Re: Conley Terminal Dedicated Freight Corridor

Quote:
Originally Posted by falcon42 View Post
Yes lights have already been installed, just not active yet. Begs the question of whether this is really going to improve traffic on Summer Street. Traffic backs up onto the bridge at the PM rush hour and now you are putting a 2nd light in. Should be interesting.
It's not likely to be red very often/at all at PM rush, the only reason it would be turning red at that hour is a Fedex truck or two coming up from South Boston back into their facility.

There's no trucks arriving then (and that would only turn the NB side of Summer St red).