Old 12-03-2017, 05:04 PM   #2781
FK4
Senior Member
 
Join Date: Nov 2012
Posts: 1,859
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Joel N. Weber II View Post
I'm wondering whether Orange Line to Roslindale Village would have better return on investment than Green Line to Mystic Valley Parkway.
Well, this has been extensively discussed and their isn’t agreement among our would-be transit engineers as to how feasible that actually would be. The better move would be replacing the entire Needham Line with Orange and Green, and probably leaving out Hershey altogether.
FK4 is offline   Reply With Quote
Old 12-14-2017, 03:25 PM   #2782
Joel N. Weber II
Senior Member
 
Join Date: Aug 2015
Posts: 562
Re: Green Line Extension to Mystic Valley Parkway vs Needham and West Roxbury

Quote:
Originally Posted by FK4 View Post
The better move would be replacing the entire Needham Line with Orange and Green, and probably leaving out Hershey altogether.
I'd certainly be happy to see all of that built more or less as one large project (although the ideal way to phase construction would probably be to convert the Needham part first, then the Orange Line part if you're trying to minimize the time stations lose rail service; and the Green Line bridge across the Charles can be built before the active segments are touched, and the vertical catenary poles can probably also be installed while the commuter rail is still running), but if we're talking about the best thing to do with the dollars currently earmarked for the Mystic Valley Parkway Green Line extension, those dollars probably aren't going to pay for all of Green to Needham plus Orange to West Roxbury.

Then with Needham there's also the question of whether more riders and branches west of Copley is going to strain the system, in a way that a one stop extension on what will become an existing branch of the underutilized Lechmere side of the system won't be a similar strain.

We also need more Orange Line rolling stock before we can do this (and maybe more Green Line trains too), but the Orange Line trains should get delivered long before anyone is likely to get the environmental study of the Orange Line extension done.
Joel N. Weber II is offline   Reply With Quote
Old 12-19-2017, 07:37 AM   #2783
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,005
Re: Green Line Extension to Medford & Union Sq

I could have sworn we had a dedicated Green Line vehicles thread. Oh well...

https://d3044s2alrsxog.cloudfront.ne...light-rail.pdf

IFFP presentation for Light Rail (GL and MHSL). Mostly no news, since they're punting the big decisions to the ongoing visioning studies for both lines. Type 9 deliveries in 2018 - Type 10 discussion begins once the vision study is done and the Type 9s have been running for a while. The one note on Type 10 is that they want capacity to increase over the current fleet, and it's implied that the Type 10 fleet would replace both Type 7 and Type 8.

Mattapan PCCs are being overhauled to last past 2020. All the rest of the news is left to the line-specific study in January.
Equilibria is offline   Reply With Quote
Old 12-19-2017, 08:56 AM   #2784
FitchburgLine
Senior Member
 
Join Date: Nov 2013
Posts: 315
Re: Green Line Extension to Medford & Union Sq

Of note, the first GLX “community working group” is today at 10:30am. Hopefully the agenda is posted online because that’s the least convenient time possible.
FitchburgLine is offline   Reply With Quote
Old 12-19-2017, 12:28 PM   #2785
The EGE
Senior Member
 
Join Date: Jun 2013
Posts: 604
Re: Green Line Extension to Medford & Union Sq

A little bit of self-promotion: my masters thesis (done with the MIT Transit Lab under contract to the MBTA) included an analysis of Type 10 options and the infrastructure changes needed to support them.
The EGE is offline   Reply With Quote
Old 12-19-2017, 12:34 PM   #2786
bakgwailo
Senior Member
 
Join Date: Apr 2016
Posts: 689
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Equilibria View Post
Mattapan PCCs are being overhauled to last past 2020. All the rest of the news is left to the line-specific study in January.
I would think you mean 2030?
bakgwailo is online now   Reply With Quote
Old 12-19-2017, 11:25 PM   #2787
winstonoboogie
Senior Member
 
Join Date: Dec 2012
Posts: 541
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by The EGE View Post
A little bit of self-promotion: my masters thesis (done with the MIT Transit Lab under contract to the MBTA) included an analysis of Type 10 options and the infrastructure changes needed to support them.
Nice work, although unless I am missing something or misinterpreting what you wrote, the Siemens S70 is not a 100% low-floor car:

http://www.modernstreetcar.org/pdf/S...11%20photo.pdf

(Note steps in the interior leading up to the section above the motor trucks):
http://www.modernstreetcar.org/image...tcar_10_sm.jpg

Of course, the announced merger of Siemens and Alstom since you wrote your thesis will probably result in one of their two "standard product" lines being merged or dropped by the time the Type 10 is ordered, so it might not be an option by then anyway. And I would also guess there is a good chance Bombardier will be merged into another builder by the time the Type 10 is ordered.
And despite not having any standard light rail product line at the moment, I'm sure CRRC will bid on any future MBTA order for any type of rail vehicle.
winstonoboogie is offline   Reply With Quote
Old 12-20-2017, 07:08 AM   #2788
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 3,005
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by bakgwailo View Post
I would think you mean 2030?
Nope, 2020. See slide 13.
Equilibria is offline   Reply With Quote
Old 12-21-2017, 10:43 AM   #2789
FitchburgLine
Senior Member
 
Join Date: Nov 2013
Posts: 315
Re: Green Line Extension to Medford & Union Sq

Notice To Proceed issued! We're in the construction phase!
https://www.mbta.com/news/3239
FitchburgLine is offline   Reply With Quote
Old 12-22-2017, 10:26 PM   #2790
Charlie_mta
Senior Member
 
Charlie_mta's Avatar
 
Join Date: Jul 2006
Posts: 1,181
Re: Green Line Extension to Medford & Union Sq

I saw today that the Feds released the first $100 million of their $996 million grant for construction.

https://www.transit.dot.gov/about/ne...sachusetts-bay
Charlie_mta is offline   Reply With Quote
Old 01-29-2018, 11:04 PM   #2791
odurandina
Senior Member
 
odurandina's Avatar
 
Join Date: Dec 2015
Posts: 3,700
Re: Green Line Extension to Medford & Union Sq

https://www.boston.com/news/local-ne...tension-anyway
odurandina is offline   Reply With Quote
Old 01-30-2018, 07:03 AM   #2792
Arlington
Senior Member
 
Join Date: Dec 2011
Location: West Medford, MA
Posts: 3,288
Re: Green Line Extension to Medford & Union Sq

^ From 2016. What value can/should we draw from it today? (20 months hence)
__________________
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington is offline   Reply With Quote
Old 02-04-2018, 03:14 PM   #2793
FitchburgLine
Senior Member
 
Join Date: Nov 2013
Posts: 315
Re: Green Line Extension to Medford & Union Sq

Big update posted about upcoming construction, preparing for "Spring 2018" excavation work.
http://greenlineextension.eot.state....struction.html
FitchburgLine is offline   Reply With Quote
Old 03-19-2018, 06:50 PM   #2794
Uncivil_Engineer
Member
 
Join Date: Jun 2014
Location: Oakland-ish
Posts: 85
Re: Green Line Extension to Medford & Union Sq

Quarterly update presented at the MassDOT/FMCB board meeting today.

In other news, the first Type 9 got delivered last week. Schedule in the DGM remarks (linked) has the first pair in service this summer.
Uncivil_Engineer is offline   Reply With Quote
Old 03-24-2018, 07:45 PM   #2795
odurandina
Senior Member
 
odurandina's Avatar
 
Join Date: Dec 2015
Posts: 3,700
Re: Green Line Extension to Medford & Union Sq

https://www.bostonglobe.com/metro/20...06I/story.html
odurandina is offline   Reply With Quote
Old 03-25-2018, 11:57 AM   #2796
cadetcarl
Senior Member
 
Join Date: Sep 2012
Location: Boston/Medford
Posts: 260
Re: Green Line Extension to Medford & Union Sq

That paint job...woof.
cadetcarl is offline   Reply With Quote
Old 03-25-2018, 04:55 PM   #2797
Charlie_mta
Senior Member
 
Charlie_mta's Avatar
 
Join Date: Jul 2006
Posts: 1,181
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by odurandina View Post


The squarish front end of the lead car looks more suited to 1918 than 2018.

Boston can look a bit modern, for crying out loud; we have the Zakim Bridge, the Millennium Tower, etc.

Last edited by Charlie_mta; 03-25-2018 at 05:18 PM.
Charlie_mta is offline   Reply With Quote
Old 03-25-2018, 06:06 PM   #2798
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,270
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Charlie_mta View Post


The squarish front end of the lead car looks more suited to 1918 than 2018.

Boston can look a bit modern, for crying out loud; we have the Zakim Bridge, the Millennium Tower, etc.

Also, note the doors. They slide open & close like the ones that were featured on the Type 6 LRV's.
Jahvon09 is offline   Reply With Quote
Old 03-25-2018, 06:29 PM   #2799
bakgwailo
Senior Member
 
Join Date: Apr 2016
Posts: 689
Re: Green Line Extension to Medford & Union Sq

Well, it is what we get for allowing people to vote on the paint scheme online (although I am happy with the orange/red winning schemes). Are they also really not fully low floor?
bakgwailo is online now   Reply With Quote
Old 03-25-2018, 06:30 PM   #2800
citylover94
Senior Member
 
Join Date: Oct 2012
Location: White River Jct.
Posts: 1,070
Re: Green Line Extension to Medford & Union Sq

I think the flat front is partially a result of tunnel clearance issues with some of the tightest curves and is used to keep the train shorter allowing more space for passengers.
citylover94 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Blue Line extension to Lynn PaulC Transit and Infrastructure 244 07-23-2017 03:13 PM
"We want a Blue Line extension to Lynn-Salem" BostonUrbEx Boston Architecture/Urbanism Related Events 0 12-05-2012 11:20 AM
Green Line extension Newton to Needham choo Transit and Infrastructure 12 10-10-2012 10:07 AM
Mock Green Line Extension Groundbreaking! BostonUrbEx Boston Architecture/Urbanism Related Events 12 10-21-2011 03:15 PM
Fitchburg Line Extension pharmerdave Transit and Infrastructure 61 12-20-2010 04:43 PM


All times are GMT -5. The time now is 01:16 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.