archBOSTON.org

Go Back   archBOSTON.org > Search Forums

Showing results 1 to 25 of 500
Search took 0.06 seconds.
Search: Posts Made By: Arlington
Forum: Transit and Infrastructure 09-12-2018, 01:38 PM
Replies: 581
Views: 92,930
Posted By Arlington
Re: MBTA Bus & BRT

Route 2 needs a Bus/HOV lane from Rt 60 (Pleasant St) inward
Forum: Transit and Infrastructure 09-12-2018, 10:59 AM
Replies: 581
Views: 92,930
Posted By Arlington
Re: MBTA Bus & BRT

Well, sure. I'd also advise to Cure Cancer and Oppose Evil.

But in the area of useful advice, I can only think of send the 79 and 350 up Broadway to Davis (a faster trip, and 1 stop closer to...
Forum: Transit and Infrastructure 09-12-2018, 08:35 AM
Replies: 581
Views: 92,930
Posted By Arlington
Re: MBTA Bus & BRT

Arlington has its first look at its pilot BRT project for Morning Mass Ave Inbound:
https://arlington.novusagenda.com/agendapublic/AttachmentViewer.ashx?AttachmentID=5619&ItemID=6233

The goal is...
Forum: Transit and Infrastructure 09-11-2018, 12:33 PM
Replies: 51
Views: 6,214
Posted By Arlington
Re: Green Line Type 10 Procurement

I'm glad to see that you think the Type 10s are in good hands.
Forum: Transit and Infrastructure 09-06-2018, 10:29 AM
Replies: 2,869
Views: 460,708
Posted By Arlington
Re: Green Line Extension to Medford & Union Sq

Take a ride in the Lowell Line from NS to W.Med.Sq.--you will see real construction progress all along the way: mostly prepping the now tree-bare emabankments and the grading and ballasting of the...
Forum: Transit and Infrastructure 08-21-2018, 05:26 PM
Replies: 374
Views: 62,217
Posted By Arlington
Re: Biking the Boston 'Burbs (Trails, MDC, & Towns beyond Hubway area)

Medford continues to click the parts into place for the "missing link" Clippership Connector, which will connect the Medford Square Mystic riverfront (and other Somerville-Medford-Winchester trails)...
Forum: Transit and Infrastructure 08-21-2018, 01:52 PM
Replies: 374
Views: 62,217
Posted By Arlington
Re: Biking the Boston 'Burbs (Trails, MDC, & Towns beyond Hubway area)

2018 list of $4m going to 70+trails
https://www.mass.gov/guides/recreational-trails-program
Forum: Transit and Infrastructure 08-13-2018, 09:08 AM
Replies: 5,348
Views: 680,284
Posted By Arlington
Re: General MBTA Discussion Thread

Maybe this time Alewife garage will get the levels 6&7 its original columns, lobby, and elevators were built for.
Forum: Greater New England 08-12-2018, 04:35 PM
Replies: 2
Views: 335
Posted By Arlington
Re: Providence Transit

I started a Providence RIPTA thread (http://www.archboston.org/community/showthread.php?t=4265) in 2012 for similar projects, can we keep it all in one thread?
Forum: Development Projects 08-06-2018, 07:34 PM
Replies: 3,098
Views: 733,715
Posted By Arlington
Re: The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

That seems to include the CR<-->GL/OL connector, too. <grateful/>
Forum: Transit and Infrastructure 08-06-2018, 11:16 AM
Replies: 5,348
Views: 680,284
Posted By Arlington
Re: General MBTA Discussion Thread

I love this, or one that runs on Congress St NS-Haymarket-Fidi-SS in a reservation. We could be doing so much awesome with buses in the core, yet we content ourselves to have Everett take the lead.
Forum: Development Projects 08-03-2018, 11:06 PM
Replies: 3,098
Views: 733,715
Posted By Arlington
Forum: Development Projects 08-03-2018, 10:57 AM
Replies: 3,098
Views: 733,715
Posted By Arlington
Re: The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

Maybe start a thread on modern sacred spaces? (what's the address of the nursing home?)
Forum: Transit and Infrastructure 07-31-2018, 01:57 PM
Replies: 3,256
Views: 408,059
Posted By Arlington
Re: Biking in Boston

Who controls the Grand Junction Path in Cambridge/Kendall between Broadway and Main? Is that MIT, Cambridge or a PPP?

I ask because the sprinklers come on at 2pm, which can't be right...chasing...
Forum: Transit and Infrastructure 07-30-2018, 06:25 AM
Replies: 2,869
Views: 460,708
Posted By Arlington
Re: Green Line Extension to Medford & Union Sq

^ which is why they saw the need for fare gates and 4-car platforms (before going with POP fare system to save on station costs)
Forum: Transit and Infrastructure 07-27-2018, 02:46 PM
Replies: 272
Views: 59,444
Posted By Arlington
Re: 128 Widening

Driving from Providence to Lexington takes one across the new sections in Needham-Newton which are looking really good. I think it loooks quite doable for the whole Newton-and-southward arc to be...
Forum: Development Projects 07-26-2018, 03:35 PM
Replies: 1,745
Views: 311,779
Posted By Arlington
Re: Encore Boston Harbor Casino | Everett

at any rate, the fish die-of is not related to the Casino.
Forum: Development Projects 07-25-2018, 04:14 PM
Replies: 3,098
Views: 733,715
Posted By Arlington
Re: The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

Sorry to repeat myself: when does the direct connection from Commuter Rail to Subway open?
Forum: Transit and Infrastructure 07-13-2018, 10:02 AM
Replies: 51
Views: 6,214
Posted By Arlington
Re: MBTA is Considering a Complete Green Line Replacement.

This.

Same goes for why the steel part of the Lechmere viaduct has to be replaced (trains get heavier and more power-hungry as they've already gotten about 2x to 4x longer and heavier than the...
Forum: General 07-03-2018, 04:17 PM
Replies: 223
Views: 37,251
Posted By Arlington
Re: Educate everyone on a good website...

Boston Public Library collections (and the larger Digital Commonwealth Collections)
Tichnor Brothers Postcard Collection (https://www.digitalcommonwealth.org/collections/commonwealth:0p096w19r)...
Forum: Development Projects 07-03-2018, 12:53 PM
Replies: 2,038
Views: 533,153
Posted By Arlington
Re: Assembly Row (Assembly Sq Redevelopment) | Assembly Square | Somerville

^ Xfinity store here is better than driving to Malden and more transit accessible than the one on the Cambridge - Somerville line.
Forum: Transit and Infrastructure 07-03-2018, 09:18 AM
Replies: 1,213
Views: 182,608
Posted By Arlington
Re: Silver Line to Chelsea

Somebody at ArchBoston must have a better answer than I did, yes? I'm glad I tried addressing it as an information problem (nail the up/down times to power predictive re-routes, instead of reactive)....
Forum: Transit and Infrastructure 07-01-2018, 04:26 PM
Replies: 581
Views: 92,930
Posted By Arlington
Re: MBTA Bus & BRT

Oh please,, yes.
Forum: Transit and Infrastructure 07-01-2018, 04:23 PM
Replies: 9
Views: 1,417
Posted By Arlington
Re: South Bank Bridge Project | West End

PDF hard from a handheld. What is the proposed budget and schedule?
Forum: Transit and Infrastructure 06-29-2018, 05:52 PM
Replies: 1,213
Views: 182,608
Posted By Arlington
Re: Silver Line to Chelsea

I divided my points into 1 & 2 specifically to say that doing "2.x" wasn't really doing that thing until you *actually knew in advance* when the bridge was going up and could get all the re-routes...
Showing results 1 to 25 of 500

 
Forum Jump

All times are GMT -5. The time now is 07:00 PM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.