Steel for parking decks -03 and -02 is moving quickly (filling at the same time); probably a week or two to see -01 and then street level steel.

The core is almost complete.



SUPPLEMENTAL: Shadows obscured the site very well last night; steel is present above street level

Last edited by ivyhedge; 02-28-2018 at 08:40 AM.
ivyhedge is offline   Reply With Quote
Old 02-28-2018, 09:50 PM   #42
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 323
Re: Parcel JK | NorthPoint | Cambridge

This is the state of the north end of Philips' building on Divco's Lot JK:



This is from a similar perspective, cropped:

ivyhedge is offline   Reply With Quote
Old 03-11-2018, 08:44 AM   #43
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,691
Re: Parcel JK | NorthPoint | Cambridge

Under construction??





BeeLine is offline   Reply With Quote
Old 03-15-2018, 05:23 PM   #44
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 323
Re: Parcel JK | NorthPoint | Cambridge

Lot JK cross beam steel is at Level 02, relative to street, or Level 05, relative to basement pour (and lower three levels assembly from a month ago):

ivyhedge is offline   Reply With Quote
Old 03-30-2018, 05:07 AM   #45
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,691
Re: Parcel JK | NorthPoint | Cambridge







BeeLine is offline   Reply With Quote
Old 04-02-2018, 09:23 PM   #46
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 323
Re: Parcel JK | NorthPoint | Cambridge

*I experienced oddness with "L" vs "H" bbcode size designators for this posting. Mods, if "L" didn't append, please feel free to scale (and apologies).

After the bathtub pour, concrete began in late January, with the first steel connecting the parking decks a few days hence.

As of 30 March, steel made it beyond the entrance level on the north portion of the building (so, plating is now appearing between levels -03 and 2):



Late Friday, another crane arrived to add weight to the north crane:



As of 2 April, steel (and plating) has made it to level 3 on the north side, and commensurately higher around the site. There was a reasonably lengthy concrete pour on the south side on Saturday (as well as a lot of steel work). I'll try to update the images tomorrow.
ivyhedge is offline   Reply With Quote
Old 04-05-2018, 04:54 PM   #47
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,691
Re: Parcel JK | NorthPoint | Cambridge


Last edited by vanshnookenraggen; 04-06-2018 at 01:38 PM. Reason: Please resize pictures before posting.
BeeLine is offline   Reply With Quote
Old 04-11-2018, 09:32 PM   #48
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,691
Re: Parcel JK | NorthPoint | Cambridge









BeeLine is offline   Reply With Quote
Old 04-12-2018, 06:43 PM   #49
Boston02124
Senior Member
 
Boston02124's Avatar
 
Join Date: Sep 2007
Location: Dorchester/Boston
Posts: 5,872
Re: Parcel JK | NorthPoint | Cambridge

Nice pics as always ^ from the train >
Boston02124 is offline   Reply With Quote
Old 05-17-2018, 09:45 PM   #50
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 323
Re: Parcel JK | NorthPoint | Cambridge

For those of you interested in tracking the progress of Cambridge Crossing's "Lot JK", I have included shots since my last update: apologies for the delay.


- 29 March / North side steel at ground level 2; plating at level 2; lobby beginning; south side at [null]; no concrete beyond bathtub.


- 3 April / North side steel at lvl 3; plating at lvl 2; lobby continuing; south side at [null]; no concrete.


- 9 April / North steel at lvl 3; plating at lvl 2; south wrapping; no concrete (I normally shoot from "Sierra", the building at 9 o'clock, or left side middle; this shot from Gilmore Bridge).


- 24 April / max steel at lvl 5; plating at lvl 4; concrete pour north half of lvl 1 (which remained flooded for 7+ days) and began bridging gap bt future sidewalk and building (over old bathtub wall, north side).


- 25 April / same characteristics as above save visible flooding on lvl 1 after storms; also, bottom of image shows area (previously under a drumlin) to receive "Storm Trap" storm mitigation boxes...


- 1 May / max steel at lvl 6; plating at lvl 5; concrete still only on lvl 1 north.


- 1 May / First night they lit anything beyond lvl 1 north concrete mess.


- 2 May / extended steel and plating quickly today - more lvl 6 steel and plating rose to lvl 6.


- 9 May / max steel at lvl 8; plating at lvl 7; concrete poured to lobby area.


- 17 May / max steel at lvl 9+; plating at lvl 9; fireproofing on lvl 1 north; concrete on parts of lvls 1, 2, and 3. Also visible is 4-5 segments of increasing height Storm Trap concrete boxes (bottom).
ivyhedge is offline   Reply With Quote
Old 05-17-2018, 10:48 PM   #51
datadyne007
Senior Member
 
datadyne007's Avatar
 
Join Date: Sep 2010
Location: Everett, MA
Posts: 8,622
Re: Parcel JK | NorthPoint | Cambridge

Fantastic photos and descriptions. Thanks a lot for keeping that construction log!
__________________
Commuter Rail. Reimagined. Read the report: regionalrail.net
Electrification + High Platforms + Infrastructure + Frequent Service + Free Transfers = #REGIONALRAIL
datadyne007 is offline   Reply With Quote
Old 06-10-2018, 05:20 PM   #52
stevebikes
Senior Member
 
Join Date: May 2013
Posts: 214
Re: Parcel JK | NorthPoint | Cambridge

I think these all go in this thread:











































stevebikes is offline   Reply With Quote
Old 06-10-2018, 09:29 PM   #53
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,691
Re: Parcel JK | NorthPoint | Cambridge

Some more from this morning.


















Last edited by BeeLine; 06-10-2018 at 09:40 PM.
BeeLine is offline   Reply With Quote
Old 06-29-2018, 09:01 PM   #54
BeeLine
Senior Member
 
Join Date: Jan 2012
Posts: 8,691
Re: Parcel JK | NorthPoint | Cambridge

















BeeLine is offline   Reply With Quote
Old 07-10-2018, 12:26 PM   #55
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 323
Re: Parcel JK | NorthPoint | Cambridge

Check it out: claddage!

ivyhedge is offline   Reply With Quote
Old 07-30-2018, 07:47 PM   #56
kz1000ps
Senior Member
 
kz1000ps's Avatar
 
Join Date: May 2006
Location: man hat tan
Posts: 7,540
Re: Parcel JK | NorthPoint | Cambridge

__________________
Politicians, ugly buildings and whores all get respectable if they last long enough.
kz1000ps is offline   Reply With Quote
Old 07-31-2018, 12:10 AM   #57
stick n move
Senior Member
 
Join Date: Oct 2009
Location: Dorchester
Posts: 5,144
Re: Parcel JK | NorthPoint | Cambridge

I smell a seaport pt 2. coming with wonderful public spaces, plentiful retail, and good urban scale, but with great transit.
stick n move is online now   Reply With Quote
Old 07-31-2018, 09:21 AM   #58
SeamusMcFly
Senior Member
 
Join Date: Apr 2008
Location: Brockton
Posts: 1,971
Re: Parcel JK | NorthPoint | Cambridge

Quote:
Originally Posted by stick n move View Post
I smell a seaport pt 2. coming with wonderful public spaces, plentiful retail, and good urban scale, but with great transit.
Not as much density, and I don't think it will be anywhere near the seaports retail.
It'll be nice, and better than the original plan. But overall it'll be underwhelming, and a missed opportunity. Particularly with the transit coverage.
__________________
Quote:
Originally Posted by TheRifleman View Post
You can have fun anywhere---Fun shouldn't cost the taxpayers a dime.
SeamusMcFly is offline   Reply With Quote
Old 07-31-2018, 09:45 AM   #59
Suffolk 83
Senior Member
 
Join Date: Nov 2007
Location: South End
Posts: 2,053
Re: Parcel JK | NorthPoint | Cambridge

I think this whole area is huge missed opportunity. Its going to be the West End Pt. 2. The seaport, despite its whiteness will be better
Suffolk 83 is offline   Reply With Quote
Old 07-31-2018, 09:03 PM   #60
ivyhedge
Senior Member
 
Join Date: Jul 2013
Location: CX
Posts: 323
Re: Parcel JK | NorthPoint | Cambridge

Quote:
Originally Posted by Suffolk 83 View Post
I think this whole area is huge missed opportunity. Its going to be the West End Pt. 2. The seaport, despite its whiteness will be better
"We don't want this to be Seaport II".

We heard that at DivCo meetings...
ivyhedge is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston awood91 Development Projects 1157 03-08-2019 07:32 PM
Mission Hill Parcel 25 | Tremont St @ Roxbury Crossing quadratdackel Development Projects 137 03-06-2019 03:38 PM
Parcel EF | Cambridge Crossing | Cambridge FitchburgLine Development Projects 11 11-05-2018 09:44 AM
Parcel I | Cambridge Crossing | East Cambridge datadyne007 Development Projects 50 10-19-2018 03:46 PM
West Cambridge (Alewife, Acorn Park, Cambridge Park, Fresh Pond) BostonUrbEx Development Projects 244 08-24-2018 08:43 AM


All times are GMT -5. The time now is 11:03 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.