I think it almost always makes sense to have commuter rail to subway transfer at the end of the subway line. That would also make the Alewife garage useful for people taking commuter rail, and that could take some load off the Red Line. I suppose you could eliminate the Porter CR stop, but the point of Regional Rail is to have closer-together stations. Having the station at Alewife makes a lot of sense for people who live near Alewife as well. If they're going to Union Square or North Station, they would then be able to take one train rather than two. And it would allow them to reverse commute without going in to go out.
cden4 is offline   Reply With Quote
Old 05-06-2018, 10:33 AM   #2842
ryblogs
Junior Member
 
Join Date: Aug 2017
Location: Somerville
Posts: 16
Re: Green Line Extension to Medford & Union Sq

Saw this on my walk into Union Sq this morning, thought it was hilariously general... "5/2018 to 9/2021"

ryblogs is offline   Reply With Quote
Old 05-07-2018, 09:56 PM   #2843
BostonUrbEx
Senior Member
 
BostonUrbEx's Avatar
 
Join Date: Mar 2010
Location: North Shore
Posts: 4,251
Re: Green Line Extension to Medford & Union Sq

Ha! Shared your image to New Urbanist Memes for Transit-Oriented Teens. I found the broad time frame very amusing.
__________________
Quote:
Originally Posted by choo View Post
forget it ever happening, its too great an idea.
BostonUrbEx is offline   Reply With Quote
Old 05-08-2018, 08:19 AM   #2844
ceo
Senior Member
 
Join Date: May 2009
Posts: 110
Re: Green Line Extension to Medford & Union Sq

Might as well add "IT'S GONNA SUCK".
ceo is offline   Reply With Quote
Old 05-08-2018, 09:08 AM   #2845
Arlington
Senior Member
 
Join Date: Dec 2011
Location: West Medford, MA
Posts: 3,267
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by ryblogs View Post
Saw this on my walk into Union Sq this morning, thought it was hilariously general... "5/2018 to 9/2021"
It is hilariously general for roadside variable message signs, but I'd say refreshingly specific and helpful compared to the old school "your tax dollars at work" or the usual Governor/Mayor/Secretary/Board/Engineer list of bigwigs.

Since it isn't a "traffic now" or "construction soon" sign, we'd have to say it is purely a "political" message (in the sense of being related to we, as a polity make policy)

As a political message, it says:
1) ITS HAPPENING (picture Ron Paul meme here)
2) When does it start (May 2018)
3) When will we get there (Sept 2021)

That's way more useful than the usual placard of bigwigs and funding sources (which often omit target completion dates...although, I suppose, a promised completion date from a VMS is less binding than paint-on-plywood)
__________________
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington is online now   Reply With Quote
Old 05-09-2018, 08:04 AM   #2846
Arch101
Member
 
Join Date: Nov 2008
Location: Waltham
Posts: 94
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by ryblogs View Post
Saw this on my walk into Union Sq this morning, thought it was hilariously general... "5/2018 to 9/2021"

In todays weather: rain followed by sun. Followed by darkness. After that, some light.
Arch101 is offline   Reply With Quote
Old 06-11-2018, 06:40 AM   #2847
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 7,582
Re: Green Line Extension to Medford & Union Sq

Don't get too excited, but they have removed the trees and brush from behind the Glassworks Apt. building. Are we seeing the start of something GOOD?????



BeeLine is offline   Reply With Quote
Old 06-11-2018, 08:14 AM   #2848
Arlington
Senior Member
 
Join Date: Dec 2011
Location: West Medford, MA
Posts: 3,267
Re: Green Line Extension to Medford & Union Sq

All kinds of vegetation and trash is being cleared up and down the right of way, often in conjunction with soil testing rigs and survey work.
__________________
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington is online now   Reply With Quote
Old 07-09-2018, 02:04 PM   #2849
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 527
Re: Green Line Extension to Medford & Union Sq

I think thatís for the adjacent Somerville High School project.
RandomWalk is offline   Reply With Quote
Old 07-09-2018, 02:06 PM   #2850
FitchburgLine
Senior Member
 
Join Date: Nov 2013
Posts: 280
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by RandomWalk View Post
I think thatís for the adjacent Somerville High School project.
Is it for both? The wall looks placed to widen the RoW on the Green Line side
FitchburgLine is offline   Reply With Quote
Old 07-09-2018, 02:16 PM   #2851
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 527
Re: Green Line Extension to Medford & Union Sq

Derenzo is not one of the GLX contractors, and itís on the far side of the service drive at the school.
RandomWalk is offline   Reply With Quote
Old 07-09-2018, 02:19 PM   #2852
FitchburgLine
Senior Member
 
Join Date: Nov 2013
Posts: 280
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by RandomWalk View Post
Derenzo is not one of the GLX contractors, and itís on the far side of the service drive at the school.
That's unfortunate, but thanks for the info
FitchburgLine is offline   Reply With Quote
Old 07-10-2018, 06:20 AM   #2853
stefalarchitect
Senior Member
 
Join Date: Jan 2015
Posts: 326
Re: Green Line Extension to Medford & Union Sq

Is Middlesex a contractor? There's some equipment from them along the Lowell line. In addition, there is a bunch of equipment that has a temporary white plastic "GLX Constructors" sign on them, with a symbol of a green line car and everything; still not sure what company they're from, I'll try to pick it out one of these days. I'd say they've commenced on ROW clearing and some preliminary grade work, at least...
stefalarchitect is offline   Reply With Quote
Old 07-10-2018, 10:29 AM   #2854
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 527
Re: Green Line Extension to Medford & Union Sq

They have pulled the old fourth track from the ROW, and theyíre doing a bunch of grubbing. The current end of the bike path had a nice view of the work.
RandomWalk is offline   Reply With Quote
Old 07-10-2018, 05:23 PM   #2855
ryblogs
Junior Member
 
Join Date: Aug 2017
Location: Somerville
Posts: 16
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by stefalarchitect View Post
Is Middlesex a contractor? There's some equipment from them along the Lowell line. In addition, there is a bunch of equipment that has a temporary white plastic "GLX Constructors" sign on them, with a symbol of a green line car and everything; still not sure what company they're from, I'll try to pick it out one of these days. I'd say they've commenced on ROW clearing and some preliminary grade work, at least...
yes

http://www.av20170164.com/team.html
ryblogs is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Blue Line extension to Lynn PaulC Transit and Infrastructure 244 07-23-2017 03:13 PM
"We want a Blue Line extension to Lynn-Salem" BostonUrbEx Boston Architecture/Urbanism Related Events 0 12-05-2012 11:20 AM
Green Line extension Newton to Needham choo Transit and Infrastructure 12 10-10-2012 10:07 AM
Mock Green Line Extension Groundbreaking! BostonUrbEx Boston Architecture/Urbanism Related Events 12 10-21-2011 03:15 PM
Fitchburg Line Extension pharmerdave Transit and Infrastructure 61 12-20-2010 04:43 PM


All times are GMT -5. The time now is 09:19 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.