Old 05-16-2019, 11:28 AM   #2961
whittle
Senior Member
 
Join Date: Feb 2017
Posts: 167
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Arlington View Post
Bike advocates are saying "make it wider"
Engineers are saying "this is what we can afford in-budget"
It seems to be engineers are also saying "make it wider". The federal guidelines, which I have yet to see a compelling argument should be ignored, call for a minimum of an 11ft wide path with a minimum 1ft buffer on each side before any fences or barriers.

https://www.fhwa.dot.gov/publication...5137/05137.pdf

http://imentaraddod.com/wp-content/u...12-bicycle.pdf
whittle is offline   Reply With Quote
Old 05-16-2019, 11:36 AM   #2962
Arlington
Senior Member
 
Join Date: Dec 2011
Location: West Medford, MA
Posts: 3,573
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by whittle View Post
It seems to be engineers are also saying "make it wider". The federal guidelines, which I have yet to see a compelling argument should be ignored, call for a minimum of an 11ft wide path with a minimum 1ft buffer on each side before any fences or barriers.

https://www.fhwa.dot.gov/publication...5137/05137.pdf

http://imentaraddod.com/wp-content/u...12-bicycle.pdf
How about we just leave empty support columns (and spend the money on GLX platform shelters and double-ended access) until we can afford it as wide as bike advocates want?

Right now, the station platforms are leaving blank space for future lengthening, and future "other end" entrances (Gilman*) rather than being built full-length. Maybe the bike bridge sections should be handled the same way: left blank; not blocked, but not built either.

A great case can be made that building it at its current width is somehow long-term-insufficient (and that'd be wasteful if our future selves have to demolish bridge sections and build them wider)

But there's a lot of future proofing on the station thsemselves that could (should?) be done in the GLX that isn't. It strikes me as a priority inversion that we're future-proofing the bike path first.

*Gilman should have two full-service entrances: School St (which it will) and Medford St (which it won't). Instead of extending the station all the way to an entrance from Medford St, they tie it into the nearby path, guaranteeing that the path will be choked with walkers and that thru bikes are gonna bellyache.
https://www.mass.gov/files/documents...ation_1218.pdf
The "complete" view of this station would have paid the extra to tie the entrance to big, capacious, multi-modal Medford St (better for every mode) not cheaped out on a path that will basically never be appropriate for thru-biking.

If I had to spend $ on being long-term bike friendly, it'd be (have been) on building Gilman's other entrance on Medford St. As it is, we're going to soon have another "victim of success moment and need to tear the path entry out and build it Medford St instead.
__________________
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn

Last edited by Arlington; 05-16-2019 at 11:53 AM.
Arlington is offline   Reply With Quote
Old 05-16-2019, 11:44 AM   #2963
Lrfox
Senior Member
 
Lrfox's Avatar
 
Join Date: Nov 2006
Posts: 2,406
Re: Green Line Extension to Medford & Union Sq

^That's why I'd vote to go forward even with the 10ft. path. Yes, it's not ideal. It's too small. But I don't think abandoning it entirely this go around is the answer. I hope the advocates and contractors can find a way to widen it a little.
Lrfox is offline   Reply With Quote
Old 05-16-2019, 11:49 AM   #2964
FK4
Senior Member
 
Join Date: Nov 2012
Posts: 2,220
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Arlington View Post
How about we just leave empty support columns (and spend the money on GLX platform shelters and double-ended access) until we can afford it as wide as bike advocates want?

Right now, the station platforms are leaving blank space for future lengthening, and future "other end" entrances (Gilman) rather than being built full-length. Maybe the bike bridge sections should be handled the same way: left blank; not blocked, but not built either.

A great case can be made that building it at its current width is somehow long-term-insufficient (and that'd be wasteful if our future selves have to demolish bridge sections and build them wider)

But there's a lot of future proofing on the station thsemselves that could (should?) be done in the GLX that isn't. It strikes me as a priority inversion that we're future-proofing the bike path first.
Much of the stretch, from the article, is along retaining walls. As I already said in my last post, this isn't something where room can be left for future construction, it's build now or never. Anyway, for the third time, it's all a useless debate until the price tags are known.
FK4 is offline   Reply With Quote
Old 05-16-2019, 12:01 PM   #2965
sm89
Senior Member
 
Join Date: Apr 2014
Location: Somerville
Posts: 817
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Arlington View Post
How about we just leave empty support columns (and spend the money on GLX platform shelters and double-ended access) until we can afford it as wide as bike advocates want?

Right now, the station platforms are leaving blank space for future lengthening, and future "other end" entrances (Gilman*) rather than being built full-length. Maybe the bike bridge sections should be handled the same way: left blank; not blocked, but not built either.

A great case can be made that building it at its current width is somehow long-term-insufficient (and that'd be wasteful if our future selves have to demolish bridge sections and build them wider)

But there's a lot of future proofing on the station thsemselves that could (should?) be done in the GLX that isn't. It strikes me as a priority inversion that we're future-proofing the bike path first.

*Gilman should have two full-service entrances: School St (which it will) and Medford St (which it won't). Instead of extending the station all the way to an entrance from Medford St, they tie it into the nearby path, guaranteeing that the path will be choked with walkers and that thru bikes are gonna bellyache.
https://www.mass.gov/files/documents...ation_1218.pdf
The "complete" view of this station would have paid the extra to tie the entrance to big, capacious, multi-modal Medford St (better for every mode) not cheaped out on a path that will basically never be appropriate for thru-biking.

If I had to spend $ on being long-term bike friendly, it'd be (have been) on building Gilman's other entrance on Medford St. As it is, we're going to soon have another "victim of success moment and need to tear the path entry out and build it Medford St instead.
The provisions for the station lengthening make no sense. I can't imagine how with future mobilization costs and construction impacts that it doesn't make sense to just build them a little longer now. We're talking like 40-60ft of additional pre-fab platform sections.

It's also not about a "bike path" and appeasing cycling advocates, it's that they are building station access paths that are narrower than current standards and won't work from day one. They are non-compliant in a sense. Like building a highway with 8ft lanes because it costs more to make it wider, meanwhile no one said 8ft lanes are acceptable or work. The path provides a major means of access for the stations and is meant to help mitigate the traffic impact of the GLX. The GLX cuts across Somerville streets, not alongside them, so a path is what connects the neighborhoods to the station.
sm89 is offline   Reply With Quote
Old 05-16-2019, 12:18 PM   #2966
Kinopio
Member
 
Join Date: Jul 2012
Posts: 92
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Rover View Post
If we're going to jack up the cost by an extra 500M in order to widen the path by 2 feet, then I think bikers should pay extra to help bear the burden of that cost. Perhaps a statewide bike registration fee similar to a car registration?
If you want to play the People Should Pay For What They Use game then drivers will owe non drivers billions of dollars. So that is fine with me. As a non driver I would be getting back thousands of my tax dollars.

Making the path more dangerous to save money is ridiculous. They would never do that with a highway. It is sickening that cars are treated better than people around here.
Kinopio is offline   Reply With Quote
Old 05-16-2019, 12:52 PM   #2967
ant8904
Senior Member
 
Join Date: Sep 2008
Posts: 569
Re: Green Line Extension to Medford & Union Sq

Keep your axe out of here Kinopio. The discussion here is spatial and budgetary constraints versus the call for increasing space. A discussion how the implications between the difference sizes, the dangers of scope creep, the constraints in the space it is being built in, and it's been a harping on Arlington's argument (which it seems he meant more of using calming techniques so people don't get run over if more space is not available rather than we shouldn't make it wider if we can). We don't need your us vs them worldview framing everything as a persecution.
ant8904 is offline   Reply With Quote
Old 05-16-2019, 01:36 PM   #2968
Rover
Senior Member
 
Join Date: Nov 2016
Posts: 659
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by sm89 View Post
It's also not about a "bike path" and appeasing cycling advocates, it's that they are building station access paths that are narrower than current standards and won't work from day one. They are non-compliant in a sense. Like building a highway with 8ft lanes because it costs more to make it wider, meanwhile no one said 8ft lanes are acceptable or work. The path provides a major means of access for the stations and is meant to help mitigate the traffic impact of the GLX. The GLX cuts across Somerville streets, not alongside them, so a path is what connects the neighborhoods to the station.
Great, then cancel the whole bike path thing and stick with the primary focus of the project, the Green Line extension. Works for me.

FK4 has a fair point about lets see the final cost estimate. I was using figures someone else had posted for the 500M, but really even if its half that I can't see justifying that much money to give bikers the ability to ride like lunatics down the path. Call it a pedestrian walkway then and ban bikes as long as its not adding to the total cost. This project has already had enough overruns.

Last edited by Rover; 05-16-2019 at 02:37 PM.
Rover is offline   Reply With Quote
Old 05-16-2019, 02:32 PM   #2969
tysmith95
Senior Member
 
Join Date: Feb 2016
Location: North Shore
Posts: 2,464
Re: Green Line Extension to Medford & Union Sq

It seems like there are police officers posted up on both sides of the Washington St road closure 24/7. This seems like a colossal waste of money, all that is needed is concrete barriers and signs.
tysmith95 is offline   Reply With Quote
Old 05-16-2019, 03:09 PM   #2970
Lrfox
Senior Member
 
Lrfox's Avatar
 
Join Date: Nov 2006
Posts: 2,406
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by tysmith95 View Post
It seems like there are police officers posted up on both sides of the Washington St road closure 24/7. This seems like a colossal waste of money, all that is needed is concrete barriers and signs.
They're everywhere. This morning there were 2 on the SCP at Cedar (usually it's 1) and 1 more about 100 feet away at Morrison at Cedar. Some of the key closures and bridge removals are forcing a lot of traffic onto streets that aren't equipped to handle that volume. So I appreciate having them there, especially when I'm on foot or on a bike. The cost has got to be wild though.
Lrfox is offline   Reply With Quote
Old 05-16-2019, 04:07 PM   #2971
Ruairi
Senior Member
 
Join Date: Jun 2014
Posts: 247
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Lrfox View Post
They're everywhere. This morning there were 2 on the SCP at Cedar (usually it's 1) and 1 more about 100 feet away at Morrison at Cedar. Some of the key closures and bridge removals are forcing a lot of traffic onto streets that aren't equipped to handle that volume. So I appreciate having them there, especially when I'm on foot or on a bike. The cost has got to be wild though.
it's funny tho, they are sitting both sides of the washington st underpass but they aren't on the side streets as much as they were. It's frustrating to see them on Washington st where nothing can really happen and then see cars do crazy things on tufts, Cross, Alston and the McGrath on ramp. I've seen plenty of cars come down Alston and then go the wrong way down the McGrath on ramp to get back on to washington, all the while there's police sat in their car around the corner where no cars are going.
Just venting. The place is a mess but hopefully it will be worth it.
While I'm venting, I see they plan to take down the McCarthy overpass in 2026. They are estimating that this project will take four years... FOUR YEARS???
right... done now.
Ruairi is offline   Reply With Quote
Old 05-16-2019, 07:25 PM   #2972
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,661
Re: Green Line Extension to Medford & Union Sq

The Somerville Community Path as presently designed is deeply unwelcoming to walkers as it's deep in the GLX/CR trench. It's essentially just a cycle track for getting around Somerville. People wanting to go for a stroll around Somerville should just stay at the surface on the sidewalk.
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Old 05-16-2019, 08:25 PM   #2973
Brad Plaid
Senior Member
 
Join Date: Jan 2013
Posts: 895
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by tysmith95 View Post
It seems like there are police officers posted up on both sides of the Washington St road closure 24/7. This seems like a colossal waste of money, all that is needed is concrete barriers and signs.
Standard police union shakedown policy all over the state, traffic details are a lucrative cash grab. MA is the only state requiring, under threat of arrest, an officer at even the most inconsequential of road work sites where orange cones would work just fine. Been this way for years and of course there is no spine to be found at the state house to change this, pols take their orders from the union. So much corruption.
Brad Plaid is offline   Reply With Quote
Old 05-16-2019, 10:10 PM   #2974
Lrfox
Senior Member
 
Lrfox's Avatar
 
Join Date: Nov 2006
Posts: 2,406
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by datadyne007 View Post
The Somerville Community Path as presently designed is deeply unwelcoming to walkers as it's deep in the GLX/CR trench. It's essentially just a cycle track for getting around Somerville. People wanting to go for a stroll around Somerville should just stay at the surface on the sidewalk.
Thatís what I anticipate will happen. Part of the draw of the current path for walkers/leisure users is whatís around it. Green space, parks/playgrounds, trees, dog parks, benches, community gardens, etc. itís far more appealing than the sidewalks on parallel streets. The extension has none of that. Nearby streets are going to be more inviting for anyone walking (especially for leisure).
Lrfox is offline   Reply With Quote
Old 05-16-2019, 10:32 PM   #2975
FK4
Senior Member
 
Join Date: Nov 2012
Posts: 2,220
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by Brad Plaid View Post
Standard police union shakedown policy all over the state, traffic details are a lucrative cash grab. MA is the only state requiring, under threat of arrest, an officer at even the most inconsequential of road work sites where orange cones would work just fine. Been this way for years and of course there is no spine to be found at the state house to change this, pols take their orders from the union. So much corruption.
Actually, a measure did pass (I think it was a voter-initiated ballot item, since the State govt would never, ever, ever allow something this rational yet detrimental to the cops' pockets to pass) a few years ago, that allowed civilian flaggers. What happened was many local municipalities immediately passed local measures preventing civilian flaggers. But they do exist in MA now.
FK4 is offline   Reply With Quote
Old 05-17-2019, 06:58 AM   #2976
tysmith95
Senior Member
 
Join Date: Feb 2016
Location: North Shore
Posts: 2,464
Re: Green Line Extension to Medford & Union Sq

Quote:
Originally Posted by FK4 View Post
Actually, a measure did pass (I think it was a voter-initiated ballot item, since the State govt would never, ever, ever allow something this rational yet detrimental to the cops' pockets to pass) a few years ago, that allowed civilian flaggers. What happened was many local municipalities immediately passed local measures preventing civilian flaggers. But they do exist in MA now.
My question is, on a road that will be closed for 6 months to a year, are flaggers even necessary? Why can't you just put up concrete blocks and fencing?
tysmith95 is offline   Reply With Quote
Old 05-17-2019, 08:00 AM   #2977
FK4
Senior Member
 
Join Date: Nov 2012
Posts: 2,220
Re: Green Line Extension to Medford & Union Sq

I just read two update stories from last year - ten years after the law was passed. It was weak, and barely effected state police anyway. Google it and you can find the articles. I would also guess that Somerville voted it not allow the flaggers. Itís all very disheartening... the law enforcement unions in this state are a cancer, for sure.
FK4 is offline   Reply With Quote
Old 05-17-2019, 11:13 AM   #2978
ceo
Senior Member
 
Join Date: May 2009
Posts: 137
Re: Green Line Extension to Medford & Union Sq

I go through Morrison and Cedar 2-3 times a day, and when there isn't an officer directing traffic it's a complete and utter shitshow. It also is when the officer is just standing there doing nothing instead of directing traffic.
And yes, the requiring police officers as flaggers thing is completely ludicrous. It's blatant featherbedding like this that turns otherwise sensible people against unions.
ceo is offline   Reply With Quote
Old 05-17-2019, 11:33 AM   #2979
Arlington
Senior Member
 
Join Date: Dec 2011
Location: West Medford, MA
Posts: 3,573
Re: Green Line Extension to Medford & Union Sq

In re cops in streets: Baltimore used to have an officer at a grid of about 9 downtown intersections at rush hours (about 3block x 3blocks at the very center).

Studies showed that traffic moved best when the officer was there and simply mirrored/enforced whatever the traffic lights were indicating.

(more effective than the lights, alone, since it got compliance, but also not worth the officer's thinking they could outsmart the engineers by overriding the signals, where they'd probably guess wrong and definitely caused confusion)
__________________
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn
Arlington is offline   Reply With Quote
Old 05-17-2019, 12:59 PM   #2980
Jahvon09
Senior Member
 
Jahvon09's Avatar
 
Join Date: Oct 2011
Posts: 1,406
Re: Green Line Extension to Medford & Union Sq

I've read somewhere that the Type 9s will be moved over to THAT line when it is completed. Is there any truth to this story?

I guess to make the new line look 'glamorous & all that'.
Jahvon09 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Blue Line extension to Lynn PaulC Transit and Infrastructure 263 12-05-2018 11:51 AM
"We want a Blue Line extension to Lynn-Salem" BostonUrbEx Boston Architecture/Urbanism Related Events 0 12-05-2012 11:20 AM
Green Line extension Newton to Needham choo Transit and Infrastructure 12 10-10-2012 10:07 AM
Mock Green Line Extension Groundbreaking! BostonUrbEx Boston Architecture/Urbanism Related Events 12 10-21-2011 03:15 PM
Fitchburg Line Extension pharmerdave Transit and Infrastructure 61 12-20-2010 04:43 PM


All times are GMT -5. The time now is 04:21 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.