Old 02-08-2018, 09:11 PM   #5081
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,268
Re: General MBTA Discussion Thread

The theory that I'm trying to make is update & modify the whole thing & be done with it, rather than procrastinate on what they should do.

Shit or get off the pot!!
Jahvon09 is offline   Reply With Quote
Old 02-08-2018, 09:43 PM   #5082
bakgwailo
Senior Member
 
Join Date: Apr 2016
Posts: 687
Re: General MBTA Discussion Thread

They are studying the long term plan of the line. That takes time. Any conversion on the line to modern LVRs, heavy rail, or anything else is going to take a bunch of money as already discussed. This ensures service on the line continues for the short term and isn't that expensive.
bakgwailo is offline   Reply With Quote
Old 02-09-2018, 01:25 PM   #5083
kingofsheeba
Senior Member
 
Join Date: Aug 2013
Location: Charlestown
Posts: 219
Re: General MBTA Discussion Thread

http://www.bostonmagazine.com/news/2...eo-screens-ad/

These NIMBYs are nutrageous.
kingofsheeba is offline   Reply With Quote
Old 02-09-2018, 01:30 PM   #5084
JumboBuc
Senior Member
 
Join Date: Jun 2013
Location: The Fenway
Posts: 1,633
Re: General MBTA Discussion Thread

Quote:
Originally Posted by kingofsheeba View Post
I'm with them on this.

From the Globe:


That's just not necessary.

Hang those screens on the walls inside the station and leave the signs alone.
JumboBuc is offline   Reply With Quote
Old 02-09-2018, 01:38 PM   #5085
kingofsheeba
Senior Member
 
Join Date: Aug 2013
Location: Charlestown
Posts: 219
Re: General MBTA Discussion Thread

Quote:
Originally Posted by JumboBuc View Post
I'm with them on this.

From the Globe:


That's just not necessary.

Hang those screens on the walls inside the station and leave the signs alone.
What's your rationale? There's nothing historical about the Arlington Station sign. Unless the actual sign is listed on the National Registry of Historical Places, then tell these NIMBYs to take a hike.
kingofsheeba is offline   Reply With Quote
Old 02-09-2018, 01:46 PM   #5086
bakgwailo
Senior Member
 
Join Date: Apr 2016
Posts: 687
Re: General MBTA Discussion Thread

I for one don't need to be bombarded with advertising walking by Arlington Station.
bakgwailo is offline   Reply With Quote
Old 02-09-2018, 01:47 PM   #5087
JumboBuc
Senior Member
 
Join Date: Jun 2013
Location: The Fenway
Posts: 1,633
Re: General MBTA Discussion Thread

Quote:
Originally Posted by kingofsheeba View Post
What's your rationale? There's nothing historical about the Arlington Station sign. Unless the actual sign is listed on the National Registry of Historical Places, then tell these NIMBYs to take a hike.
I couldn't care less if it's on the National Registry of Historical Places or not. Designations like that mean nothing to me. What matters is that the TV screens are tacky af and don't fit the aesthetic.

My concerns aren't about "preserving history" as much as they are about good design. The Cambridge Seven MBTA signage is good design and good branding. "ARLINGTON" and "TO ALL TRAINS" in simple black, green, and white is a classy look. The flatscreens broadcasting Dunkin Donuts ads are not. It's easy as that...
JumboBuc is offline   Reply With Quote
Old 02-09-2018, 01:50 PM   #5088
kingofsheeba
Senior Member
 
Join Date: Aug 2013
Location: Charlestown
Posts: 219
Re: General MBTA Discussion Thread

You guys are weak sauce on this one...


First off, the historic church across the street had a sign that read "God is a Patriots Fan." If the church can get with the times, then so can the T.


Second, not everyone has a cell phone. Some are visiting from overseas and they don't have data.
kingofsheeba is offline   Reply With Quote
Old 02-09-2018, 03:11 PM   #5089
Uncivil_Engineer
Member
 
Join Date: Jun 2014
Location: Oakland-ish
Posts: 85
Re: General MBTA Discussion Thread

I actually like the idea of above-ground signage (assuming that the advertising will alternate with train information). Maybe not the most necessary at Arlington, but for example at Porter it's nice to know how much one needs to hustle for the next train.
Uncivil_Engineer is offline   Reply With Quote
Old 02-13-2018, 01:18 PM   #5090
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,268
Re: General MBTA Discussion Thread

Here's a clip from Wikipedia.org on the future of the Ashmont / Mattapan Line;


"On several occasions, the MBTA has proposed to replace the PCC streetcars either with newer trolleys or with buses, and has met with substantial community opposition on each occasion. The FY2017-FY2021 Capital Investment Plan, approved by the MassDOT board in June 2016, allocated $9 million to the line including $3.7 million for maintaining the PCC cars. The plan also allocates $5 million for "PCC Car Replacement-Alternative Service" which will be used for future funding should an alternate form of transportation be decided upon.[16] In 2017, MBTA began a $7.9 million project to overhaul the trollies and update the propulsion systems, but further problems such as fluctuations in power damaged the four operating trains in early 2018.[17][18] On February 5, 2018 it was reported that eight more trollies were going to re-enter service in 2019, the fixes will prolong the lifespan of the trains by another 7 to 8 years.[19] The MBTA also announced that it is studying alternatives again to running trolleys, draft recommendations are planned to be completed by the Spring."
Jahvon09 is offline   Reply With Quote
Old 02-13-2018, 01:56 PM   #5091
tysmith95
Senior Member
 
Join Date: Feb 2016
Location: North Shore
Posts: 2,109
Re: General MBTA Discussion Thread

So is that 5 million dollars just going to sit in the bank? Is it going to be used to pay for "studies". I'm confused.
tysmith95 is offline   Reply With Quote
Old 02-13-2018, 02:18 PM   #5092
bakgwailo
Senior Member
 
Join Date: Apr 2016
Posts: 687
Re: General MBTA Discussion Thread

Quote:
Originally Posted by Jahvon09 View Post
Here's a clip from Wikipedia.org on the future of the Ashmont / Mattapan Line;


"On several occasions, the MBTA has proposed to replace the PCC streetcars either with newer trolleys or with buses, and has met with substantial community opposition on each occasion. The FY2017-FY2021 Capital Investment Plan, approved by the MassDOT board in June 2016, allocated $9 million to the line including $3.7 million for maintaining the PCC cars. The plan also allocates $5 million for "PCC Car Replacement-Alternative Service" which will be used for future funding should an alternate form of transportation be decided upon.[16] In 2017, MBTA began a $7.9 million project to overhaul the trollies and update the propulsion systems, but further problems such as fluctuations in power damaged the four operating trains in early 2018.[17][18] On February 5, 2018 it was reported that eight more trollies were going to re-enter service in 2019, the fixes will prolong the lifespan of the trains by another 7 to 8 years.[19] The MBTA also announced that it is studying alternatives again to running trolleys, draft recommendations are planned to be completed by the Spring."
Which is... everything we have already discussed here?
bakgwailo is offline   Reply With Quote
Old 02-13-2018, 03:58 PM   #5093
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,268
Re: General MBTA Discussion Thread

I knew that they thought about updating repairing the trolleys. But I did not think that they'd be around & in use for another 7 - 8 years.
Jahvon09 is offline   Reply With Quote
Old 02-14-2018, 09:57 AM   #5094
jass
Senior Member
 
Join Date: Jul 2006
Posts: 4,029
Re: General MBTA Discussion Thread

Theres no reason they cant be there in 50 years.
jass is offline   Reply With Quote
Old 02-14-2018, 10:14 AM   #5095
tysmith95
Senior Member
 
Join Date: Feb 2016
Location: North Shore
Posts: 2,109
Re: General MBTA Discussion Thread

Quote:
Originally Posted by kingofsheeba View Post
Second, not everyone has a cell phone. Some are visiting from overseas and they don't have data.
Every-time I go somewhere without data I download the area that i'm visiting in advance. I wouldn't travel without G-Maps information.
tysmith95 is offline   Reply With Quote
Old 02-14-2018, 12:09 PM   #5096
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,268
Re: General MBTA Discussion Thread

Not only that. Pay phones are almost & pretty much a thing of the past now. You hardly see one around nowadays!
Jahvon09 is offline   Reply With Quote
Old 02-20-2018, 06:02 PM   #5097
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,268
Re: General MBTA Discussion Thread

The MBTA's Green Line is in danger of having more derailments!


http://www.fox25boston.com/news/gree...says/703398857
Jahvon09 is offline   Reply With Quote
Old 02-21-2018, 02:43 PM   #5098
bakgwailo
Senior Member
 
Join Date: Apr 2016
Posts: 687
Re: General MBTA Discussion Thread

Pretty epic Red Line failure at Andrew today. Looks like a motor blew causing smoke along with windows to blow out on the train and possibly track damage. They are still running Shuttle buses between Andrew and JFK with Severe delays as of 3:45pm and have been since 9:30am.
bakgwailo is offline   Reply With Quote
Old 02-21-2018, 02:45 PM   #5099
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,452
Re: General MBTA Discussion Thread

Quote:
Originally Posted by bakgwailo View Post
Pretty epic Red Line failure at Andrew today. Looks like a motor blew causing smoke along with windows to blow out on the train and possibly track damage. They are still running Shuttle buses between Andrew and JFK with Severe delays as of 3:45pm and have been since 9:30am.
MBTA now reporting that 300 feet of third rail was damaged.
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is online now   Reply With Quote
Old 02-21-2018, 05:04 PM   #5100
bakgwailo
Senior Member
 
Join Date: Apr 2016
Posts: 687
Re: General MBTA Discussion Thread

Quote:
Originally Posted by datadyne007 View Post
MBTA now reporting that 300 feet of third rail was damaged.
Yeah looks like it derailed. I foresee an uber/lyft to get home today.
bakgwailo is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
A discussion regarding Chinatown commuter guy Boston Architecture & Urbanism 31 05-07-2016 05:30 AM
MBTA thread(s) cleanup Arlington Board Issues and Announcements 2 03-12-2015 05:46 PM
General RER-type service thread BostonUrbEx Transit and Infrastructure 26 11-22-2014 01:16 PM
General Real Estate/Rental Discussion BostonUrbEx Boston Architecture & Urbanism 5 04-16-2012 01:46 PM
aB Awards General Discussion statler 2008 Awards Nominations & Discussion 10 02-18-2009 05:40 AM


All times are GMT -5. The time now is 12:37 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.