Re: I-90 Interchange Improvement Project & West Station | Allston

>> Connecting most if not all cross streets is a no brainer.

MassDOT's current plan has one connection - a footbridge at Malvern St that maybe someday could be widened to allow vehicular traffic

For those of you thinking that MassDOT is sandbagging their estimates for how long this will take, they are proposing to relocate some big utility pipes before the highway & rail work even starts. More info at
https://drive.google.com/open?id=1zh...jhz-woExd3RlQt
Harry Mattison is offline   Reply With Quote
Old 04-29-2019, 01:11 PM   #1022
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,560
Re: I-90 Interchange Improvement Project & West Station | Allston

Quote:
Originally Posted by Harry Mattison View Post
>> Connecting most if not all cross streets is a no brainer.

MassDOT's current plan has one connection - a footbridge at Malvern St that maybe someday could be widened to allow vehicular traffic

For those of you thinking that MassDOT is sandbagging their estimates for how long this will take, they are proposing to relocate some big utility pipes before the highway & rail work even starts. More info at
https://drive.google.com/open?id=1zh...jhz-woExd3RlQt
This has been discussed in some geometric detail here before, grading all of the streets on the BU side to clear the Turnpike would be difficult and expensive.
Equilibria is offline   Reply With Quote
Old Yesterday, 02:44 PM   #1023
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,560
Re: I-90 Interchange Improvement Project & West Station | Allston

Very big update for the FMCB and MassDOT Board on this today. MassDOT, Harvard, the City, and other folks have been working on Harvard's "flip" proposal for West Station. MassDOT has modified Harvard's initial concept but is still working on it - one major potentially-related change is the addition of a Malvern St. transitway bridge to link West Station to the south.

The core of the "flip" is to move the straightaway Worcester Main Line to curve to the north and hug the new highway alignment, allowing the platforms to be closer to Harvard's land. MassDOT essentially rejected the idea of moving all WML service north, but accepted the idea of moving the platforms, with a track maintained on the current straightaway (presumably for express trains and Amtrak) to keep that track at 79mph. The "flip" also presupposes Grand Junction service.

Will post slides when they're up.
Equilibria is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Commonwealth Avenue Improvement Project statler Transit and Infrastructure 683 03-19-2019 07:22 AM
Avalon North Station | Nashua Street Residences | West End castevens Development Projects 1479 11-25-2018 03:58 PM
Fitchburg Line Improvement Project matredsoxfan Transit and Infrastructure 79 07-14-2016 10:58 AM
North Station Expansion Project Ron Newman Transit and Infrastructure 40 08-25-2008 08:01 PM
Nonantum Road Improvement Project - Public Meeting Ron Newman Boston Architecture/Urbanism Related Events 0 06-11-2008 09:53 PM