archBOSTON.org

Go Back   archBOSTON.org > Search Forums

Showing results 1 to 25 of 500
Search took 0.09 seconds.
Search: Posts Made By: Arlington
Forum: Transit and Infrastructure Yesterday, 05:26 PM
Replies: 374
Views: 61,187
Posted By Arlington
Re: Biking the Boston 'Burbs (Trails, MDC, & Towns beyond Hubway area)

Medford continues to click the parts into place for the "missing link" Clippership Connector, which will connect the Medford Square Mystic riverfront (and other Somerville-Medford-Winchester trails)...
Forum: Transit and Infrastructure Yesterday, 01:52 PM
Replies: 374
Views: 61,187
Posted By Arlington
Re: Biking the Boston 'Burbs (Trails, MDC, & Towns beyond Hubway area)

2018 list of $4m going to 70+trails
https://www.mass.gov/guides/recreational-trails-program
Forum: Transit and Infrastructure 08-13-2018, 09:08 AM
Replies: 5,340
Views: 672,594
Posted By Arlington
Re: General MBTA Discussion Thread

Maybe this time Alewife garage will get the levels 6&7 its original columns, lobby, and elevators were built for.
Forum: Greater New England 08-12-2018, 04:35 PM
Replies: 2
Views: 280
Posted By Arlington
Re: Providence Transit

I started a Providence RIPTA thread (http://www.archboston.org/community/showthread.php?t=4265) in 2012 for similar projects, can we keep it all in one thread?
Forum: Development Projects 08-06-2018, 07:34 PM
Replies: 2,987
Views: 707,193
Posted By Arlington
Re: The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

That seems to include the CR<-->GL/OL connector, too. <grateful/>
Forum: Transit and Infrastructure 08-06-2018, 11:16 AM
Replies: 5,340
Views: 672,594
Posted By Arlington
Re: General MBTA Discussion Thread

I love this, or one that runs on Congress St NS-Haymarket-Fidi-SS in a reservation. We could be doing so much awesome with buses in the core, yet we content ourselves to have Everett take the lead.
Forum: Development Projects 08-03-2018, 11:06 PM
Replies: 2,987
Views: 707,193
Posted By Arlington
Forum: Development Projects 08-03-2018, 10:57 AM
Replies: 2,987
Views: 707,193
Posted By Arlington
Re: The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

Maybe start a thread on modern sacred spaces? (what's the address of the nursing home?)
Forum: Transit and Infrastructure 07-31-2018, 01:57 PM
Replies: 3,253
Views: 402,705
Posted By Arlington
Re: Biking in Boston

Who controls the Grand Junction Path in Cambridge/Kendall between Broadway and Main? Is that MIT, Cambridge or a PPP?

I ask because the sprinklers come on at 2pm, which can't be right...chasing...
Forum: Transit and Infrastructure 07-30-2018, 06:25 AM
Replies: 2,862
Views: 454,450
Posted By Arlington
Re: Green Line Extension to Medford & Union Sq

^ which is why they saw the need for fare gates and 4-car platforms (before going with POP fare system to save on station costs)
Forum: Transit and Infrastructure 07-27-2018, 02:46 PM
Replies: 272
Views: 58,824
Posted By Arlington
Re: 128 Widening

Driving from Providence to Lexington takes one across the new sections in Needham-Newton which are looking really good. I think it loooks quite doable for the whole Newton-and-southward arc to be...
Forum: Development Projects 07-26-2018, 03:35 PM
Replies: 1,657
Views: 293,970
Posted By Arlington
Re: Encore Boston Harbor Casino | Everett

at any rate, the fish die-of is not related to the Casino.
Forum: Development Projects 07-25-2018, 04:14 PM
Replies: 2,987
Views: 707,193
Posted By Arlington
Re: The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

Sorry to repeat myself: when does the direct connection from Commuter Rail to Subway open?
Forum: Transit and Infrastructure 07-13-2018, 10:02 AM
Replies: 47
Views: 5,293
Posted By Arlington
Re: MBTA is Considering a Complete Green Line Replacement.

This.

Same goes for why the steel part of the Lechmere viaduct has to be replaced (trains get heavier and more power-hungry as they've already gotten about 2x to 4x longer and heavier than the...
Forum: General 07-03-2018, 04:17 PM
Replies: 223
Views: 36,988
Posted By Arlington
Re: Educate everyone on a good website...

Boston Public Library collections (and the larger Digital Commonwealth Collections)
Tichnor Brothers Postcard Collection (https://www.digitalcommonwealth.org/collections/commonwealth:0p096w19r)...
Forum: Development Projects 07-03-2018, 12:53 PM
Replies: 2,038
Views: 527,790
Posted By Arlington
Re: Assembly Row (Assembly Sq Redevelopment) | Assembly Square | Somerville

^ Xfinity store here is better than driving to Malden and more transit accessible than the one on the Cambridge - Somerville line.
Forum: Transit and Infrastructure 07-03-2018, 09:18 AM
Replies: 1,211
Views: 179,777
Posted By Arlington
Re: Silver Line to Chelsea

Somebody at ArchBoston must have a better answer than I did, yes? I'm glad I tried addressing it as an information problem (nail the up/down times to power predictive re-routes, instead of reactive)....
Forum: Transit and Infrastructure 07-01-2018, 04:26 PM
Replies: 570
Views: 90,883
Posted By Arlington
Re: MBTA Bus & BRT

Oh please,, yes.
Forum: Transit and Infrastructure 07-01-2018, 04:23 PM
Replies: 9
Views: 1,345
Posted By Arlington
Re: South Bank Bridge Project | West End

PDF hard from a handheld. What is the proposed budget and schedule?
Forum: Transit and Infrastructure 06-29-2018, 05:52 PM
Replies: 1,211
Views: 179,777
Posted By Arlington
Re: Silver Line to Chelsea

I divided my points into 1 & 2 specifically to say that doing "2.x" wasn't really doing that thing until you *actually knew in advance* when the bridge was going up and could get all the re-routes...
Forum: Transit and Infrastructure 06-29-2018, 05:08 PM
Replies: 1,211
Views: 179,777
Posted By Arlington
Re: Silver Line to Chelsea

Solve it as an information problem:

Information:
1.0) T should know when high tides are, so that it can warn on variable message signs/audio: "bridge raisings likely during next two high tides"...
Forum: Transit and Infrastructure 06-25-2018, 07:45 PM
Replies: 1,205
Views: 183,715
Posted By Arlington
Re: North-South Rail Link

Riverside: we are asking you to revise a number that says something (anything) costs nearly a TRILLION dollars per year. That's so big an error that it is probably both an -illions problem and a...
Forum: Development Projects 06-15-2018, 06:25 AM
Replies: 2,987
Views: 707,193
Posted By Arlington
Re: The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

Thanks! It will cut 4 minutes each way for thousands (ten thousand?) Of people per day.
Forum: Design a Better Boston 06-14-2018, 03:21 PM
Replies: 1,457
Views: 187,829
Posted By Arlington
Re: Reasonable Transit Pitches

The Northside I-93 southbound HOV lanes should be extended North to Roosevelt Circle (Fellsway West in Medford), and the hours extended 6AM to 10pm.

I would also like to see an HOV on the...
Forum: Development Projects 06-14-2018, 07:31 AM
Replies: 2,987
Views: 707,193
Posted By Arlington
Re: The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

All I ask is that the CR-Subway connection open ASAP.
Showing results 1 to 25 of 500

 
Forum Jump

All times are GMT -5. The time now is 02:54 AM.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.