archBOSTON.org

Go Back   archBOSTON.org > Boston's Built Environment > Transit and Infrastructure

Transit and Infrastructure All things T or civilly engineered within Boston Metro.

Reply
 
Thread Tools Search this Thread
Old 12-29-2017, 09:41 PM   #5001
swtat
Member
 
Join Date: Sep 2014
Location: Malden
Posts: 39
Re: Orange Line bustitution

Quote:
Originally Posted by Joel N. Weber II View Post
Apparently the Orange Line was bustituted today due to a broken rail on the bridge over the Mystic.

What I'm curious about is why the express track wasn't used to avoid the broken rail. Perhaps that would have meant no northbound trains would have stopped at Assembly, but wouldn't getting off at Assembly by changing to a southbound train at Wellington or heading from Assembly to stops north of the Mystic by changing at Sullivan have been less of a pain than bustitution?
You mean the test track? It's an active construction site right now and it's missing the third rail between Sullivan Square and Community College.
swtat is offline   Reply With Quote
Old 12-30-2017, 04:54 PM   #5002
Jouhou
Senior Member
 
Jouhou's Avatar
 
Join Date: Nov 2015
Location: Portsmouth, NH
Posts: 465
Re: General MBTA Discussion Thread

https://www.nbcconnecticut.com/news/...467182403.html
Jouhou is offline   Reply With Quote
Old 12-30-2017, 05:58 PM   #5003
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,060
Re: General MBTA Discussion Thread

I'm sure that there will be lawsuits resulting from this incident!
Jahvon09 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
A discussion regarding Chinatown commuter guy Boston Architecture & Urbanism 31 05-07-2016 06:30 AM
MBTA thread(s) cleanup Arlington Board Issues and Announcements 2 03-12-2015 06:46 PM
General RER-type service thread BostonUrbEx Transit and Infrastructure 26 11-22-2014 02:16 PM
General Real Estate/Rental Discussion BostonUrbEx Boston Architecture & Urbanism 5 04-16-2012 02:46 PM
aB Awards General Discussion statler 2008 Awards Nominations & Discussion 10 02-18-2009 06:40 AM


All times are GMT -5. The time now is 11:29 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.