Old 01-12-2018, 11:07 AM   #401
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,150
Re: Logan Airport Capital Projects

Quote:
Originally Posted by datadyne007 View Post
I posted the winning scheme in Post 344: http://www.archboston.org/community/...&postcount=344

I think the KPF design is actually superior.
So do I, but I wonder if the AECOM design won for more mundane reasons - integration of baggage systems or something.

AECOM has done a lot of good work at Logan, while KPF has done none. As a customer, I support going with the known quantity. I hope they ask AECOM/Vidal about using the engineered wood in the actual designs, though. That looked really cool.
Equilibria is offline   Reply With Quote
Old 01-12-2018, 05:23 PM   #402
atlantaden
Senior Member
 
Join Date: May 2006
Location: atlanta
Posts: 1,828
Re: Logan Airport Capital Projects

Just build the thing!!
atlantaden is offline   Reply With Quote
Old 01-12-2018, 09:19 PM   #403
mass88
Senior Member
 
Join Date: Jan 2008
Posts: 1,852
Re: Logan Airport Capital Projects

Seems like a big difference between the bids are the one (AECOM) will have passengers de-plane and walk straight through to immigration while the terminal itself is on the upper level, similar to how SFO's international terminal is setup. KPF would have passengers go up above to head to immigration, similar to LAX and MIA.

Has there been a firm start date for the project?
mass88 is offline   Reply With Quote
Old 01-26-2018, 11:22 AM   #404
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,150
Re: Logan Airport Capital Projects

And work begins on the C piers:

https://www.massport.com/capitalprog...pplemental.pdf
Equilibria is offline   Reply With Quote
Old 01-26-2018, 12:05 PM   #405
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,567
Re: Logan Airport Capital Projects

Quote:
Originally Posted by Equilibria View Post
Gorgeous xD



__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Old 01-26-2018, 01:12 PM   #406
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,150
Re: Logan Airport Capital Projects

Quote:
Originally Posted by datadyne007 View Post
Gorgeous xD
Yeah, but it's not like they can do windows. It's back-of-the-house and bathrooms.
Equilibria is offline   Reply With Quote
Old 01-26-2018, 02:11 PM   #407
mass88
Senior Member
 
Join Date: Jan 2008
Posts: 1,852
Re: Logan Airport Capital Projects

It's too bad they cannot completely demolish and rebuild the piers with 20 plus foot ceilings and all glass.

Since they can't expand outward, what's to stop them from putting a large concession/retail space on top of the existing terminal?
mass88 is offline   Reply With Quote
Old 01-26-2018, 03:42 PM   #408
jass
Senior Member
 
Join Date: Jul 2006
Posts: 4,098
Re: Logan Airport Capital Projects

Women get 20 stalls and men get 3?

WTF?
jass is offline   Reply With Quote
Old 01-26-2018, 04:00 PM   #409
Jouhou
Senior Member
 
Jouhou's Avatar
 
Join Date: Nov 2015
Location: Portsmouth, NH
Posts: 600
Re: Logan Airport Capital Projects

Quote:
Originally Posted by jass View Post
Women get 20 stalls and men get 3?

WTF?
At least y'all can pee standing up.
Jouhou is offline   Reply With Quote
Old 01-26-2018, 04:03 PM   #410
atlantaden
Senior Member
 
Join Date: May 2006
Location: atlanta
Posts: 1,828
Re: Logan Airport Capital Projects

Massport is so timid, at this rate it will take 20 years for the Terminal C piers to be finished. I will give them credit though, for the improvements made with the new connector from C to E. They did a beautiful job there, I only hope this will be just as nice.
atlantaden is offline   Reply With Quote
Old 01-26-2018, 04:57 PM   #411
jass
Senior Member
 
Join Date: Jul 2006
Posts: 4,098
Re: Logan Airport Capital Projects

Quote:
Originally Posted by Jouhou View Post
At least y'all can pee standing up.
Guys also poo.

Before a 10 hour flight, there is high demand to poo.
jass is offline   Reply With Quote
Old 01-26-2018, 07:07 PM   #412
mass88
Senior Member
 
Join Date: Jan 2008
Posts: 1,852
Re: Logan Airport Capital Projects

Quote:
Originally Posted by jass View Post
Guys also poo.

Before a 10 hour flight, there is high demand to poo.
To be fair 10 hour flights don't depart from this terminal now that Emirates is over in Terminal E.......

What's to become of the old bathrooms across the way? Open it up to more seating?
mass88 is offline   Reply With Quote
Old 02-14-2018, 06:00 PM   #413
stellarfun
Senior Member
 
Join Date: Dec 2006
Location: salem ma and washington dc
Posts: 4,420
Re: Logan Airport Capital Projects

Quote:
GLOBE STAFF FEBRUARY 14, 2018
Logan Airport’s Terminal E could soon have a Jetsons-like futuristic look — complete with a lipstick-red roof and skylights in the shape of “eyelashes.”

Multinational engineering firm AECOM, along with Madrid-based luis vidal + architects, were selected by the Massachusetts Port Authority to modernize the 44-year-old international flight terminal with a proposal that may transform the busy building into an iconic new Boston landmark.
http://www.bostonglobe.com/business/...GKL/story.html

Article seems a bit garbled as to this being a new wing. Also mentions a new roof and windows in the existing terminal to let in more natural light.



__________________
A man gazing on the stars is at the mercy of the puddles in the road
stellarfun is online now   Reply With Quote
Old 02-14-2018, 06:16 PM   #414
shmessy
Senior Member
 
Join Date: Apr 2010
Posts: 1,242
Re: Logan Airport Capital Projects

Quote:
Originally Posted by stellarfun View Post
http://www.bostonglobe.com/business/...GKL/story.html

Article seems a bit garbled as to this being a new wing. Also mentions a new roof and windows in the existing terminal to let in more natural light.
Austin Powers Voice: "That's Grooovy baby!!"

Honestly, I like it very much. Great placement for a splashy statement.
shmessy is offline   Reply With Quote
Old 02-14-2018, 07:41 PM   #415
mass88
Senior Member
 
Join Date: Jan 2008
Posts: 1,852
Re: Logan Airport Capital Projects

Hurry up and get this thing built. It will be interesting to see what they do with the existing terminal and how the new windows and roof work for it. Anything will be a welcomed upgrade.
mass88 is offline   Reply With Quote
Old 02-14-2018, 07:48 PM   #416
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,150
Re: Logan Airport Capital Projects

Finally these are posted, probably because they did the Terminal E announcement today, or maybe because they posted tomorrow's agenda:

http://www.massport.com/media/2704/0..._watermark.pdf

Fun really starts on p.119, but they do have a pretty firm tone when discussing the APM thoughout. This is happening.

4 total new gates are planned for B and C: 2 at the end of the B pier (since they don't need to fit 777s there for Southwest), 1 on the B/C connector, and 1 on one of the C piers.
Equilibria is offline   Reply With Quote
Old 02-14-2018, 08:16 PM   #417
CSTH
Senior Member
 
Join Date: Oct 2009
Posts: 1,645
Re: Logan Airport Capital Projects

Wait aren't those the old renders? I thought the one with all the engineered wood was the most recent?
CSTH is offline   Reply With Quote
Old 02-14-2018, 08:18 PM   #418
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,567
Re: Logan Airport Capital Projects

Quote:
Originally Posted by CSTH View Post
Wait aren't those the old renders? I thought the one with all the engineered wood was the most recent?
No. The engineered wood one was a losing bid.
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Old 02-14-2018, 10:05 PM   #419
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,309
Re: Logan Airport Capital Projects

Looks like a space ship has landed on top of it!!
Jahvon09 is offline   Reply With Quote
Old 02-15-2018, 11:59 AM   #420
RandomWalk
Senior Member
 
Join Date: Feb 2014
Posts: 569
Re: Logan Airport Capital Projects

Too bad they can’t take the opportunity to rename the terminal to D.
RandomWalk is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Logan Airport mass88 Transit and Infrastructure 32 06-28-2013 08:36 AM
If Logan Airport were moved.... JS38 Development Projects 26 11-24-2008 05:25 PM
New Logan 9/11 Monument bostonman Development Projects 28 09-12-2008 01:55 PM
If We Moved Logan Airport... Waldorf General Architecture & Urban Planning 4 04-05-2007 04:25 PM
Welcome to Portland. Business friendly capital of the world grittys457 Greater New England 0 01-12-2007 08:41 PM


All times are GMT -5. The time now is 06:24 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.