Quote:
Originally Posted by Lrfox View Post
I like it. I don't love it. It's "innovative," but doesn't quite go overboard. Given the contrast that the brick provides and the visibility of the channel-front location, I would have love to see some titanium cladding a-la Gehry, but this is nice and the glass works.
Lrfox -- Titanium is so yesterday -- we've got Zinc and Silicon Carbide
whighlander is offline   Reply With Quote
Old 08-01-2016, 12:44 PM   #382
whighlander
Senior Member
 
Join Date: Aug 2006
Location: Lexington
Posts: 6,519
Re: General Electric HQ | Necco St.| Fort Point

Quote:
Originally Posted by Equilibria View Post
Please note: The official address for the project is 244-284 A Street, not Necco St. as I and others had guessed. Can the thread title reflect this?

EDIT: Thanks!
Equilibria -- that address is strange -- heading down A from Summer its past the Parking Garage other side of Necco St. from the original Brick Necco buildings -- so is there going to be a GE guard shack on A just past where Necco joins A?
https://goo.gl/maps/K1VusUrYvDB2
whighlander is offline   Reply With Quote
Old 08-01-2016, 12:46 PM   #383
whighlander
Senior Member
 
Join Date: Aug 2006
Location: Lexington
Posts: 6,519
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by Bubbybu View Post
the front massing reminds me of the back of an old cathode ray TV set
Bubbybu -- Which Front?
whighlander is offline   Reply With Quote
Old 08-01-2016, 01:02 PM   #384
Bubbybu
Senior Member
 
Join Date: Sep 2008
Location: San Francisco, CA
Posts: 629
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by whighlander View Post
Bubbybu -- Which Front?
facing the water
Bubbybu is offline   Reply With Quote
Old 08-01-2016, 01:16 PM   #385
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 2,999
Re: General Electric HQ | Necco St.| Fort Point

Quote:
Originally Posted by whighlander View Post
Equilibria -- that address is strange -- heading down A from Summer its past the Parking Garage other side of Necco St. from the original Brick Necco buildings -- so is there going to be a GE guard shack on A just past where Necco joins A?
https://goo.gl/maps/K1VusUrYvDB2
I doubt it's a guard shack, probably just a more easy-to-find address on a bigger road. Also, I wonder if GE has had thoughts about acquiring adjacent sites to build a bigger campus over time. If so, those buildings would actually front A, allowing the whole thing to share a single conceptual location.

It's also conceivably possible that GE has designs on renaming Necco St... that would be another reason to keep the address on A.
Equilibria is offline   Reply With Quote
Old 08-01-2016, 01:36 PM   #386
odurandina
Senior Member
 
odurandina's Avatar
 
Join Date: Dec 2015
Posts: 3,690
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by citylover94 View Post
+1

I agree. This works for me even if there is a lot going on. I also really like materials they are planning on using for the cladding.
Before it's over, maybe a couple of minor changes, otherwise it's wicked cool.
odurandina is offline   Reply With Quote
Old 08-01-2016, 01:48 PM   #387
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 2,999
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by odurandina View Post
Before it's over, maybe a couple of minor changes, otherwise it's wicked cool.
I'm not so sure about even minor changes. They want to start construction within six months.
Equilibria is offline   Reply With Quote
Old 08-01-2016, 01:49 PM   #388
xec
Senior Member
 
Join Date: May 2006
Posts: 346
Re: General Electric HQ | 244-284 A Street | Fort Point

This



looks like it was inspired by the BU Life Sciences building



combined with the crown of 888 Boylston.



A combination of two very pedestrian buldings. I expected more from GE's headquarters.
xec is offline   Reply With Quote
Old 08-01-2016, 02:11 PM   #389
ParkerChris
Senior Member
 
Join Date: Sep 2011
Posts: 277
Re: General Electric HQ | 244-284 A Street | Fort Point

You're missing the best angels



ParkerChris is offline   Reply With Quote
Old 08-01-2016, 02:25 PM   #390
bigboybuilder
Member
 
Join Date: Jan 2007
Location: Boston
Posts: 34
Re: General Electric HQ | 244-284 A Street | Fort Point

That isn't even close to Mars!

From 3.5.4 Signage
The New Building is envisioned to have a large GE Monogram on its roof which will be approximately 30 feet by 30 feet in size and will sit on top of the mechanical penthouse of the New Building. GE’s Monogram, the company logo enduring over a century, is intended to show the company’s presence in Boston. It will be visible to Downtown Boston and the Financial District


There were earlier renders that has the solar veil all the way to almost the ground on the south elevation
bigboybuilder is offline   Reply With Quote
Old 08-01-2016, 02:50 PM   #391
whighlander
Senior Member
 
Join Date: Aug 2006
Location: Lexington
Posts: 6,519
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by Equilibria View Post
I'm not so sure about even minor changes. They want to start construction within six months.
Equilibria -- They want to start work on the brick buildings in the next 2 to 3 months meanwhile the full MEPA process will go forward on the New Building
[my formatting]
Quote:
Anticipated Project Schedule
The Project is intended to be completed in two phases.

The first phase of construction includes preservation and rehabilitation of the existing Brick Buildings to commence in the 4th Quarter of 2016.
The anticipated occupancy of the Brick Buildings is the 1st Quarter of 2018.

The second phase of construction will begin in 1st Quarter of 2017 with occupancy anticipated in the 3rd Quarter of 2018.
By the way other than on the front cover
Quote:
244-284 A STREET
BOSTON, MA 02210
in all 860+ pages [which I briefly scanned -- some parts very briefly] I could find no mention of an A street address
everything was Necco Court or Street

It looks that the Primary entrance is from the Harbor Walk or GE Plaza -- neither has much to do with A Street
whighlander is offline   Reply With Quote
Old 08-01-2016, 03:09 PM   #392
jass
Senior Member
 
Join Date: Jul 2006
Posts: 4,029
Re: General Electric HQ | 244-284 A Street | Fort Point

I expected larger.

I like the natural vegetation at the water.

Looks like rowboat service to airport will be available
jass is offline   Reply With Quote
Old 08-01-2016, 03:09 PM   #393
JumboBuc
Senior Member
 
Join Date: Jun 2013
Location: The Fenway
Posts: 1,633
Re: General Electric HQ | 244-284 A Street | Fort Point

I hope I don't induce a whighlander rant here, but I was curious about what sort of solar photovoltaic capacity would be built into the solar veil and checked the BRA filing:
Quote:
The on-site Solar Photovoltaic (“PV”) System for the New Building will generate clean energy for building consumption/supply back to the grid. The PV system is forecast to reduce overall utility loads by an estimated 157 kwH and associated GHG emissions.
"[R]educe overall utility loads by an estimated 157 kwH" doesn't make any sense. People ALWAYS get the terminology / units mixed up on this sort of thing, but I'm surprised to see such a mistake in a filing such as this. A 157 kW (not "kwH") solar array would be roughly 10 - 11k sf, so that sounds about right. This could be expected to produce about 173 mWh of energy annually at that location - a far from trivial amount.
JumboBuc is offline   Reply With Quote
Old 08-01-2016, 03:15 PM   #394
xec
Senior Member
 
Join Date: May 2006
Posts: 346
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by ParkerChris View Post
You're missing the best angels

I'll grant you that this side is a vast improvement over the one I posted, but to my eyes the proportions seem awkward. It just looks top-heavy and unbalanced.
xec is offline   Reply With Quote
Old 08-01-2016, 03:20 PM   #395
cjbski
Senior Member
 
Join Date: Jun 2015
Posts: 627
Re: General Electric HQ | 244-284 A Street | Fort Point

This building is spectacular. They've done an outstanding job here. I love the setup and I love how big the logo is, honestly.
cjbski is offline   Reply With Quote
Old 08-01-2016, 03:21 PM   #396
Equilibria
Senior Member
 
Equilibria's Avatar
 
Join Date: May 2007
Posts: 2,999
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by xec View Post
I'll grant you that this side is a vast improvement over the one I posted, but to my eyes the proportions seem awkward. It just looks top-heavy and unbalanced.
It's the fact that it's cantilevered that keeps this from being just another PWC glass box. Well, that and the wooden fins.
Equilibria is offline   Reply With Quote
Old 08-01-2016, 04:01 PM   #397
type001
Senior Member
 
type001's Avatar
 
Join Date: Jun 2006
Location: Winchester
Posts: 1,435
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by Bubbybu View Post
holy shit, they totally nailed it...it's both perfectly contextual and daring
My thought exactly. This is unbelievably good!
type001 is offline   Reply With Quote
Old 08-01-2016, 04:13 PM   #398
stick n move
Senior Member
 
Join Date: Oct 2009
Location: Dorchester
Posts: 4,387
Re: General Electric HQ | 244-284 A Street | Fort Point

Quote:
Originally Posted by xec View Post
I'll grant you that this side is a vast improvement over the one I posted, but to my eyes the proportions seem awkward. It just looks top-heavy and unbalanced.
This will be filled in around in the coming years so it will blend in more eventually while still being visually interesting.


On another note are there plans to connect this new harborwalk to the existing piece in front of the childrens museum by going under summer st and congress? This along with a ped bridge over the channel to south station will be huge for the area.

In my head I see this becoming a great destination especially once the post office is gone. This looks great, the South Station expansion along with opening of dot ave will add more retail across the channel. I see some liberty wharf types being built here and this becoming a great inlet to visit on a boat and park and hit a restaurant/bar in the future. Since it it directly connected to the harbor you could take a boat from the south shore head into the channel stop and grab some food maybe take in a public concert/show, and then take off and head back home or even to a different part of the city like the casino. The harbor walk will most definitely extend down both sides of fort point in the future and this will be an amazing area.
stick n move is offline   Reply With Quote
Old 08-01-2016, 04:47 PM   #399
atlantaden
Senior Member
 
Join Date: May 2006
Location: atlanta
Posts: 1,781
Re: General Electric HQ | 244-284 A Street | Fort Point

Bravo, GE, it's a spectacular building and bravo Commonwealth of Massachusetts and the City of Boston for the tax incentives (investment) that brought GE here (and more importantly the brain power of Boston/Cambridge and the metro area), an investment which the city and state will recoop in many ways, not just monetary. Looking forward to seeing the completed complex and visiting the GE museum, an attraction all it's own.
atlantaden is offline   Reply With Quote
Old 08-01-2016, 06:45 PM   #400
Boston02124
Senior Member
 
Boston02124's Avatar
 
Join Date: Sep 2007
Location: Dorchester/Boston
Posts: 5,772
Re: General Electric HQ | Necco St.| Fort Point

Quote:
Originally Posted by Boston02124 View Post
Looking at the new renderings can't post a pic but I'll say it's different
well was I right ?
Boston02124 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Education First (Phase III) | 10 North Point Blvd | Cambridge goldenretrievers Development Projects 75 Today 10:05 AM
AVA North Point II | Archtone phase II | East Cambridge BeeLine Development Projects 113 09-02-2018 07:14 PM
10 Farnsworth Street | Fort Point goldenretrievers Development Projects 159 06-27-2018 12:07 PM
315 on A | 315 A Street | Fort Point Boston02124 Development Projects 494 04-30-2015 12:15 AM
Boston Tea Party Museum | 306 Congress Street | Fort Point BostonUrbEx Development Projects 120 12-27-2014 11:53 AM


All times are GMT -5. The time now is 01:20 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.