View Single Post
Old 02-28-2018, 04:02 PM   #17
Joel N. Weber II
Senior Member
 
Join Date: Aug 2015
Posts: 572
Re: batteries

Quote:
Originally Posted by Arlington View Post
1) Organization before Signals/Electronics before Concrete.
Overhead wires where we don't have them that requires redoing bridges is concrete, right? (And even for wiring up a yard where there's no bridge work, don't you need concrete footings for catenary poles?)

And we're supposed to do concrete after electronics, right?

And sticking batteries into the trucks next to the traction motors is electronics which we're supposed to do before concrete, right?
Joel N. Weber II is offline   Reply With Quote