it at the same time that they're doing the demolition on today's connection to Current Lechmere.
__________________
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington is offline   Reply With Quote
Old 08-16-2019, 02:28 PM   #3044
guitarguynboston
Junior Member
 
guitarguynboston's Avatar
 
Join Date: Dec 2009
Location: Massachusetts
Posts: 26
Re: Green Line Extension to Medford & Union Sq

Random question. Has anyone seen what the new maps will look like with the 2 green line extensions? I'm wondering if they'll move the north red slightly down and to the left.
guitarguynboston is offline   Reply With Quote
Old 08-16-2019, 03:14 PM   #3045
F-Line to Dudley
Senior Member
 
Join Date: Nov 2010
Posts: 5,203
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by guitarguynboston View Post
Random question. Has anyone seen what the new maps will look like with the 2 green line extensions? I'm wondering if they'll move the north red slightly down and to the left.
Nothing official-official, but various FCMB presentations over the years have Photoshopped crops of the spider map unofficially. Would probably look similar to the MassDOT 2024 map served up for the Olympics...minus all the Indigo Lines.

F-Line to Dudley is offline   Reply With Quote
Old 08-16-2019, 03:36 PM   #3046
guitarguynboston
Junior Member
 
guitarguynboston's Avatar
 
Join Date: Dec 2009
Location: Massachusetts
Posts: 26
Re: Green Line Extension to Medford & Union Sq

Thanks. I can't wait to see just the subway one. I like the simple straight lines ones. Makes it clearer for just the subway.
guitarguynboston is offline   Reply With Quote
Old 08-17-2019, 04:06 PM   #3047
vanshnookenraggen
Moderator
 
vanshnookenraggen's Avatar
 
Join Date: May 2006
Location: New York City
Posts: 6,274
Re: Green Line Extension to Medford & Union Sq

It just fills in that blank space so nicely.
__________________
http://www.vanshnookenraggen.com | http://futurembta.com | http://hyperrealcartography.tumblr.com
brivx: well, my philosophy is: as designers, we make a good theater, we dont direct the play
vanshnookenraggen is offline   Reply With Quote
Old 08-18-2019, 03:43 PM   #3048
FitchburgLine
Senior Member
 
Join Date: Nov 2013
Posts: 521
Re: Green Line Extension to Medford & Union Sq

From Joe Pesaturo's twitter:

FitchburgLine is offline   Reply With Quote
Old 08-20-2019, 10:29 AM   #3049
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 642
Re: Green Line Extension to Medford & Union Sq

There is something really frustrating about watching this construction. There are segments of the right of way that lie idle for long stretches when it seems like they could parallelize the work. Itís almost like the contractor is the one working on the Porter Square hotels.

For example, the Central to Sycamore block has been idle for weeks, but it seems like they are ready to install the new drains from there to Rogers Foam. The stretch from Central to Lowell is also idle after last winterís drainage installations, in spite of needing noise wall foundations.
RandomWalk is offline   Reply With Quote
Old 08-21-2019, 08:18 AM   #3050
whighlander
Senior Member
 
Join Date: Aug 2006
Location: Lexington
Posts: 6,677
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by RandomWalk View Post
There is something really frustrating about watching this construction. There are segments of the right of way that lie idle for long stretches when it seems like they could parallelize the work. Itís almost like the contractor is the one working on the Porter Square hotels.

For example, the Central to Sycamore block has been idle for weeks, but it seems like they are ready to install the new drains from there to Rogers Foam. The stretch from Central to Lowell is also idle after last winterís drainage installations, in spite of needing noise wall foundations.
RandomW -- that's modern construction - rather than the Egyptian Pyramid model where people lived on the construction site for years -- On a modern construction project such as GLX there is a small team of permanently involved people at the engineering and management level and even fewer actual construction trade people. The rest of the work is being done by a host of specialized sub contractors who are not exactly on the beck and call of the General Contractor as it is too expensive.

So if something slips in the work schedule due to unexpected circumstances and the sub is not paid to stand by and wait -- well then they go off and do another project for which they are also on contract.

Note that other project for the sub might be another piece within the GLX. Not much different than an office building except that since the footprint of the GLX is spread-out over several miles not hundreds of feet -- things might seem abandoned temporarily

Example [not necessarily actual events] -- Sub is putting in foundation for a stretch of elevated track near Lechmere. Work is forced to stop because of unexpected soil conditions until the geotech engineering team can evaluate the site and recommend the appropriate mitigation. Meanwhile the sub can go to another site along the ROW where the project has progressed to the point of needing foundation work -- or maybe there is no other site ready for the foundation work on the GLX and the sub goes to Logan for work there.

Last edited by whighlander; 08-21-2019 at 08:22 AM. Reason: improvement of clarity of post
whighlander is offline   Reply With Quote
Old 08-21-2019, 09:06 AM   #3051
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 642
Re: Green Line Extension to Medford & Union Sq

It would be helpful to folks if they would publish an up to date Gantt chart for the project on their website, instead of a bi-weekly free text update and CWG notes intermittently.
RandomWalk is offline   Reply With Quote
Old 08-21-2019, 11:02 AM   #3052
datadyne007
Moderator
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,732
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by guitarguynboston View Post
Random question. Has anyone seen what the new maps will look like with the 2 green line extensions? I'm wondering if they'll move the north red slightly down and to the left.
No lines will need to be moved. The new map was designed in a way to fit the GLX in.

It just slots right in:
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
Track and catch a ride on the new Orange Line trains at: http://traintracker.transitmatters.org
datadyne007 is offline   Reply With Quote
Old 08-22-2019, 12:05 AM   #3053
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 642
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by RandomWalk View Post
It would be helpful to folks if they would publish an up to date Gantt chart for the project on their website, instead of a bi-weekly free text update and CWG notes intermittently.
And today the GLX folks post the notes from the most recent CWG meeting far earlier than usual. They discuss posting a Gantt chart of ďmilestonesĒ in the near future. Iím skeptical, but itís better than what they currently have.
RandomWalk is offline   Reply With Quote
Old 08-22-2019, 01:39 PM   #3054
AmericanFolkLegend
Senior Member
 
Join Date: Jun 2009
Location: Boston
Posts: 2,144
Re: Green Line Extension to Medford & Union Sq

I have a friend that works at Middlesex and he said they're something like 700 days behind schedule and way overbudget.
AmericanFolkLegend is offline   Reply With Quote
Old 08-22-2019, 02:24 PM   #3055
FitchburgLine
Senior Member
 
Join Date: Nov 2013
Posts: 521
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by AmericanFolkLegend View Post
I have a friend that works at Middlesex and he said they're something like 700 days behind schedule and way overbudget.
What part of the project is Middlesex on? None of that is reflected in the schedules presented to the FMCB and MassDOT board
EDIT: Wait, this makes even less sense. It hasn't been 700 days since the NTP

Last edited by FitchburgLine; 08-22-2019 at 02:45 PM.
FitchburgLine is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Blue Line extension to Lynn PaulC Transit and Infrastructure 263 12-05-2018 11:51 AM
"We want a Blue Line extension to Lynn-Salem" BostonUrbEx Boston Architecture/Urbanism Related Events 0 12-05-2012 11:20 AM
Green Line extension Newton to Needham choo Transit and Infrastructure 12 10-10-2012 10:07 AM
Mock Green Line Extension Groundbreaking! BostonUrbEx Boston Architecture/Urbanism Related Events 12 10-21-2011 03:15 PM
Fitchburg Line Extension pharmerdave Transit and Infrastructure 61 12-20-2010 04:43 PM


All times are GMT -5. The time now is 08:11 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.