Old 10-20-2018, 11:14 PM   #1801
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,374
Re: Encore Boston Harbor Casino | Everett

BeeLine is offline   Reply With Quote
Old 10-23-2018, 08:41 PM   #1802
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,295
Re: Encore Boston Harbor Casino | Everett

Looks like it is almost done, except maybe the inside!
Jahvon09 is offline   Reply With Quote
Old 10-23-2018, 11:34 PM   #1803
tangent
Senior Member
 
Join Date: May 2012
Posts: 1,502
Re: Encore Boston Harbor Casino | Everett

Quote:
Originally Posted by statler View Post
So this presents a possible major development opportunity in the area. Unfortunately that development will be lit by candles, but still!


Boston Globe
The old part of the power plant should be redeveloped and casino money would be the only conceivable way to make it happen in our lifetimes.

The newer part of the station shouldn't be shutdown. If anything we need to build out newer capacity here with Pilgrim being shut down and a need for local base load generating capacity.
tangent is offline   Reply With Quote
Old 11-05-2018, 11:05 PM   #1804
DZH22
Senior Member
 
Join Date: Nov 2006
Posts: 4,642
Re: Encore Boston Harbor Casino | Everett

From 11/4

IMG_8150 by David Z, on Flickr

IMG_8152 by David Z, on Flickr

IMG_8179 by David Z, on Flickr
DZH22 is offline   Reply With Quote
Old 11-06-2018, 11:42 AM   #1805
TheBostonian
Senior Member
 
Join Date: May 2006
Location: New England
Posts: 347
Re: Encore Boston Harbor Casino | Everett

Say hello to Boston's new skyline
TheBostonian is offline   Reply With Quote
Old 11-06-2018, 03:24 PM   #1806
stick n move
Senior Member
 
Join Date: Oct 2009
Location: Dorchester
Posts: 4,523
Re: Encore Boston Harbor Casino | Everett

From a building forward sponsored post on facebook.

stick n move is offline   Reply With Quote
Old 11-06-2018, 03:34 PM   #1807
stick n move
Senior Member
 
Join Date: Oct 2009
Location: Dorchester
Posts: 4,523
Re: Wynn Everett Casino | Everett

Quote:
Originally Posted by Boston02124 View Post
I didnt even realize that the tower itself has taken over a year to complete. It was on about the 9th floor over a year ago! So its been a year and a few months just on the tower. Thats insanity. Is this the longest timeline ever on a tower that isnt even tall? So its what a year and 3 months and its just finishing now? Holy crap. Idk how I hadnt even really noticed.


Quote:
Originally Posted by BeeLine View Post






This post is from June of 2017 and the tower is just getting going. So a year and 5 months for the tower. Wooooww...
stick n move is offline   Reply With Quote
Old 11-07-2018, 08:00 AM   #1808
mdd
Senior Member
 
mdd's Avatar
 
Join Date: Mar 2008
Posts: 676
Re: Encore Boston Harbor Casino | Everett

If they don't ever put a pedestrian bridge over to Assembly, they are fools.
mdd is offline   Reply With Quote
Old 11-07-2018, 08:54 AM   #1809
TheRifleman
Senior Member
 
Join Date: Sep 2008
Location: Boston
Posts: 4,350
Re: Encore Boston Harbor Casino | Everett

Quote:
Originally Posted by mdd View Post
If they don't ever put a pedestrian bridge over to Assembly, they are fools.
They will overtime in my opinion
TheRifleman is offline   Reply With Quote
Old 11-07-2018, 11:07 AM   #1810
tangent
Senior Member
 
Join Date: May 2012
Posts: 1,502
Re: Encore Boston Harbor Casino | Everett

Quote:
Originally Posted by mdd View Post
If they don't ever put a pedestrian bridge over to Assembly, they are fools.
A well done pedestrian bridge (with continuity on both sides along the harbor/river) would really be key to tying together the urban fabric of this area. Hope it happens sooner rather than later.

4 or 5 years would be crazy fast speed in Massachusetts time, but maybe there is enough money around this to create some urgency.
tangent is offline   Reply With Quote
Old 11-07-2018, 11:16 AM   #1811
chrisbrat
Senior Member
 
Join Date: Aug 2015
Location: Winter Hill, Somerville
Posts: 463
Re: Encore Boston Harbor Casino | Everett

there has been talk of a pedestrian bridge over 93 connecting assembly to somerville for at least five years (as it is it's not really walkable in any meaningful way from the bulk of somerville. de facto, assembly is in medford), and nothing has actually happened at all. not sure if there's greater urgency to connect assembly to encore, but i'd wager a similarly slow (non)progress.
chrisbrat is offline   Reply With Quote
Old 11-07-2018, 02:34 PM   #1812
HenryAlan
Senior Member
 
Join Date: Dec 2009
Location: Rozzie Square
Posts: 1,756
Re: Encore Boston Harbor Casino | Everett

The big difference is a potentially interested third party with very deep pockets.
HenryAlan is offline   Reply With Quote
Old 11-07-2018, 05:08 PM   #1813
falcon42
Senior Member
 
Join Date: Dec 2015
Posts: 324
Re: Encore Boston Harbor Casino | Everett

Quote:
Originally Posted by mdd View Post
If they don't ever put a pedestrian bridge over to Assembly, they are fools.
Its not their choice...nor Federal's (owner of ARow). There are about 15 agencies involved and the landing is on DCR land. The MBTA has a stake, Wyn, Federal Realty and Federal government over the waterway. Seems like it will take forever.
falcon42 is offline   Reply With Quote
Old 11-10-2018, 08:33 AM   #1814
DZH22
Senior Member
 
Join Date: Nov 2006
Posts: 4,642
Re: Encore Boston Harbor Casino | Everett

From 11/7

IMG_8203 by David Z, on Flickr

IMG_8211 by David Z, on Flickr

IMG_8214 by David Z, on Flickr
DZH22 is offline   Reply With Quote
Old 11-14-2018, 07:48 AM   #1815
DZH22
Senior Member
 
Join Date: Nov 2006
Posts: 4,642
Re: Encore Boston Harbor Casino | Everett

From 11/9

IMG_8246 by David Z, on Flickr

IMG_8304 by David Z, on Flickr
DZH22 is offline   Reply With Quote
Old 11-15-2018, 06:52 AM   #1816
DZH22
Senior Member
 
Join Date: Nov 2006
Posts: 4,642
Re: Encore Boston Harbor Casino | Everett

From 11/12

IMG_8342 by David Z, on Flickr

IMG_8355 by David Z, on Flickr

IMG_8358 by David Z, on Flickr
DZH22 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Everett and north metro Boston transit FK4 Transit and Infrastructure 30 12-08-2016 12:09 PM
One Harbor Shore Dr. | Fan Pier Parcel H | 1 Harbor Shore Drive | Seaport BeeLine Development Projects 49 10-17-2016 11:02 AM
30 year cleanup of Boston Harbor completed stellarfun Transit and Infrastructure 8 08-22-2016 02:29 PM
Should Boston build a Casino? KentXie General 83 05-01-2012 08:35 PM
BRA Meeting: E. Boston Municipal Harbor Plan briv Boston Architecture/Urbanism Related Events 0 06-23-2008 04:35 PM


All times are GMT -5. The time now is 12:47 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.