![]() |
|
|||||||
| Transit and Infrastructure All things T or civilly engineered within Boston Metro. |
![]() |
|
|
Thread Tools | Search this Thread |
|
|
#161 |
|
Senior Member
Join Date: Jun 2010
Posts: 192
|
With all this talk (admittedly, almost a month ago) about Plymouth, I wanted to look a bit closer at the figures. Given the vast size of Plymouth's municipal borders, I decided to look up the neighborhood population density figures. Plymouth Center has 1900 people/sq.mile and North Plymouth has 1000 (the rest of Plymouth didn't have figures on wikipedia for density). Given that the bulk of the population is in that area (roughly, that 3a corridor), I think the Lexington comparison is more apt than many were thinking.
|
|
|
|
|
|
#162 |
|
Senior Member
Join Date: Jan 2012
Posts: 988
|
Tangentially related to the Southeast Expressway and Old Colony Lines - where do we stand on the South Station expansion project anyway? I haven't heard anything about it particularly recently.
|
|
|
|
|
|
#163 | |
|
Senior Member
Join Date: Mar 2010
Location: Boston / North Shore
Posts: 3,536
|
Quote:
|
|
|
|
|
|
|
#164 |
|
Senior Member
Join Date: Sep 2008
Posts: 271
|
To also give an explaination as well as a place to sign up. I believe a few post back, there was some news about it. They lost time trying to get federal funding. And now that so much time has passed, the post office seems to be changing/has changed their mind about closing the facility down and opening the space to the South Station. So yeah....
|
|
|
|
|
|
#165 | |
|
Senior Member
Join Date: Aug 2006
Location: Lexington
Posts: 2,819
|
Quote:
That means that outside of the preliminary planning money which has already been committed and allocated to be spent on consultants -- Nothing is likely to happen for at least 3 years Note that there is no menton of either the GLX or the South Coast CR either The major transit money is for Governmnent Center Station rebuild ($100M + and new buses |
|
|
|
|
|
|
#166 | |
|
Junior Member
Join Date: Sep 2012
Location: Worcester, MA
Posts: 27
|
Quote:
__________________
Shadows no longer exist. They will henceforth be known as shade. |
|
|
|
|
|
|
#167 |
|
Senior Member
Join Date: May 2006
Posts: 164
|
I was lucky enough today that vehicles were broken down in the zipper lane both on my commute into Boston and out of boston today. Its like hitting the lottery, I save about 10 minutes on way in and 20 on way out of boston when there is a breakdown in zipper lane. I guess I should play the lottery tonight.
Those people who use the on/off ramps in quincy to try to get ahead really slow traffic down too, wish there was a way to shame them without getting accused of road rage.. its really like somebody cutting in front of you in line. Bring on the tolls I will pay |
|
|
|
|
|
#168 | |
|
Senior Member
Join Date: Jun 2010
Posts: 192
|
Quote:
|
|
|
|
|
|
|
#169 | |
|
Senior Member
Join Date: Nov 2010
Location: Brighton
Posts: 480
|
Quote:
Talk about moronic. I've been saying since I moved to Boston that probably 75 percent of the traffic in the city could be alleviated by smart light synchronization. For freeways the same could be said of rationalizing the absurd interchange designs with simple fixes like extended on/off ramps for more merging space. |
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| General Thoughts/State of Southeast Expressway | mass88 | Transit and Infrastructure | 101 | 01-29-2012 03:46 PM |
| The Northeast Expressway, Revere Beach Connector, and geographically related projects | BostonUrbEx | Transit and Infrastructure | 9 | 12-02-2011 03:37 PM |
| new HOV lane on 93 | PaulC | Transit and Infrastructure | 28 | 03-16-2011 11:17 PM |
| SE Expressway | mass88 | Transit and Infrastructure | 9 | 09-20-2010 11:53 AM |
| Bus/ bike lane from Waltham to 495 | GW2500 | Transit and Infrastructure | 5 | 06-06-2010 10:22 AM |